The next focusIR Investor Webinar takes place tomorrow with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zardab Operational Update

19 Dec 2017 07:30

RNS Number : 7527Z
Zenith Energy Ltd
19 December 2017
 

December 19, 2017 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 ("MAR"). Upon publication of this announcement via a regulatory information service ("RIS"), the inside information contained in this document is now considered to be in the public domain.

 

 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Zardab Field Operational Update

 

 

 

Zenith Energy Ltd., ("Zenith" or the "Company"),(LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to provide an operational update on wells Z-28 and Z-21 in the Zardab field, Azerbaijan.

 

 

High-impact workover of well Z-28

 

The Company confirms that it has cleaned out well Z-28 to reach the top of the slotted liner at a depth of 3574 metres. The top of the tubing can now be cleaned to total depth ("TD") at 3944 metres. As announced by Zenith on November 20, 2017, the inside of the tubing has been cleaned out to the depth of 3582, 14 metres deeper than the reported liner top (3568 metres) in the original well data. Zenith's operational team views this as a major accomplishment in the context of the well intervention, particularly as this was achieved following successful fishing operations, including the running in hole of a free point tool, enabling the tubing to be cut and jarred. Once this was carried out, Zenith's operational team ran in the production tubing to a depth of 3574 metres, set the wellhead and fully completed the rigging down process of the ZJ30 truck-mounted workover rig on December 18, 2017. The Z-28 wellsite is now clear and preparations have been completed to run a coiled tubing unit ("CTU") to TD from the top of the slotted liner.

 

In the post-workover inspection of the wellhead, Zenith's petroleum engineers observed a leak during a pressure test from the wellhead in the 9 5/8 inches casing seal assembly.

 

To resolve this problem, the Company has contracted a UK-based, worldwide leader in oilfield leak-sealing technology, with an established presence in Azerbaijan. Zenith has been informed that various resin compounds will be required to successfully seal the wellhead following an engineering study currently underway by the aforementioned company. Zenith expects the estimated completion time of this study to be delayed by the upcoming holiday season in the United Kingdom and Azerbaijan, and to have fully completed the workover of well Z-28 by the end of January 2018.

 

The Company's operational team is highly committed to completing the Z-28 high-impact workover successfully and without incident. The risk of compromising the integrity of the wellhead by running the CTU to TD, specifically with the leaks from the casing on the wellhead observed, has been determined to be an imprudent risk that may have endangered the success of the Z-28 workover and resulted in a blowout.

 

The Company will provide an update when the wellhead leaks are fully sealed and the CTU has subsequently been mobilised and run in the hole.

 

High-impact workover of well Z-21

 

The Company confirms that civil works on the roads to well Z-21 and at the well location have been fully completed.

 

The average wellhead pressure recorded has increased from 3675 psi, announced by the Company on November 20, 2017, to a current average shut-in tubing and shut-in annulus pressure reading of 4115 psi.

 

Zenith's operational team is currently mobilising a workover rig to the wellsite to begin the high-impact workover of well Z-21 without delay.

 

The Company will provide an update when the workover of well Z-21 begins following the mobilisation of all necessary equipment.

 

 

Mike Palmer, Chief Operating Officer, Zenith Aran, the Company's Azerbaijan-based fully owned subsidiary, commented:

 

"I know that operations at Z-28 may appear to have taken a long time. However, from the outset there was relatively little in terms of data on this well, and we have progressively established that what data we had was incorrect. From all the work we have done we now understand this well, specifically the downhole configuration, characteristics and behaviour. Indeed, from what our team has seen in well Z-21 it is clear that there is a very strong prospective pressure in the formation that these wells produce from. We are convinced that there is a big prize to be had once we finish. We have been good stewards with the money invested in the operations so far and have accomplished a great deal in overcoming a number of difficult challenges thrown at us at significant depths. If it wasn't for the wellhead leaks we would actually be in a very good position to complete operations at Z-28, right above the liner with tubing, ready to drill out with a coiled tubing.

It is unfortunate that the seals for the 9 5/8 casing are not holding, causing leaks that must be fixed before we can run a CTU to total depth. We are in contact with one of the top companies in the world specialised in this. Even though the holidays are upon us, we will be working with them to come up with a design that will fix this problem early in January. We are working tirelessly to make sure we come to a positive conclusion as soon as possible, and achieve the great production result that we all believe can be achieved from well Z-28.

 

I am also pleased that, whilst we wait for the seals to be completed at well Z-28, we will soon be in a position to begin the workover of well Z-21.

 

The entire operational team is fully dedicated to achieving the best results possible in a field where we know there are extremely significant quantities of oil to be produced, but where there are also a number of unforeseen challenges presented by old, deep wells with inaccurate well data and old infrastructure that needs repairing."

