The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Interim Management Statement

18 May 2009 07:00

RNS Number : 3849S
Lamprell plc
18 May 2009
 



18 May 2009

LAMPRELL PLC ("Lamprell" or the "Group")

INTERIM MANAGEMENT STATEMENT

Lamprell (ticker: LAM), a leading provider of specialist engineering services to the international oil & gas industry, issues the following Interim Management Statement for the period 1 January 2009 to 17 May 2009. 

The performance to date has been broadly in line with management expectations although the Group continues to experience challenging trading conditions.

The Board continues to devote considerable time to the effective management of the Group's cost base, thresults of which, a large reduction both in the number of labour supply personnel employed and in the amount of hired equipment being utilised, are now being felt. In addition, the procurement group has started to establish a number of strategic agreements with various suppliers and this initiative is expected to deliver significant cost savings throughout 2009 and beyond.

From an operating perspective Lamprell continues to focus on maintaining high standards of project execution, with a particular emphasis on quality and safety, whilst delivering projects both on time and on budget. These core values have resulted in the successful delivery of Lamprell's first Engineering, Procurement and Construction ("EPC") projects, the Seajacks Kraken for Seajacks International Limited ("Seajacks"), and the Scorpion Offshore Freedom for Scorpion Offshore Ltd ("Scorpion"). Work continues on the remaining EPC projects, the jackup rig, the Scorpion Offshore Mischief, as well as the second Seajacks liftboat, the Seajacks Leviathan, and BassDrill Limited tender barge Alpha. The Company remains in discussion with Riginvest G.P. regarding financing options of the LeTourneau Super 116E jackup drilling rig project.

 In rig refurbishment we have worked on 11 jackup rigs at our Sharjah and Hamriyah facilities since January, including 3 jackup rigs at our new Hamriyah facility whilst our Sattahip facility in Thailand has secured and worked on its first jackup rig, the Ensco 51. In Jebel Ali work is proceeding on the Saipem Livorno process modules for Saipem SPA and the spud can extensions for Master Marine ASA. 

We have continued to see high levels of enquiries for our services in most sectors of our business, and whilst recognising the potential weakening of the rig refurbishment market, the Board remains optimistic that the long term prospects of the Group remain promising.

The Group's order book at the end of April was approximately US$ 487 million, comprising approximately US$ 426 million from EPC projects and approximately US$ 29 from Floating Production, Storage and Offloading projects. The Group's financial position has not changed significantly from 31 December 2008, with the Group's balance sheet remaining strong.

- Ends -

Enquiries:

Lamprell plc  +44 (0)20 7153 1547

Nigel McCue, Chief Executive Officer

Scott Doak, Chief Financial Officer

Peter Whitbread, Director of International Development 

M:Communications, London  Patrick d'Ancona +44 (0)20 7153 1547

Georgina Briscoe +44 (0)20 7153 1548

Charlotte Kirkham +44 (0)20 7153 1531

Notes to editors 

Lamprell, based in the UAE, has played an increasingly prominent role in the development of the offshore industry in the Arabian Gulf for over 30 years, in later years providing specialised services to the offshore oil and gas industry. 

Lamprell's three primary facilities are in Port Khalid and the Hamriyah Free Zone, in the Emirate of Sharjah, and in the Jebel Ali Free Zone, in the Emirate of Dubai, all of which are in the UAE.

The principal markets in which Lamprell operates, and the principal services it provides, are:

 

Upgrade and refurbishment of offshore jackup rigs; Engineering, procurement and construction of jackup rigs, liftboats and drilling related equipment; New build construction for the offshore oil and gas sector, including Floating Production, Storage and Offloading systems and other offshore and onshore structures; and Oilfield engineering services, including the upgrade, refurbishment and new building of land rigs.

 

 

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSARMTTMMMBTAL

Related Shares

Back to RNS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.