Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWoodbois Regulatory News (WBI)

  • This share is currently suspended. It was suspended at a price of 0.03
  • There is currently no data for WBI

Interim Management Statement

9 Sep 2008 07:00

RNS Number : 9811C
Obtala Resources PLC
09 September 2008
 



9th September 2008

OBTALA RESOURCES PLC ("Obtala" or the "Company")

Trading Update

The Board of Obtala Resources, the AIM quoted mineral exploration and development company is pleased to provide the market with an operations and management update. 

Since listing on the 24th April 2008 a number of advancements have been made in Tanzania with respect to land holdings and operationally progressing our focus in becoming a multi-commodity junior exploration company.

Highlights:

The acquisition of six 1km2 new gemstone (emerald and alexandrite) mining licences in  Manyara area of Tanzania. (Press Release 29th May 2008).

Significant increase in landholding for gold exploration from 307.46km2 to 2076.74km2 with the acquisition of three new licences. (Press Release 25th July).  

New gemstone (ruby) licence at Matombo, in Morogoro District of Tanzania. (Press Release 31st July 2008).

Office in Mwanza and field teams established and operational in the Lake Victoria Goldfield (LVG) area.

1st phase soil sampling at the Nzega, Mwadui (Shinyanga), Buckreef and Buloli B gold licence areas completed.

6,440 samples (soil/stream/rock-chip) collected from all active licences.

Two geochemical anomalies identified at Mwadui (Shinyanga).

Previously unknown artisanal working identified within the Bukoli B gold licence area.

1st phase soil sampling completed at the Rulenge nickel prospect.

Ground magnetic contract for Rulenge awarded and work in progress

Obtala has now established an office and accommodation facility in Mzwanza in the Lake Victoria Goldfields District, recruited field staff, purchased three field service vehicles and operational field equipment. In the period since listing on the 24th April 2008 the focus of in-country operations has been on the gold licences to the south of Lake Victoria and the Rulenge nickel licence within the Kagera District..

Gold Licences

First phase soil sampling is being conducted in-house by Obtala. The company has recruited three Tanzania national geologists with three supporting experienced field assistants. Sampling has been completed on the Nzega, Shinyanga (Mwadui), Buckreef and Bukoli B licence areas, and is ongoing on the Bukoli A licence.

Project

Work Status

Soil

Stream

Rock

Total

Nzega

Complete

285

32

10

327

Shinyanga

Complete

645

15

13

673

Shinyanga follow-up

Complete

756

0

7

763

Buckreef

Complete

436

0

0

436

Bukoli North (A)

Ongoing

208

0

0

208

Bukoli South (B)

Ongoing* 

837

0

0

837

Sub-Total

 

3,167

47

30

3,244

*Detailed sampling over artisanal workings in progress

Sample interval spacing varies from 500m X 200m (section line spacing x interval along section line) to 500m X 50m grids, depending on the expected local style of mineralisationAt Shinyanga the sample interval was reduced to 100m x 50m during the follow-up phase over the two geochemical anomalies, one of which reported a high of 0.63g/t gold in soils. 

Results from the first phase have been received for the Nzega licence and reveal an anomaly in the form of a cluster of geochemical 'gold in soil' values up to 4ppb in the northeast of the licence. While prospecting on the Bukoli B licence abandoned artisanal workings were discovered indicating the presence of a mineralised structure within the south part of the licence. Sample results are pending for the Buckreef and Bukoli B licences. 

All samples are being submitted to ALS Chemex laboratories in Mwanza. To date 3,146 samples have been dispatched to the laboratory.

Nickel Licence

Obtala engaged the services of GFT Ltd, an experienced Tanzania registered geological consultancy, on the 1st June to undertake the preliminary phase of soil sampling and geological field mapping on the Rulenge nickel licence. This is now complete with in excess of 3,000 samples collected.  

The Rulenge licence is located 15km northwest of the Xstrata-Barrick Kabanga Nickel Deposit, in what is believed to be the stratigraphic equivalents of the Kabanga host lithologies within the metasediments of the Karagwe-Ankolean System, part of the Kibaran Orogenic Belt.

Project

Work Status

Soil

Stream

Rock

Total

Rulenge

Ongoing

3,068

38

90

3,196

GFT has retained the services of geologists with previous field experience from working on the Kabanga exploration project. This has aided in the mapping process and compilation of the local geological stratigraphy. During the course of field mapping GFT has recognized a significant number of massive sulphide and semi-massive sulphide gossans in outcrop that GFT confidently interpret as occurring within the stratigraphic equivalents to the Kabanga deposit host lithologies. Within the Rulenge licence area the lithologies are folded with gossan outcrop being observed on both limbs of a northeast trending anticline structure.

Soil samples have been collected from a 200 X 100m grid. Over the areas with gossan outcrop a more detailed grid of 100m x 50m has been planned with sampling currently in progress. Stream sediment and rock-chip samples are being collected to supplement the soil sample programme. All sampling from this phase of work is expected to be completed by the end of September.

All samples from the soil sampling programme are being submitted to ALS Chemex in Mwanza. To date 2,658 samples have been dispatched to the laboratory.

contract to undertake a ground magnetic survey was award and signed with GFT on the 14th August. The geophysical field team has mobilised to site and work is in progress. The field data is being collected from a 200 x 50m grids over the entire licence area with this reduced down to 50m x 10m over the areas hosting the gossan outcrop. Once complete the magnetic data will be used in conjunction with the geochemical data to define anomalies for further detailed sampling and additional follow-up geophysics, prior to establishing drill targets. 

