Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZanaga Iron Share News (ZIOC)

Share Price Information for Zanaga Iron (ZIOC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.69
Bid: 7.40
Ask: 7.98
Change: 0.09 (1.18%)
Spread: 0.58 (7.838%)
Open: 7.60
High: 0.00
Low: 0.00
Prev. Close: 7.60
ZIOC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zanaga Iron Ore Expects Low Congo Project Capital Costs After Testing

Thu, 28th Mar 2019 11:35

LONDON (Alliance News) - Zanaga Iron Ore Co Ltd on Thursday said its early production project in the Congo is expected to be a low capital cost development based on bulk sample testing.

Shares in Zanaga, which owns 50% of the Zanaga Iron Ore project less one share, were down 6.9% at 9.22 pence on Thursday. Glencore PLC owns the other half plus one share.

Zanaga said it is targeting a less than USD50 million of capital costs to create an iron ore pellet feed project or USD110 million to create a full iron ore pellet project.

Moreover, substantial plant technical work for the early production plant is complete, with samples having already been selected from a work programme at the Zanaga project, including bulk sample testing.

From this testing, it has been estimated that a 1 million tonnes per annum pellet feed concentrate plant would have capital costs of USD38 million. Its operating costs would be USD3.35 per tonne of ore for the entire run of the mine - excluding power - and it would be fully installed on site within 22 months. The target product grade would be more than 65% iron.

For the pelletising of the pellet feed concentrate into a higher value product, the high-level indicative cost estimate is between USD50 million and USD60 million with a power consumption estimate of 4.0 to 4.5 megawatts. The operating costs for this type of project have not yet been defined.

Zanaga Non-Executive Chair Clifford Elphick said: "It is pleasing to see that gradually the Zanaga project is passing critical milestones in assessing the viability of the early production project, with significant successes in defining a milling solution and ensuring product beneficiation aimed at achieving targeted quality outcomes at the proposed process plant. This is an important element in the evaluation of the viability and economic feasibility of the [early production project]. We look forward to providing an update to our shareholders in due course."

Zanga's ultimate goal is to develop a larger staged development mining project that would produce 30 million tonnes per annum of iron ore, stage one of this being to produce 12 million tonnes per annum with a capital cost of around USD2.2 billion. The second stage would have associated capital expenditure of USD2.5 billion and could be financed with cash flows from stage one.

More News
25 Jun 2014 12:02

Zanaga Iron Ore Pretax Loss Widens On Expenses, Investment Losses

Read more
8 May 2014 11:56

Zanaga Iron Ore to develop Congo project in phases

AIM-listed Zanaga Iron Ore is considering developing a project in the Republic of Congo on a phased basis, leading to a fall in its shares. A feasibility study had confirmed the "attractive economics" of its Zanaga iron ore project, but on the basis of a staged development, the group said. Stage

Read more
8 May 2014 11:07

Zanaga Iron Ore Plans Staged Mine Development After Feasibility Study

LONDON (Alliance News) - Zanaga Iron Ore Co Thursday said the feasibility study it conducted at the Zanaga Iron Ore Project had shown that a staged development process at the site would be better than a single-stage development, and it has now applied for a mining licence and environmental permit

Read more
15 Apr 2014 08:56

Zanaga Iron Ore Nears Completion Of Feasibility Study

LONDON (Alliance News) - Zanaga Iron Ore Co Tuesday said the Feasibility Study on its Zanaga Iron Ore Project, located in the Republic of Congo, is currently in the final stages of completion. The iron-ore processing-and-transport infrastructure company said the results from its feasibility

Read more
15 Apr 2014 07:50

UK MORNING BRIEFING: Aggreko Leads After Mixed Results

LONDON (Alliance News) - Aggreko is leading the FTSE 100 in early trading Tuesday after the temporary power company said it has seen mixed results in its first quarter, with strong underlying revenue growth in two of its three regions being impacted by adverse currency movements as previously exp

Read more
18 Mar 2014 14:42

Sector movers: Industrial metal stocks gain after Putin comments

Industrial metals and mining stocks, which have suffered heavy falls over the last month, experienced a brief respite on Tuesday as global financial markets reacted positively to comments from Vladimir Putin. Following Sunday's referendum, which saw Crimean locals vote overwhelmingly to join Russia

Read more
30 Sep 2013 07:22

Zanaga Iron Ore Pretax Losses Almost Double On Admin Expenses

Read more
13 Sep 2013 11:27

STOCKS NEWS EUROPE-UK small caps rise 0.7 pct, outstrip FTSE

UK small caps and junior-listed AIM shares rise 0.7 and 0.1 percent, respectively, outperforming the blue chips, which fall by 0.3 percent. Redhall slumps 17.9 percent, the top AIM-listed faller, after the engineering firm gives a disappointing trading update, with results now expected to m

Read more
13 Sep 2013 07:56

Glencore cuts initial spend on Zanaga, eyes funding options

LONDON, Sept 13 (Reuters) - Glencore Xstrata and junior partner Zanaga Iron Ore Company (ZIOC) have cut back planned spending on the early stages of the co-owned Zanaga project and announced on Friday a joint search for funding. News of a revised project design - which will mean lower expen

Read more
13 Sep 2013 07:02

Glencore, Zanaga Iron Ore Change Terms On Joint Venture

Read more
21 Jul 2013 21:00

Minor miners face major headache from iron ore giants

* Slim chances for juniors iron ore miners as lower prices loom * Many running short on cash and finding few options for funds * Vale, Rio, BHP better able to withstand dips in iron ore price cycle By James Regan SYDNEY, July 22 (Reuters) - From Africa to Australia, opport

Read more
25 Apr 2013 09:07

Thursday broker round-up UPDATE

Barclays: Morgan Stanley lowers target price from 438p to 424p and reiterates an overweight rating. Bellzone Mining: Investec reduces target price from 21p to 5.28p and downgrades to hold. BG Group: Bank of America cuts target price from 1300p to 1250p retaining a neutral rating. Brown (N) Group:

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.