The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0255
Bid: 0.024
Ask: 0.027
Change: 0.0015 (6.25%)
Spread: 0.003 (12.50%)
Open: 0.024
High: 0.0255
Low: 0.0225
Prev. Close: 0.024
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Successful Completion of HH-2 Coring Operations

15 Oct 2019 09:00

RNS Number : 8968P
UK Oil & Gas PLC
15 October 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill Oil Field - Successful Completion of HH-2 Coring Operations

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce the successful completion of an extensive conventional coring programme in its 85.635% owned Horse Hill-2 ("HH-2") Portland pilot well. Preliminary visual analysis of a total of 241.45 ft of core has clearly identified the Portland reservoir's most productive zone or "sweet spot", which will now be the target of the planned circa 1,000 m HH-2z horizontal trajectory, expected to commence next week.

 

Live oil was observed "bleeding" profusely from core throughout the sweet-spot, the Upper Portland reservoir's most porous, permeable and oil productive interval. Lesser degrees of oil bleed, together with oil shows and oil staining were also observed from porous sandstone intervals lying above and below the sweet-spot.

 

The core is now at a Surrey-based laboratory, where an extensive geological and petrophysical analysis programme is now underway. Results of analyses that directly impact the field's possible increased oil in place and recoverable oil volumes will be reported in due course.

 

Having also reached its planned depth of around 2320 ft below rig floor, the well is now being prepared for electric logging, following which it will be plugged back to the "kick-off" point delineating the start of the HH-2z horizontal section.

 

To ensure the borehole remains wholly within the sweet spot, HH-2z will be actively "geo-steered" during drilling to keep within a series of core and electric log-derived diagnostic geological markers delineating the zone's upper and lower boundaries. The successful delivery of such an optimally placed horizontal trajectory is designed to optimise flow rates and oil recoveries from the Portland reservoir.

 

UKOG holds a controlling 85.635% interest in the Horse Hill oil field and surrounding highly prospective PEDL137 and PEDL246 licences, which are operated by UKOG's subsidiary company, Horse Hill Developments Ltd.

 

About HH-2/2z:

 

HH-2/2z, the first of two new horizontal wells in the field's Portland oil pool, is designed to be retained as a future production well, capable of delivering flow rates significantly higher than the previously reported 362 barrels of oil per day from the HH-1 vertical Portland discovery well. Following a planned extensive HH-2z production flow-testing campaign, both HH-2z Portland and the HH-1 Kimmeridge well are expected to be put into long term production by the end of 2019.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The HH-2 coring programme has delivered its key short-term goal of defining the Portland reservoir's sweet-spot, the most porous and permeable vertical zone within the oil pool. We can now confidently proceed ahead to drill the HH-2 horizontal trajectory wholly within the most oil productive part of the Portland, the zone capable of delivering the significant flow rates we seek."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 36 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander Tel: 01483 900582

 

Glossary

 

 

coring

a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped sample of in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 30 feet lengths, or multiples of 30 feet, and with a diameter of 3-4.5 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of geological, geochemical petrophysical and geomechanical properties

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

oil in place

the quantity of oil or petroleum that is estimated to exist within the reservoir or accumulation i.e. oil in the ground

oil-water contact (OWC)

A bounding surface in an oil pool or reservoir above which predominantly oil occurs and below which predominantly water occurs. The OWC is a key determinant for the calculation of oil in place within a conventional hydrocarbon accumulation

well test

or flow test involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

67.5%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, HH-2/2z drilling

Horse Hill 5

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery, plus further undrilled Kimmeridge exploration prospects.

5. Portland and Kimmeridge Oil field with productive and commercially viable zones, EWT ongoing, production planning consent granted in September 2019, appraisal/development drilling campaign underway. Long term production start expected late 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDLIFVDIVLELIA
Date   Source Headline
9th Apr 20219:05 amRNSSecond Price Monitoring Extn
9th Apr 20219:00 amRNSPrice Monitoring Extension
8th Apr 202111:05 amRNSSecond Price Monitoring Extn
8th Apr 202111:00 amRNSPrice Monitoring Extension
8th Apr 20219:05 amRNSSecond Price Monitoring Extn
8th Apr 20219:00 amRNSPrice Monitoring Extension
7th Apr 20214:41 pmRNSSecond Price Monitoring Extn
7th Apr 20214:36 pmRNSPrice Monitoring Extension
7th Apr 20217:00 amRNSFormal drilling consent for Basur-3 granted
6th Apr 20212:06 pmRNSSecond Price Monitoring Extn
6th Apr 20212:01 pmRNSPrice Monitoring Extension
1st Apr 20214:41 pmRNSSecond Price Monitoring Extn
1st Apr 20214:36 pmRNSPrice Monitoring Extension
31st Mar 20214:41 pmRNSSecond Price Monitoring Extn
31st Mar 20214:36 pmRNSPrice Monitoring Extension
31st Mar 202111:06 amRNSSecond Price Monitoring Extn
31st Mar 202111:00 amRNSPrice Monitoring Extension
31st Mar 20217:06 amRNSExtension to publication of final results
23rd Mar 20217:00 amRNSBasur-3 drilling site construction commences
4th Mar 20217:00 amRNSLoxley appeal inquiry scheduled for July 2021
15th Feb 20212:00 pmRNSPrice Monitoring Extension
11th Feb 20211:31 pmRNSSecond Instalment Purchase of Horse Hill Equipment
10th Feb 20217:01 amRNSJudge upholds injunction against unlawful protest
10th Feb 20217:00 amRNSLoxley appeal submitted to Planning Inspectorate
4th Feb 202111:25 amRNSInterim injuction against unlawful protest update
20th Jan 20217:00 amRNSCompletion of Resan licence agreement with AME
15th Jan 202110:00 amRNSHorse Hill oil field update
15th Jan 20218:44 amRNSAmended - Formal Government Consent - Resan
15th Jan 20217:00 amRNSGovernment consent - Resan licence acquisition
22nd Dec 20207:00 amRNSHorse Hill judicial review challenge dismissed
17th Dec 20207:00 amRNSAppeal against Loxley planning decision
10th Dec 20207:00 amRNSApplication for 3 new Turkish licences
4th Dec 20203:48 pmRNSExercise of Warrants
27th Nov 20204:41 pmRNSSecond Price Monitoring Extn
27th Nov 20204:36 pmRNSPrice Monitoring Extension
27th Nov 20203:42 pmRNSLoxley Gas Project Planning Consent Refused
25th Nov 202011:05 amRNSSecond Price Monitoring Extn
25th Nov 202011:00 amRNSPrice Monitoring Extension
20th Nov 20207:00 amRNSUpdate: Horse Hill Judicial Review
13th Nov 202012:35 pmRNSHorse Hill Judicial Review
5th Nov 20202:28 pmRNSHorse Hill oil field update
16th Oct 20207:00 amRNSDate for Loxley planning consent redetermination
14th Oct 20207:00 amRNSTurkey Resan licence update
2nd Oct 20202:06 pmRNSSecond Price Monitoring Extn
2nd Oct 20202:00 pmRNSPrice Monitoring Extension
2nd Oct 202011:43 amRNS£2.2m placing funding initial Turkey operations
1st Oct 202012:00 pmRNSHorse Hill-1 Portland intervention commences
21st Sep 20204:40 pmRNSSecond Price Monitoring Extn
21st Sep 20204:35 pmRNSPrice Monitoring Extension
21st Sep 20202:06 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.