Premier African Minerals recently completed a technical audit of the Zulu Lithium and Tantalum Project in Zimbabwe, focusing on plant performance and operational readiness.
Here’s a detailed breakdown of the consultant findings and broader context:
🔍 Consultant Audit Highlights (November 2025)
• Audit Scope: Conducted by an engineering team, the audit assessed:
• Pumping and pipeline performance
• Water and mass balance systems
• Overall processing plant efficiency
• Findings:
• The audit confirmed that the plant infrastructure is largely in place.
• Key bottlenecks were identified in water management and pipeline throughput.
• Recommendations were made to optimize SC6 (spodumene concentrate) recovery and reduce downtime.