HOUSTON, March 16 (Reuters) - The 65,000 barrel per day(bpd) gasoine-producing fluidic catalytic cracking unit at BPPlc's 413,500 bpd Whiting, Indiana, Refinery remainedshut on Monday for repairs, said sources familiar with plantoperations.
The FCCU, which is the smaller of the two at the refinery,was shut on March 8. The unit has been shut twice this month forrepairs due problems with a compressor, the sources said.
(Reporting by Erwin Seba; Editing by Chizu Nomiyama)