KINUSI | COPPER
Synopsis
Kinusi includes a series of 10 licenses in a known copper hosting area, which has been exposed over the years to become a highly sought-after prospecting target. High grades of 7.0% Cu have been sampled with some reaching 31% Cu in value. Regardless of these results, we have modelled based on a discounted 3% Copper content in the ore based on large-scale mining. The ore is hosted within the pegmatite dykes showing consistency in strike and dip, with all artisanal operations mining at shallow depths of 4m below surface.
The current exploration programme has resulted in a resource increase from 5MT to 15MT and is anticipated to increase to 50MT as prospecting continues. The next phase of exploration is being finalized and will include diamond drilling, geophysical surveys and a variety of primary and secondary interpretation methods.
In the interim, access to current feedstock from previous mining at Kinusi as well as smaller surrounding mines proves profitable for short-term returns until exploration and establishment activities conclude.
Statistics
Project
Country
Tanzania
JV Company
Marula Mining
Life of Mine
+ 10 years
Resources
Measured
–
Indicated
–
Inferred
10 Mt
Mineralisation
Copper
3,00%
Gold
*
Investment Strategy
PHASE 1
Exploration | Budget has been applied to drill up the project to JORC compliant resources and conduct necessary metallurgical and engineering studies to maximize product potential on the project Infrastructure | Phase 1 Infrastructure is purely for a pilot concentrating plant to process the currently accessible feedstock available on the project until mining activities on the known areas start.
• Equity –
• Explore – $ 5 321 000
• Infra – $ 1 500 000
• Establish – $ 2 370 862
PHASE 2
Exploration | Further opportunities to increase the exploration are may arise, but no further exploration beyond Phase 1 is currently projected. Infrastructure | Plans to increase processing facilities from Phase 1 pilot plant to scale copper concentrate outputs and the potential. Gold potential may necessitate additional infrastructure to be determined based on economic evaluation in Phase 1
• Equity –
• Explore –
• Infra – $ 40 653 633
• Establish – $ 2 371 042