We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Share News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.45
Bid: 2.40
Ask: 2.50
Change: 0.00 (0.00%)
Spread: 0.10 (4.167%)
Open: 2.45
High: 2.45
Low: 2.45
Prev. Close: 2.45
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Landore reports exploration progress at Junior Lake

Mon, 17th May 2021 09:59

(Sharecast News) - Landore Resources updated the market on progress of the drilling programme for 2020-2021 on the BAM gold deposit at the Junior Lake property in Ontario, Canada on Monday.
The AIM-traded firm said drilling below the BAM East defined pit had consistently intersected the deposit's typical lithology and mineralisation, including the frequent sighting of visible gold.

Bonanza-grade gold was intersected in drill hole 0421-785, reporting 432 grams of gold per tonne over 0.32 metres.

Additional drill holes were planned to test for continuity of the zone around and between the two high-grade intercepts on lines 2650E and 2850E.

Step out drilling from the BAM Gold Deposit, to the east for 1,100 metres and to the west for 1,200 metres at 100 metre spacing, had intersected lithology and mineralisation similar to the BAM Gold deposit.

Modelling had started to determine the next round of drilling in those areas.

Landore said the planned 23,000 metre drilling programme was scheduled to restart on 19 May, following the pause for the spring thaw.

To date, a total of 15,903 metres of 'HQ' diamond core drilling, comprising 68 drill holes, has been completed.

"Interpretive work and conceptual modelling conducted by Landore's senior geological consultant and independent engineers has indicated the gold mineralization resides within a series of tabular shaped zones oriented in a roughly en-echelon configuration, generally parallel to the overall strike of the host rock units," the board said in its statement.

"Shoots of significant gold mineralization within the BAM gold deposit's east pit and west pit zones are interpreted to dip approximately 30 degrees to the west.

"Preliminary interpretation of drilling results has indicated the potential for repeating shoots of significant gold mineralisation along strike east and west of the defined BAM gold deposit resource."

It said results from the 2019-2020 soil-till sampling programs conducted west along strike for about seven kilometres and east for around two kilometres from the BAM deposit further supported the potential for "significant" gold mineralisation in those areas.

"Soil-till sampling has established the presence of widespread anomalous gold and multiple gold trends, confirming the potential of this area to contain extensions of the BAM gold deposit.

"Exploration drilling currently in progress will follow up on these encouraging results to confirm the presence of repeating gold-bearing shoots along strike east and west of the defined BAM gold deposit."

At 0942 BST, shares in Landore Resources were down 2.66% at 32.51p.
More News
8 Dec 2015 09:11

Landore Resources begins drilling campaign in Ontario

(ShareCast News) - Mineral explorer Landore Resources has kicked off a drilling and geophysics campaign on the Junior Lake nickel-copper PGE site in Ontario. The London-listed company said it has begun the programme, which consists of 2,500 metre, nine-hole diamond NQ, drilling programme on the B4-7

Read more
30 Oct 2015 16:20

Landore Resources Raises Funds In Share Placing (ALLISS)

Read more
12 Oct 2015 10:32

Landore: New Study Shows Further Exploration Warranted At Junior Lake

Read more
12 Oct 2015 10:05

Landore Resources boosted by report on Junior Lake site

(ShareCast News) - Landore Resources said a mineral potential investigation on its Canadian base metals delivered positive results. In a statement released on Monday, the London-listed mining company said the investigation, which was carried out by engineering group RPA, revealed there was excellent

Read more
29 Sep 2015 08:53

Landore Pushes Ahead With Three-Stage Programme At Junior Lake

Read more
21 Sep 2015 09:33

Landore Identifies New Exploration Targets At Junior Lake Property

Read more
7 Jul 2015 09:24

Landore Resources Starts Independent Review Of Junior Lake Project

Read more
30 Jun 2015 12:15

Landore Resources Chairman Bill Humphries Switches To Chief Executive

Read more
19 May 2015 09:55

Landore Annual Pretax Loss Doubles On Loan Note Impairment Charge

Read more
13 Apr 2015 07:21

LONDON MORNING BRIEFING: easyJet And ICAP Poach New CFOs

Read more
13 Apr 2015 06:40

Landore Gets Positive Results From Junior Lake Drilling Campaign

Read more
29 Jan 2015 10:35

Landore To Start Winter Drilling Campaign At Junior Lake

Read more
23 Sep 2014 10:26

Landore Loss Narrows As Costs Fall; Second Junior Lake Drilling Campaign

Read more
15 Sep 2014 09:45

Landore Resources Intersects Copper/Gold Structure In Ontario

Read more
19 Aug 2014 09:12

Landore Resources Finds Sulphide Mineralisation At Junior Lake, Canada

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.