REMINDER: Our focusIR Investor Webinar takes place TONIGHT with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zardab Operational Update

19 Dec 2017 07:30

RNS Number : 7527Z
Zenith Energy Ltd
19 December 2017
 

December 19, 2017 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 ("MAR"). Upon publication of this announcement via a regulatory information service ("RIS"), the inside information contained in this document is now considered to be in the public domain.

 

 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Zardab Field Operational Update

 

 

 

Zenith Energy Ltd., ("Zenith" or the "Company"),(LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to provide an operational update on wells Z-28 and Z-21 in the Zardab field, Azerbaijan.

 

 

High-impact workover of well Z-28

 

The Company confirms that it has cleaned out well Z-28 to reach the top of the slotted liner at a depth of 3574 metres. The top of the tubing can now be cleaned to total depth ("TD") at 3944 metres. As announced by Zenith on November 20, 2017, the inside of the tubing has been cleaned out to the depth of 3582, 14 metres deeper than the reported liner top (3568 metres) in the original well data. Zenith's operational team views this as a major accomplishment in the context of the well intervention, particularly as this was achieved following successful fishing operations, including the running in hole of a free point tool, enabling the tubing to be cut and jarred. Once this was carried out, Zenith's operational team ran in the production tubing to a depth of 3574 metres, set the wellhead and fully completed the rigging down process of the ZJ30 truck-mounted workover rig on December 18, 2017. The Z-28 wellsite is now clear and preparations have been completed to run a coiled tubing unit ("CTU") to TD from the top of the slotted liner.

 

In the post-workover inspection of the wellhead, Zenith's petroleum engineers observed a leak during a pressure test from the wellhead in the 9 5/8 inches casing seal assembly.

 

To resolve this problem, the Company has contracted a UK-based, worldwide leader in oilfield leak-sealing technology, with an established presence in Azerbaijan. Zenith has been informed that various resin compounds will be required to successfully seal the wellhead following an engineering study currently underway by the aforementioned company. Zenith expects the estimated completion time of this study to be delayed by the upcoming holiday season in the United Kingdom and Azerbaijan, and to have fully completed the workover of well Z-28 by the end of January 2018.

 

The Company's operational team is highly committed to completing the Z-28 high-impact workover successfully and without incident. The risk of compromising the integrity of the wellhead by running the CTU to TD, specifically with the leaks from the casing on the wellhead observed, has been determined to be an imprudent risk that may have endangered the success of the Z-28 workover and resulted in a blowout.

 

The Company will provide an update when the wellhead leaks are fully sealed and the CTU has subsequently been mobilised and run in the hole.

 

High-impact workover of well Z-21

 

The Company confirms that civil works on the roads to well Z-21 and at the well location have been fully completed.

 

The average wellhead pressure recorded has increased from 3675 psi, announced by the Company on November 20, 2017, to a current average shut-in tubing and shut-in annulus pressure reading of 4115 psi.

 

Zenith's operational team is currently mobilising a workover rig to the wellsite to begin the high-impact workover of well Z-21 without delay.

 

The Company will provide an update when the workover of well Z-21 begins following the mobilisation of all necessary equipment.

 

 

Mike Palmer, Chief Operating Officer, Zenith Aran, the Company's Azerbaijan-based fully owned subsidiary, commented:

 

"I know that operations at Z-28 may appear to have taken a long time. However, from the outset there was relatively little in terms of data on this well, and we have progressively established that what data we had was incorrect. From all the work we have done we now understand this well, specifically the downhole configuration, characteristics and behaviour. Indeed, from what our team has seen in well Z-21 it is clear that there is a very strong prospective pressure in the formation that these wells produce from. We are convinced that there is a big prize to be had once we finish. We have been good stewards with the money invested in the operations so far and have accomplished a great deal in overcoming a number of difficult challenges thrown at us at significant depths. If it wasn't for the wellhead leaks we would actually be in a very good position to complete operations at Z-28, right above the liner with tubing, ready to drill out with a coiled tubing.

It is unfortunate that the seals for the 9 5/8 casing are not holding, causing leaks that must be fixed before we can run a CTU to total depth. We are in contact with one of the top companies in the world specialised in this. Even though the holidays are upon us, we will be working with them to come up with a design that will fix this problem early in January. We are working tirelessly to make sure we come to a positive conclusion as soon as possible, and achieve the great production result that we all believe can be achieved from well Z-28.

 

I am also pleased that, whilst we wait for the seals to be completed at well Z-28, we will soon be in a position to begin the workover of well Z-21.