Uranium Licences

Desk-top planning and target generation for the Mkuju East licence has been completed and a field crew mobilized to the site. Initial reconnaissance trips were made in August by GFT who will undertake the field work on the property. GFT expect to establish a field camp on the licence and begin work in early September on 5 initial targetsField work will consist of ground traversing using hand-held scintollometers, over areas underlain by sediments of the Karoo Supergroup, with a view to identifying multiple stacked roll front occurrences.

Management Changes

Additions have been made to strengthen the technical experience of the Board of Directors with the Appointments of Professor John Monhemius and Mr. Nicholas Clarke as Non-Executive Directors. Jim Bain stepped down from his position as Non-Executive Director.

Frank Scolaro, Chairman of Obtala, commented that "Our company through the skillset and expertise of the Board and management is now ideally positioned to drive forward a co-ordinated, cost effective exploration programme of activities in Tanzania. Attention to detail throughout our licences, and strong local management allow Obtala to achieve and exceed my initial expectations. 

I am delighted with the progress and commitment that the local Tanzanian geologists and management have delivered, and am confident that the results of their strong and decisive work will deliver realisable value in the future to out shareholders. I am particularly pleased with the developments on the Rulenge nickel licence where the preliminary field observations are very encouraging and we are confident that we will meet with success on the project." 

Contact:

Frank Scolaro - Chairman

www.obtalaresources.co.uk

+44 (0) 20 7099 1940

Obtala Resources plc

 

Ray Zimmerman/Jonathan Evans 

+44 (0) 20 7060 1760

Zimmerman Adams International Ltd -

Nominated Adviser and Broker

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSUUUWABUPRGAR
Date   Source Headline
26th Mar 201310:28 amRNSHolding(s) in Company
25th Mar 20137:00 amRNSDirectorate Change
21st Mar 201311:49 amRNSStatement regarding share price movement
19th Mar 20139:54 amRNSDirector/PDMR Shareholding
6th Mar 20131:17 pmRNSNotice of EGM
20th Feb 20139:28 amRNSIssue of Equity
12th Feb 201311:59 amRNSHolding(s) in Company
7th Feb 201310:54 amRNSBushveld Operational Update
7th Feb 20137:00 amRNSMontara Operational Update
28th Jan 201310:40 amRNSBushveld P-Q Zone Metallurgical Testwork Results
24th Jan 201310:16 amRNSPotential Phosphate Resource at Iron Ore Project
13th Dec 20129:55 amRNSBushveld Tin Project Update
10th Dec 20127:00 amRNSOperational Update
5th Dec 201210:17 amRNSBushveld P-Q Zone Resource Update
4th Dec 20123:59 pmRNSHolding(s) in Company
3rd Dec 20121:55 pmRNSHolding(s) in Company
28th Nov 20127:00 amRNSEquity line of credit agreement
21st Nov 201210:46 amRNSAgriculture Land Authorisation
22nd Oct 20127:07 amRNSOperational Update
27th Sep 20127:00 amRNSHalf Yearly Report
24th Sep 201211:27 amRNSDirectorate Change
4th Sep 201210:22 amRNSParagon Diamonds operational update
28th Aug 20127:00 amRNSParagon Diamonds signs MOU
14th Aug 20128:57 amRNSForest Concessions Applications Authorised
10th Aug 201210:43 amRNSResult of AGM
27th Jul 20127:00 amRNSOperational Update
25th Jul 20127:00 amRNSOperational Update
16th Jul 20127:00 amRNSDirector Dealing
27th Jun 20127:00 amRNSAnnual Financial Report
14th Jun 20127:00 amRNSPortfolio Update
8th Jun 201210:49 amRNSHolding(s) in Company
14th May 20127:00 amRNSMaiden Crop Harvesting Underway on Montara
10th May 201210:17 amRNSAdditional Timber Sales Contract Concluded
10th May 20128:51 amRNSDirectorate Change
1st May 201211:31 amRNSReplacement - Notification of Major Interest
1st May 201210:59 amRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
5th Apr 20127:00 amRNSInvestment in Argentina
30th Mar 20124:30 pmRNSTotal Voting Rights
26th Mar 20129:25 amRNSCompany Update
26th Mar 20128:02 amRNSBushveld Minerals Limited first day of trading
9th Mar 20127:00 amRNSListing of Bushveld and Greenhills on AIM
24th Feb 20123:37 pmRNSHolding(s) in Company
6th Feb 20128:51 amRNSMontara Mozambique Operational Update
12th Jan 201212:55 pmRNSCrop Planting Commences on Montara Agriculture JV
2nd Dec 20117:00 amRNSJoint Venture Agreement Concluded with STAMICO
1st Dec 20117:56 amRNSDisposal of Argentine Subsidiary
25th Nov 201112:34 pmRNSResource Estimate on Mokopane Iron Ore Project
15th Nov 20117:00 amRNSJoint Venture Agreement Signed
21st Oct 20117:00 amRNSEIA Certificate granted
19th Oct 20117:00 amRNSFurther subscription by Employee Share Trust

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.