 

 

For further information please contact:

Zenith Energy Ltd.

Andrea Cattaneo

Chief Executive Officer 

Email: info@zenithenergy.ca

Tel: +1 (587) 315 9031

 

Optiva Securities - (Joint Broker)

Christian Dennis

Tel: + 44 (0) 203 137 1903

 

Beaufort Securities Limited - (Joint Broker) 

Jon Belliss

Tel: +44 207 382 8300 

 

Allenby Capital Limited (Financial Adviser)

Nick Harriss

Nick Athanas

Tel:   + 44 (0) 203 328 5656

 

Yellow Jersey (Financial PR/IR)

Tim Thompson

Tel: +44 (0) 203 735 8825

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLOKCDDOBDKQBD
Date   Source Headline
16th Nov 20177:00 amRNSFiling of 2017 Second Quarter Results
8th Nov 20177:00 amRNSExercise of Warrants
2nd Nov 20177:00 amRNSExercise of Warrants
1st Nov 20177:00 amRNSSigning of Commitment Letter for new drilling rig
23rd Oct 20177:00 amRNSExercise of Warrants
20th Oct 20177:00 amRNSZardab Field Operational Update
19th Oct 20177:00 amRNSExercise of Warrants and Appointment of Broker
16th Oct 20172:00 pmRNSDirector/PDMR Shareholding
16th Oct 20177:00 amRNSProduction increased from well C-21 in Azerbaijan
12th Oct 20177:00 amRNSExercise of Warrants
10th Oct 20177:00 amRNSNew perforations increase production from well C21
6th Oct 20177:00 amRNSSuccessful perforation of well C-21 in Azerbaijan
28th Sep 20177:00 amRNSIssue of CEO salary sacrifice shares
27th Sep 20177:00 amRNSInvestor Conference Call
27th Sep 20177:00 amRNSCEO Exercises Stock Options
19th Sep 201711:39 amRNSInvestor Conference Call and New Company Website
11th Sep 20177:00 amRNSZenith issues equity to fund workover rig purchase
7th Sep 20177:00 amRNSSuccessful perforation of well C-26 in Azerbaijan
6th Sep 20177:00 amRNSAzerbaijan Field Rehabilitation Operational Update
30th Aug 20177:00 amRNSDirector/PDMR Shareholding
22nd Aug 201711:43 amRNSDirector/PDMR Shareholding
22nd Aug 20177:00 amRNSZenith completes ESP installation at well M-45
21st Aug 20177:00 amRNSZenith purchases Chinese oilfield equipment
15th Aug 20177:00 amRNSFiling of 2017 First Quarter Results
11th Aug 20177:00 amRNSProduction increased at well M-66 in Azerbaijan
2nd Aug 201711:28 amRNSIssue of Equity
2nd Aug 20177:00 amRNSIssue of Equity
27th Jul 20177:00 amRNSProduction restored at well M-66 in Azerbaijan
24th Jul 20177:00 amRNSAppointment of Non-Executive Director
14th Jul 20177:00 amRNSZenith Issues Equity to Fund Field Development
7th Jul 201712:35 pmRNSDirector/PDMR Shareholding
7th Jul 201711:00 amRNSDirector/PDMR Shareholding
6th Jul 20172:39 pmRNSDirector/PDMR Shareholding
5th Jul 20173:36 pmRNSDirector/PDMR Shareholding
3rd Jul 20177:00 amRNSTeam B strikes success at well M-45
30th Jun 20176:18 pmRNSReserve Update and Exercise of Warrants
28th Jun 20175:03 pmRNSZenith Announces 2017 Annual Consolidated Results
23rd Jun 20177:00 amRNSOperational Update on Wells M-195 and M-45
8th Jun 20177:00 amRNSWorkover rig operated by Team B moves to well M-45
5th Jun 20177:40 amRNSSuccess of sidetrack at well M-195 in Azerbaijan
25th May 20177:00 amRNSIssue of Equity
18th May 20177:00 amRNSAppointment of COO and Grant of Stock Options
11th May 201712:19 pmRNSDirector/PDMR Shareholding
2nd May 20177:00 amRNSTotal Voting Rights
21st Apr 20177:00 amRNSAppointment of new CFO
18th Apr 201712:43 pmRNSDirector/PDMR Shareholding
18th Apr 20177:00 amRNSTeam A Commences Workover Operations
18th Apr 20177:00 amRNSTeam B Commences Sidetrack Operations at M-195
13th Apr 20173:45 pmRNSHolding(s) in Company
12th Apr 20177:00 amRNSOption Agreement and Update on CEO Salary Proposal

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.