 

The entire operational team is fully dedicated to achieving the best results possible in a field where we know there are extremely significant quantities of oil to be produced, but where there are also a number of unforeseen challenges presented by old, deep wells with inaccurate well data and old infrastructure that needs repairing."

 

 

For further information please contact:

Zenith Energy Ltd.

Andrea Cattaneo

Chief Executive Officer 

Email: info@zenithenergy.ca

Tel: +1 (587) 315 9031

 

Optiva Securities - (Joint Broker)

Christian Dennis

Tel: + 44 (0) 203 137 1903

 

Beaufort Securities Limited - (Joint Broker) 

Jon Belliss

Tel: +44 207 382 8300 

 

Allenby Capital Limited (Financial Adviser)

Nick Harriss

Nick Athanas

Tel:   + 44 (0) 203 328 5656

 

Yellow Jersey (Financial PR/IR)

Tim Thompson

Tel: +44 (0) 203 735 8825

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLOKCDDOBDKQBD
Date   Source Headline
14th Feb 20206:29 pmRNSFiling of Quarterly Results
14th Feb 20207:00 amRNSInstitutional investment in Zenith
12th Feb 20207:00 amRNSPotential acquisition of major production asset
11th Feb 20207:00 amRNSSuccessful Issue of Bonds & Operational Update
3rd Feb 20205:00 pmRNSHolding(s) in Company
30th Jan 20207:00 amRNSEstablishment of Norwegian Subsidiary
29th Jan 20207:00 amRNSPrivate Placement in Norway
21st Jan 20207:00 amRNSPut and Call Option with AAOG
20th Jan 20207:00 amRNSEUR 25 million EMTN Programme
17th Jan 20207:00 amRNSDirector/PDMR Shareholding
13th Jan 20202:05 pmRNSSecond Price Monitoring Extn
13th Jan 20202:00 pmRNSPrice Monitoring Extension
13th Jan 20201:11 pmRNSAcquisition of AAOG Congo
13th Jan 20207:06 amRNSPut and Call Option Agreement with AAOG
9th Jan 20207:00 amRNSAppointment of Advisor for Development in Africa
6th Jan 20207:00 amRNSLoan to Anglo African Oil & Gas plc
2nd Jan 20207:12 amRNSPreparing for operations in West Africa
30th Dec 20197:00 amRNSDirector/PDMR Shareholding
27th Dec 20197:00 amRNSFirst Acquisition in Africa
23rd Dec 20191:34 pmRNSMedia Speculation
17th Dec 20197:00 amRNSPrivate Placement in Norway
12th Dec 20197:00 amRNSAzerbaijan Operational Update
9th Dec 20197:00 amRNSProposed Acquisition of Norwegian Subsidiary
3rd Dec 20197:00 amRNSAcquisition of Coro Energy Italian Assets
20th Nov 20197:00 amRNS"B+" with Stable Outlook Credit Rating
15th Nov 20197:00 amRNSFiling of Quarterly Results
6th Nov 20197:09 amRNSApproval of Prospectus for EUR 25 million EMTNs
4th Nov 20192:11 pmRNSHolding(s) in Company
4th Nov 20197:06 amRNSProposed acquisition of Norwegian oil company
1st Nov 20197:00 amRNSCompletion of Financing
24th Oct 20197:00 amRNSFurther Reduction of Debt
22nd Oct 20197:00 amRNSIncreased participation Norwegian Private Placemen
21st Oct 201911:09 amRNSPrivate Placement in Norway
18th Oct 20194:38 pmRNSPotential Private Placement in Norway
14th Oct 20197:00 amRNSDrilling Programme and Well Perforation Activities
10th Oct 20197:04 amRNSConfirmation of B+, with Positive Outlook Rating
9th Oct 20192:00 pmRNSPrice Monitoring Extension
9th Oct 201911:00 amRNSPrice Monitoring Extension
9th Oct 20199:00 amRNSPrice Monitoring Extension
9th Oct 20197:00 amRNSC-37 Production Increases
3rd Oct 20194:40 pmRNSSecond Price Monitoring Extn
3rd Oct 20194:35 pmRNSPrice Monitoring Extension
3rd Oct 20197:00 amRNSWell C-37 Results
1st Oct 20197:00 amRNSFurther Reduction of Debt
17th Sep 20197:00 amRNSReduction of Debt
9th Sep 20197:00 amRNSSuccessful Drilling Results
14th Aug 20197:00 amRNSOperational Update
9th Aug 20197:30 amRNSDirector/PDMR Shareholding
7th Aug 20193:59 pmRNSHolding(s) in Company
6th Aug 20197:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.