Adam Davidson, CEO of Trident Royalties, discusses offtake milestones and catalysts to boost FY24. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production increased at well M-66 in Azerbaijan

11 Aug 2017 07:00

RNS Number : 7235N
Zenith Energy Ltd
11 August 2017
 

August 11, 2017 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Production increased at well M-66 in Azerbaijan

 

Zenith Energy Ltd. ("Zenith" or the "Company") (LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to announce that production at well M-66 in the Muradkhanli field has been increased to 50 BOPD.

 

The Company announced on July 27, 2017 that Well M-66 had been returned to production after being cleaned out to a depth of 3011 metres with a coiled tubing unit (CTU) using nitrogen. A production of 15 BOPD was achieved and 150 barrels of oil, which had accumulated in the wellbore, were also recovered during the well intervention. Well M-66 had been shut-in since 1999.

 

After conducting post-workover analysis, it was noticed that the clean out exposed a pay zone that had not been perforated. As a result, an additional 6 metres of pay were perforated between the depth of 2970 and 2986 metres, specifically between 2970-2972, 2977.5-2979.5 and, finally, 2984-2986 metres. After these perforations were completed, a coiled tubing unit (CTU) using nitrogen was again employed to stimulate the well. Following this secondary well intervention, M-66 is now flowing at a rate of 50 BOPD.

 

Zenith is systematically reviewing each well across its 642.4 km2 contract area to achieve an increase in production. The use of a CTU has enabled the Company to expose productive zones that have not produced for many years. Zenith's operational team is reviewing many Soviet era logs, which form the majority of the Company's well data, and is comparatively analysing this material with cased hole logging data collected in new well interventions. This is the most economical and effective way of identifying new, untouched areas of the wellbore reservoir.

 

The Company has identified an additional 5 wells that hold high potential for production maximisation.

 

Well M-45 Update

 

Zenith is also pleased to confirm that the new Schlumberger electrical submersible pump (ESP) has cleared customs and is currently being transported to well M-45. The Company will release an announcement when the installation is completed and flow rates have been determined following installation.

 

Well M-195 Update

 

The Company is awaiting delivery of the ESP from Schlumberger, which is custom-built according to the specifications of well M-195. Delivery is expected in September.

 

Zenith Chief Executive Officer, Andrea Cattaneo, commented:

 

"I am pleased with this result. It is clear that Zenith is gradually reaping the rewards of its increased investment in equipment and the strengthening of its operational team. Our targeted and carefully considered investments in machinery and personnel will ensure a progressive increase in our field production without the dangers presented by imprudent expenditure.

 

There are many wells across our field that hold potential for similar success as that achieved at M-66. I look forward to reporting on the stabilised flow rates following the completion of the Schlumberger ESP installation at well M-45. It should also be underlined that the ESP installed at M-45 will be significantly more advanced than any other ESP we have in the field. Indeed, if we are satisfied with the benefits of this new pump, we shall look to install similar Schlumberger pumps at a number of other wells. The Company's operational team is confident that the new ESP, custom-built to the specifications of well M-45, will increase Zenith's production."

 

 

 

For further information, please contact:

Zenith Energy Ltd.

José Ramón López-Portillo

Chairman

 

Andrea Cattaneo

CEO & President

Email: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775 4474

 

Allenby Capital Limited (Joint Broker)

Nick Harriss

Nick Athanas

Richard Short

Telephone:   + 44 (0) 203 328 5656

 

Optiva Securities - (Joint Broker)

Christian Dennis 

Telephone: + 44 (0) 203 137 1903

 

  

Abchurch (Financial PR/IR)

 

Tim Thompson

 

Telephone: +44 (0) 200 7398 7700

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFLVTVIILID
Date   Source Headline
16th Nov 20177:00 amRNSFiling of 2017 Second Quarter Results
8th Nov 20177:00 amRNSExercise of Warrants
2nd Nov 20177:00 amRNSExercise of Warrants
1st Nov 20177:00 amRNSSigning of Commitment Letter for new drilling rig
23rd Oct 20177:00 amRNSExercise of Warrants
20th Oct 20177:00 amRNSZardab Field Operational Update
19th Oct 20177:00 amRNSExercise of Warrants and Appointment of Broker
16th Oct 20172:00 pmRNSDirector/PDMR Shareholding
16th Oct 20177:00 amRNSProduction increased from well C-21 in Azerbaijan
12th Oct 20177:00 amRNSExercise of Warrants
10th Oct 20177:00 amRNSNew perforations increase production from well C21
6th Oct 20177:00 amRNSSuccessful perforation of well C-21 in Azerbaijan
28th Sep 20177:00 amRNSIssue of CEO salary sacrifice shares
27th Sep 20177:00 amRNSInvestor Conference Call
27th Sep 20177:00 amRNSCEO Exercises Stock Options
19th Sep 201711:39 amRNSInvestor Conference Call and New Company Website
11th Sep 20177:00 amRNSZenith issues equity to fund workover rig purchase
7th Sep 20177:00 amRNSSuccessful perforation of well C-26 in Azerbaijan
6th Sep 20177:00 amRNSAzerbaijan Field Rehabilitation Operational Update
30th Aug 20177:00 amRNSDirector/PDMR Shareholding
22nd Aug 201711:43 amRNSDirector/PDMR Shareholding
22nd Aug 20177:00 amRNSZenith completes ESP installation at well M-45
21st Aug 20177:00 amRNSZenith purchases Chinese oilfield equipment
15th Aug 20177:00 amRNSFiling of 2017 First Quarter Results
11th Aug 20177:00 amRNSProduction increased at well M-66 in Azerbaijan
2nd Aug 201711:28 amRNSIssue of Equity
2nd Aug 20177:00 amRNSIssue of Equity
27th Jul 20177:00 amRNSProduction restored at well M-66 in Azerbaijan
24th Jul 20177:00 amRNSAppointment of Non-Executive Director
14th Jul 20177:00 amRNSZenith Issues Equity to Fund Field Development
7th Jul 201712:35 pmRNSDirector/PDMR Shareholding
7th Jul 201711:00 amRNSDirector/PDMR Shareholding
6th Jul 20172:39 pmRNSDirector/PDMR Shareholding
5th Jul 20173:36 pmRNSDirector/PDMR Shareholding
3rd Jul 20177:00 amRNSTeam B strikes success at well M-45
30th Jun 20176:18 pmRNSReserve Update and Exercise of Warrants
28th Jun 20175:03 pmRNSZenith Announces 2017 Annual Consolidated Results
23rd Jun 20177:00 amRNSOperational Update on Wells M-195 and M-45
8th Jun 20177:00 amRNSWorkover rig operated by Team B moves to well M-45
5th Jun 20177:40 amRNSSuccess of sidetrack at well M-195 in Azerbaijan
25th May 20177:00 amRNSIssue of Equity
18th May 20177:00 amRNSAppointment of COO and Grant of Stock Options
11th May 201712:19 pmRNSDirector/PDMR Shareholding
2nd May 20177:00 amRNSTotal Voting Rights
21st Apr 20177:00 amRNSAppointment of new CFO
18th Apr 201712:43 pmRNSDirector/PDMR Shareholding
18th Apr 20177:00 amRNSTeam A Commences Workover Operations
18th Apr 20177:00 amRNSTeam B Commences Sidetrack Operations at M-195
13th Apr 20173:45 pmRNSHolding(s) in Company
12th Apr 20177:00 amRNSOption Agreement and Update on CEO Salary Proposal

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.