RE: So basically to conclude this deramper group28 Jun 2025 20:41
Yes, I think we will receive export permit soon, nothing to do with nameplate or such thing. LMLM/KMUK have an agreement about this in the MOU with MG and for what I read (and by that, my thinking/conclusions), next month the Export Permit will be delivered.
But, once received, we still have to transport our SC to Abidjan to get it on a ship. That will take time again.
How much time, depends on what cargo Hainan wants to send to their plant as first delivery and how many trucks/trip available.
Ganfeng did their first transport of 35,000 tons in about maximum 70 days (time between loading first trucks in April and the ship leaving Abidjan). That are +/- 600 loads/trucks of 60ton but question is, how big are the convoys and what is traveling time to Abidjan and back to Goulamina.
More questions but most important point for Kodal, next month the LMLB SC transport needs to start.
DYOR
GLA