Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVGAS.L Regulatory News (VGAS)

  • There is currently no data for VGAS

Operational update

30 Nov 2011 07:46

RNS Number : 0349T
Volga Gas PLC
30 November 2011
 



30 November 2011

VOLGA GAS PLC

 

Operational update

 

Volga Gas plc ("Volga Gas" or the "Company"), the oil and gas exploration and production group operating in the Volga Region of Russia, announces the following update on its exploration and development operations.

 

Urozhainoye-2 licence area

 

The Yu. Romanovskaya #1 exploration well reached its initial target at a depth of 2,885 metres where the Bo layer was found to be thinner than prognosed and without hydrocarbons. Having completed logging operations, drilling is to continue to the primary target horizon at a depth of 3,800 metres. The rig used to drill the top section of the well will remain on location to drill the deeper section, in an operation that is expected to take about three months.

 

Uzenskoye oil field

 

Drilling is expected to commence shortly on the first of two sidetracks to existing wells on the Uzenskoye oil field in the Company's Karpenskiy Licence Area. The two wells are Uz #9 and Uz #4. Both wells are located at the edge of the field and are currently non-producing. The wells were previously planned to be converted into water injectors but recent studies showed that there is no need to have any water injection in the near future due to the presence of an active aquifer.

 

The planned bottom hole locations for the sidetracks are updip and infield from the current locations. It is expected that overall field production will increase substantially following the completion of these operations.

 

The Uzenskoye oil field is currently producing at a rate of approximately 1,200 bopd from four wells.

 

Dobrinskoye gas/condensate field

 

Drilling of a sidetrack to the existing well #22 on the Dobrinskoye field is expected to commence early in 2012 as planned. This well, which had been producing in 2010, has suffered water encroachment and has been shut in since June 2011. The well is to be sidetracked into the main reservoir and completed for production. On completion, Well #22 is expected to contribute a substantial proportion of future field production.

 

The Dobrinskoye field is currently producing from a single well, Well #26 and is currently producing at a rate of 6.0 mmcf/d gas  plus 448 bpd of condensate.

 

Vostochny Makarovskoye gas/condensate field

 

Preliminary trials of a proposed sulphur processing system on gas from the Vostochny Makarovskoye ("VM") gas/condensate field have been conducted at the Dobrinskoye gas plant with successful results. The Company has commenced a programme to upgrade the gas plant to provide additional capacity and sulphur treatment. It is expected that the upgrade will be completed during Q3 2012 and production from the VM field will commence shortly thereafter.

 

There are two existing production wells on the field: VM#1 and VM#2, both of which have been completed for production from the Evlansko-Livenskiy reservoir and connected to the plant. In addition, the Company plans to undertake the workover of another well, #30, as a producing well from the Bobrikovskiy reservoir. Well #30, which was drilled before Volga Gas acquired the VM licence, achieved a flow rate of over 7.4 mmcf/d under flow test from the Bobrikovskiy reservoir. The plan is to place all three wells on production when the gas plant upgrade is completed. Further development drilling, including a sidetrack of the VM#4 well is planned for 2013 and beyond.

 

Pre-Caspian Licence Area

 

An exploration well, Mirnaya #2, is to commence drilling in the Pre-Caspian licence area in Q1 2012. As announced on 1 August 2011, the State Committee for Resources approved C3 resource estimates of 58 million barrels of oil equivalent on this prospect. The well is to be drilled to a target depth of 1,220 metres into a supra-salt target believed to be prospective primarily for oil.

 

Capital expenditure programme

 

The planned capital expenditure programme for the remainder of 2011 and for 2012, including all of the above activities, totals US$16.3 million, of which US$5.8 million is related to exploration and US$10.5 million to production and field development activities.

 

This capital programme is expected to be funded from cash generated from operations and the Group's existing cash resources.

Mikhail Ivanov, Chief Executive of Volga Gas commented:

"While we are disappointed not to have discovered oil in our secondary target with the YR#1 well, we are excited with the programme of development drilling that we are commencing and especially with the project to bring the VM field into production. Successful completion of this programme will enable Volga Gas to achieve substantially increased production in 2012, from the current total Group production of approximately 2,600 barrels of oil equivalent per day,

 and consequently increased cash generation."

 

 

For additional information please contact:

 

Volga Gas plc

Mikhail Ivanov, Chief Executive Officer

+7 (495) 721 1233

Tony Alves, Chief Financial Officer

+44 (0) 20 8622 4451

Oriel Securities Limited, Nominated Adviser and Broker

Michael Shaw

Gareth Price

+44 (0)20 7710 7600

FTI Consulting

Billy Clegg

+44 (0)20 7831 3113

Ed Westropp

Alex Beagley

 

 

Editors' notes:

Volga Gas is an independent oil and gas exploration and production company operating in the Volga region of European Russia. The Company has 100% interests in its four licence areas.

