Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Team A Commences Workover Operations

18 Apr 2017 07:00

RNS Number : 5453C
Zenith Energy Ltd
18 April 2017
 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

 

Team A Commences Workover Operations

 

 

Calgary, Alberta, April 18, 2017, Zenith Energy Ltd. ("Zenith" or the "Company") (LSE: ZEN; TSX.V: ZEE), the dual listed international oil & gas production company, is pleased to announce that field workover Team A, comprised of the Company's field personnel and operating Zenith's workover rig, will be involved in workover operations at three wells across the Muradkhanli, Jafarli and Zardab fields.

 

After completing successful pump replacements at four wells, Team A will now engage in technically more demanding workovers with the objective of incrementally adding to total production through the systematic rehabilitation of the multiple underperforming wells within these three fields.

 

The first assignment will be the recompletion of well M-45 in the Muradkhanli field. The team will retrieve approximately 1,400 meters of production tubing and then proceed to remove an additional 162 meters of tubing using fishing tools. The workover programme includes re-perforating the casing at the producing level and possibly perform an acid stimulation and/or hydraulic fracturing of the Cretaceous reservoir to improve the well's productivity. Well M-45 was drilled in 1980 and placed on production in July 1981 at rates varying between 74 and 86 barrels per day. The well has produced approximately 352,700 barrels of oil from 1981 to 2017 and was producing at an average rate of 14 barrels per day from 2014 to 2017. Production has decreased to approximately 1.5 barrels per day in early 2017 due to the aforementioned tubing problems which Team A will rectify.

 

The second assignment will be in the Jafarli field where well J-2 requires removal of 773 meters of stuck production tubing and fishing of metal debris at the bottom of the hole. J-2 was drilled in 1984 and placed on production in late 1985. It has produced approximately 111,000 barrels from a younger reservoir of Eocene age.

The third assignment will be in the Zardab field where the Z-28 well requires removal and inspection of all production tubing. Worn sections of tubing will be replaced as necessary with the objective of returning the well to production.

 

The workover of M-45 by Team A is scheduled to begin tomorrow, 19 April, 2017, following the completion of all the preparatory work being undertaken at the well site such as the installation of the workover rig platform.

 

The Company will provide an update when the workover of M-45 has been completed.

 

 

 

Zaur Hajizade, Deputy General Director of Zenith Aran, commented:

 

"I am pleased that Zenith's internal field rehabilitation team operating the Company's own workover rig is now moving to more challenging and potentially high-impact operations. There are a number of wells in the three fields which will in turn require workovers as part of our systematic field rehabilitation plan. As the field rehabilitation programme progresses we are looking forward to reporting increased production which will contribute to achieving Zenith's production objectives and generate additional revenue at marginal operational outlays."

 

 

 

For further information, please contact:

 

Zenith Energy Ltd.

 

José Ramón López-Portillo

Chairman of the Board

 

Andrea Cattaneo

CEO & President

 

E-mail: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775 4474

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSFEEDWFWSESL
Date   Source Headline
8th Nov 20177:00 amRNSExercise of Warrants
2nd Nov 20177:00 amRNSExercise of Warrants
1st Nov 20177:00 amRNSSigning of Commitment Letter for new drilling rig
23rd Oct 20177:00 amRNSExercise of Warrants
20th Oct 20177:00 amRNSZardab Field Operational Update
19th Oct 20177:00 amRNSExercise of Warrants and Appointment of Broker
16th Oct 20172:00 pmRNSDirector/PDMR Shareholding
16th Oct 20177:00 amRNSProduction increased from well C-21 in Azerbaijan
12th Oct 20177:00 amRNSExercise of Warrants
10th Oct 20177:00 amRNSNew perforations increase production from well C21
6th Oct 20177:00 amRNSSuccessful perforation of well C-21 in Azerbaijan
28th Sep 20177:00 amRNSIssue of CEO salary sacrifice shares
27th Sep 20177:00 amRNSInvestor Conference Call
27th Sep 20177:00 amRNSCEO Exercises Stock Options
19th Sep 201711:39 amRNSInvestor Conference Call and New Company Website
11th Sep 20177:00 amRNSZenith issues equity to fund workover rig purchase
7th Sep 20177:00 amRNSSuccessful perforation of well C-26 in Azerbaijan
6th Sep 20177:00 amRNSAzerbaijan Field Rehabilitation Operational Update
30th Aug 20177:00 amRNSDirector/PDMR Shareholding
22nd Aug 201711:43 amRNSDirector/PDMR Shareholding
22nd Aug 20177:00 amRNSZenith completes ESP installation at well M-45
21st Aug 20177:00 amRNSZenith purchases Chinese oilfield equipment
15th Aug 20177:00 amRNSFiling of 2017 First Quarter Results
11th Aug 20177:00 amRNSProduction increased at well M-66 in Azerbaijan
2nd Aug 201711:28 amRNSIssue of Equity
2nd Aug 20177:00 amRNSIssue of Equity
27th Jul 20177:00 amRNSProduction restored at well M-66 in Azerbaijan
24th Jul 20177:00 amRNSAppointment of Non-Executive Director
14th Jul 20177:00 amRNSZenith Issues Equity to Fund Field Development
7th Jul 201712:35 pmRNSDirector/PDMR Shareholding
7th Jul 201711:00 amRNSDirector/PDMR Shareholding
6th Jul 20172:39 pmRNSDirector/PDMR Shareholding
5th Jul 20173:36 pmRNSDirector/PDMR Shareholding
3rd Jul 20177:00 amRNSTeam B strikes success at well M-45
30th Jun 20176:18 pmRNSReserve Update and Exercise of Warrants
28th Jun 20175:03 pmRNSZenith Announces 2017 Annual Consolidated Results
23rd Jun 20177:00 amRNSOperational Update on Wells M-195 and M-45
8th Jun 20177:00 amRNSWorkover rig operated by Team B moves to well M-45
5th Jun 20177:40 amRNSSuccess of sidetrack at well M-195 in Azerbaijan
25th May 20177:00 amRNSIssue of Equity
18th May 20177:00 amRNSAppointment of COO and Grant of Stock Options
11th May 201712:19 pmRNSDirector/PDMR Shareholding
2nd May 20177:00 amRNSTotal Voting Rights
21st Apr 20177:00 amRNSAppointment of new CFO
18th Apr 201712:43 pmRNSDirector/PDMR Shareholding
18th Apr 20177:00 amRNSTeam A Commences Workover Operations
18th Apr 20177:00 amRNSTeam B Commences Sidetrack Operations at M-195
13th Apr 20173:45 pmRNSHolding(s) in Company
12th Apr 20177:00 amRNSOption Agreement and Update on CEO Salary Proposal
10th Apr 20177:40 amRNSTeam A Operational Update, Azerbaijan

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.