RE: Will Next Major Push be TODAY or TOMORROW Before AGM on Thursday?11 Mar 2025 07:48
To keep things in perspective.
Always best to stick to the facts rather than the fiction posted by our numerous βNEGATIVEβ posters.
1: Oil pipe line from TAMSAG Basin to refinery completes later this year.
2: Refinery builder stated Sept 2024 the refinery will be completed by March 2026.
Mongolia refinery needs 30,000 bopd to run at 100% capacity, right now Mongolia daily production is not enough to run the refinery at even 30% capacity, no doubt Mongolia will accept running the refinery at 30 to 40% capacity initially, but if they are to cut fuel imports they must get drilling and increase daily crude production by at least 300%.
We know Petro China half of the Tamsag Basin has been heavily drilled since 2005, MATADs half of the TAMSAG Basin (Heron field) is still unexplored, only two wells drilled.
90% of Mongolias oil comes from Petro China Tamsag field which is approaching end of life, best oil prospects already drilled, they need MATADs Heron field.