RE: Plant operating problem ??? reason for drop20 May 2024 10:22
I think it is just referring to the unplanned downtime. All mining operations have repairs, maintenance periods:
"Process Plant
During Q1 2024 most aspects of the process plant performed adequately with a high average recovery rate of 90.0% (Q4 2023: 85.9%).
Planned downtime included scheduled maintenance to the SAG mill girth gear. Unplanned downtime consisted mainly of repairs to the SAG mill girth gear, pinion and feed chute, to conveyor belt repairs/replacement, and to tails/return water lines."
Gold produced during Q1 2024 was 23,006 ounces (Q4 2023: 17,626 ounces) from ore milled in Q1 2024 of 581Kt (Q4 2023: 533Kt).
Mining operations were above forecast:
Mining Operations
Mining production of ore and waste for Q1 2024 was above forecast at 3.31Mt (Q4 2023: 2.83Mt), with a total of 678Kt of ore mined in Q1 2024 (Q4 2023: 534kt)."