The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Share News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.725
Bid: 0.70
Ask: 0.75
Change: 0.00 (0.00%)
Spread: 0.05 (7.143%)
Open: 0.725
High: 0.725
Low: 0.725
Prev. Close: 0.725
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Armadale appoints Xinhai Mineral for Mahenge test work

Tue, 24th Nov 2020 09:17

(Sharecast News) - Armadale Capital reported on Tuesday that engineering, procurement, construction and manufacturing company Xinhai Mineral, part of the Chinese Yantai Xinhai group, had been selected to start metallurgical bulk test work as part of the first phase of the front-end engineering design (FEED) studies for the development of the Mahenge graphite project.
The AIM-traded firm said the objective of the bulk test work was to provide sufficient data to confirm the results underpinning the definitive feasibility study, and confirm the preferred flow sheet prior to the completion of the front-end engineering design to develop an EPCM fixed-price contract.

As part of the process, bulk ore samples were selected from diamond core to produce a blend of 22% oxide ore and 78% fresh ore, with an average grade of between 12% and 14 % TGC, which the company said was representative of the life-of-mine production profile.

The objectives of this test work would include confirming overall rates of graphite recovery for all material types, maximising graphite flake sizes to achieve a minimum of 50% in excess of 150 microns, and achieving a minimum grade of 95% TGC in all size fractions.

Bulk ore samples had been despatched and received by Xinhai Mineral, with test work to start this week.

Xinhai would then use the data in the final design of the processing plant.

"Xinhai are a highly experienced Chinese contracting group and leaders in their field of optimising mineral processing solutions, mine design and build and equipment manufacturing, and we very much look forward to working with them," said chairman Nick Johansen.

"We are also pleased to report that our first bulk ore samples have now been received by Xinhai who are due to begin work upon these imminently with the objective of completing a metallurgical test programme to enable the detailed selection of the processing plant equipment."

Johansen said development efforts were "gathering pace" at Mahange, and in addition to the appointment of Xinhai Mineral, Armadale announced that, following a positive site visit and follow-up consultation, the environmental and social impact assessment was also progressing.

"The assessment is one of the final necessary components in the mining licence process and receipt of a licence will be one of the final and most important de-risking milestones for the project.

"Our financing discussions are also progressing well and we continue to see strong levels of interest as we ensure that we put the best options forward for shareholders at this exciting stage of development for Armadale."

At 1633 GMT, shares in Armadale Capital were down 1.27% at 3.9p.
More News

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.