Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFRX.L Share News (FRX)

  • There is currently no data for FRX

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Ferrex Study Shows Potential For Low Operating Costs At Mebaga Project

Wed, 13th Aug 2014 09:07

LONDON (Alliance News) - Ferrex PLC Wednesday said a desktop study on operations and associated costs found significant potential for low operating costs at the Mebaga direct-shipping iron ore project in Gabon.

Direct-shipping iron ore deposits contain high quantities of hematite or magnetite, and are generally in the 62-64% iron range.

Ferrex said the study included two operational scenarios. Scenario A showed a free-on-board direct shipping ore cost of USD45 per tonne of direct-shipping iron ore, while B showed free-on-board direct shipping ore cost of USD41 per tonne.

"We are very encouraged by the results of this desktop study which, with a FOB cost of between $41/t and $45/t for both operational scenarios, demonstrates the significant potential for low operating costs at Mebaga," said Ferrex Managing Director Dave Reeves.

Ferrex shares were untraded on Wednesday, quoted at 1.275 pence.

By Sam Unsted; samunsted@alliancenews.com; @SamUAtAlliance

Copyright 2014 Alliance News Limited. All Rights Reserved.

More News

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.