RE: Wishbone Gold BEFORE @Hole 1 Assay. Mon, 20 Oct 202520 Oct 2025 20:05
@news
First of all, you're making a calculation that's correct, but you're using the wrong numbers and apparently without considering whether the result actually matches what can be seen on the ground.
Your calculation:
TOTAL DISTANCE:
Hole 2 is 2 km from Hole 1. Hole 3 is 1.6 km = 3.6 km vs. Havieron's 3.5 km continuity-proven [expert requires to see continuity as the norm].
When I ask you about this because I haven't read anywhere about a 2 km distance between the new boreholes, you quickly say it's a typo. Then you say you actually copied a typo from me, which is on a satellite photo of Red Setter in a post I made on X.
But where does that 1.6 km come from? Right, from Wishbone Gold's October 17 RNS.
"Diamond drilling on hole 2 (25RSDD002) was completed at 950m and has now moved to a planned 500m deep drill hole (hole 3) located 1.6 km north of holes 1 and 2."
So I copied that from WSBN, and so you're now claiming that Wishbone Gold actually has a TYPO in their RNS or that they made a mistake.
Appears I COPIED YOUR "MISTAKE = TYPO" isn't it?
Indeed, I know the distances, but apparently you don't. You just write whatever you want, and when you're challenged about it, you start defending yourself with all sorts of strange claims.
Nevertheless, I appreciate many of your posts, but if there are incorrect calculations or something like that, I will respond. The main goal is to inform people with the most accurate information possible. And in this case, your calculation was correct, just based on incorrect data.
DYOR
GLA