 

The information contained in this announcement has been reviewed and verified by Mr. Mikhail Ivanov, Director and Chief Executive Officer of Volga Gas plc, for the purposes of the Guidance Note for Mining, Oil and Gas companies issued by the London Stock Exchange in June 2009. Mr. Mikhail Ivanov holds a M.S. Degree in Geophysics from Novosibirsk State University. He also has an MBA degree from Kellogg School of Management (Northwestern University). He is a member of the Society of Petroleum Engineers.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCURSBRASAAORA
Date   Source Headline
10th Mar 20202:00 pmRNSPrice Monitoring Extension
3rd Mar 20207:00 amRNSPRODUCTION REPORT FOR FEBRUARY 2020
4th Feb 20207:00 amRNSPRODUCTION REPORT FOR JANUARY 2020
27th Jan 20207:00 amRNSPreliminary Results of Reservoir Study
6th Jan 20207:00 amRNSPRODUCTION REPORT FOR DECEMBER 2019
3rd Dec 20199:00 amRNSDirectorate Change
3rd Dec 20198:16 amRNSPRODUCTION REPORT FOR NOVEMBER 2019
4th Nov 20195:42 pmRNSHolding(s) in Company
4th Nov 20197:18 amRNSProduction Report for October 2019
2nd Oct 201911:47 amRNSPRODUCTION REPORT FOR SEPTEMBER 2019
30th Sep 201911:07 amRNSINTERIM RESULTS
3rd Sep 20192:06 pmRNSSecond Price Monitoring Extn
3rd Sep 20192:01 pmRNSPrice Monitoring Extension
2nd Sep 20193:56 pmRNSPRODUCTION REPORT FOR AUGUST 2019
5th Aug 201911:05 amRNSSecond Price Monitoring Extn
5th Aug 201911:00 amRNSPrice Monitoring Extension
5th Aug 20198:11 amRNSDRILLING UPDATE AND PRODUCTION REPORT FOR JULY
31st Jul 20197:00 amRNSTotal Voting Rights
17th Jul 20194:40 pmRNSSecond Price Monitoring Extn
17th Jul 20194:35 pmRNSPrice Monitoring Extension
17th Jul 20194:22 pmRNSOPERATIONAL UPDATE
4th Jul 20192:44 pmRNSPDMR Notification, Transaction in Own Shares & TVR
2nd Jul 20192:05 pmRNSSecond Price Monitoring Extn
2nd Jul 20192:00 pmRNSPrice Monitoring Extension
2nd Jul 20191:19 pmRNSDRILLING UPDATE AND PRODUCTION REPORT FOR JUNE 19
4th Jun 20197:00 amRNSDRILLING UPDATE AND PRODUCTION REPORT FOR MAY 2019
20th May 201911:20 amRNSResult of Annual General Meeting
20th May 20197:00 amRNSOPERATIONAL UPDATE
3rd May 20197:00 amRNSPRODUCTION REPORT FOR APRIL 2019
30th Apr 20197:00 amRNSTotal Voting Rights
24th Apr 20197:00 amRNSAvailability of Annual Report and Notice of AGM
23rd Apr 20193:36 pmRNSComment on share price movement
17th Apr 201911:33 amRNSTransaction in Own Shares
16th Apr 201910:03 amRNSChange in Substantial Shareholdings
11th Apr 20197:00 amRNSFinal Dividend Payment and Currency Election
8th Apr 20193:09 pmRNSREPLACEMENT RNS: Results for FY 31 December 2018
8th Apr 20197:00 amRNSResults for the year ended 31 December 2018
3rd Apr 20197:00 amRNSPRODUCTION REPORT FOR MARCH 19 AND DRILLING UPDATE
4th Mar 20197:00 amRNSDRILLING UPDATE AND PRODUCTION REPORT FOR FEB 19
18th Feb 20192:53 pmRNSProposed appointment of an alternate director
5th Feb 20197:00 amRNSPRODUCTION REPORT FOR JANUARY 2019
29th Jan 20197:00 amRNSPDMR Notification
29th Jan 20197:00 amRNSPDMR Notification
28th Jan 20197:00 amRNSHolding(s) in Company
8th Jan 20197:00 amRNSPRODUCTION REPORT FOR DECEMBER 2018
14th Dec 20182:29 pmRNSTransaction in Own Shares
4th Dec 20187:00 amRNSPRODUCTION REPORT FOR NOVEMBER 2018
6th Nov 20187:00 amRNSPRODUCTION REPORT FOR OCTOBER 2018
5th Oct 20187:00 amRNSPRODUCTION REPORT FOR SEPTEMBER 2018
1st Oct 201810:23 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.