PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0275
Bid: 0.026
Ask: 0.029
Change: -0.0045 (-14.29%)
Spread: 0.003 (11.538%)
Open: 0.0315
High: 0.0275
Low: 0.027
Prev. Close: 0.0315
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

OGA Approval of PEDL143 Farm-In

18 Nov 2015 07:00

RNS Number : 0706G
UK Oil & Gas Investments PLC
18 November 2015
 



18 November 2015

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

OGA Approval of PEDL143 Farm-In, Holmwood Prospect, Weald Basin, UK

 

UK Oil & Gas Investments PLC (London AIM and ISDX:UKOG) announces that it has received final regulatory consent from the Oil and Gas Authority ("OGA") to acquire a 20% interest in UK onshore Weald Basin licence PEDL143, via the previously announced farm-in with Egdon Resources U.K. Limited ("Egdon").

PEDL143 covers 35.5 square miles and is located to the immediate west of Horse Hill licence PEDL137, in which UKOG has a 20.163% interest, and to the immediate south of the Brockham oil field, licence PL235, in which UKOG has an interest via its 6% ownership of Angus Energy Limited.

PEDL143 contains the Holmwood conventional prospect, which the PEDL143 partnership plans to test with the Holmwood-1 ("H-1") exploration well. Full planning consent was granted for the well in September 2015. The well is intended to be drilled to a total depth of approximately 4,600 ft (1,400 metres) true vertical depth, to penetrate the Upper and Lower Portland Sandstone reservoir targets, the full Kimmeridge tight oil section and the underlying Middle Jurassic Corallian Sandstone reservoir objective.

As previously reported, a Competent Persons Report ("CPR") by ERC Equipoise Limited ("ERCE") shows the H-1 exploration well will target mean gross prospective resources of 5.6 million barrels for the combined Portland and Corallian objectives.

The H-1 well will also provide a key new penetration into the Kimmeridge tight oil play fairway, adjacent to UKOG's Horse Hill licences. The H-1 well will represent only the third modern well to penetrate and sample the Kimmeridge tight oil section alongside Horse Hill-1 and Balcombe-2. Therefore, the well will provide an insightful modern data point in the overall tight oil proof of concept process in the Weald Basin.

The recently reported Nutech Wider Weald oil in place study indicates the Kimmeridge section to be favourably developed and with significant oil in place underlying the proposed H-1 well location and PEDL143. Nutech identified further significant tight oil potential in the Oxford Clay and Lias Formation sections underlying PEDL143.

The partnership anticipates that H-1 drilling will take place in late 2016 or early 2017.

Stephen Sanderson, UKOG's Executive Chairman commented:

"As a result of OGA's consent for the PEDL143 farm-In, UKOG has now materially increased the prospective resources and recoverable oil potential of its core Weald portfolio. The conventional Holmwood prospect alone adds an additional net 1.1 million mean unrisked barrels of prospective resources to UKOG.

 

The additional potential contained within the Kimmeridge tight oil section, to be tested by the H-1 well, provides the company with both a stronger overall position in the tight oil play fairway and a further opportunity to validate the regional extent and commerciality of the play.

 

Given UKOG's position in the Kimmeridge limestone play, together with its knowledgeable position in the Portland gained from Brockham and Horse Hill-1, we plan to be an active partner, particularly in assisting well design and data acquisition within the H-1 well.

 

We look forward to a fruitful relationship with the partnership and future success in the H-1 well."

 

Qualified Person's Statement:

 

Stephen Sanderson, UKOG's Executive Chairman, who has over 30 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information please contact:

UK Oil & Gas Investments PLC

Stephen Sanderson / Jason Berry Tel: 020 7440 0640

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / Mark Leonard Tel: 020 7220 1666

 

Square 1 Consulting (Public Relations)

David Bick / Brian Alexander Tel: 020 7929 5599

 

GLOSSARY

 

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

mean

or expected value, is the probability-weighted average of all possible values and is a measure of the central tendency either of a probability distribution or of the random variable characterised by that distribution

oil in place

the quantity of oil or petroleum that is estimated to exist originally in naturally occurring accumulations before any extraction or production

play

a set of known or postulated oil and or gas accumulations sharing similar geologic, geographic, and temporal properties, such as source rock, migration pathways, timing, trapping mechanism, and hydrocarbon type

Probability of Success (POS)

also known as chance of success (COS), being the probability that an exploration well will encounter flowable hydrocarbons from a prospect with a described volumetric probability distribution. The POS or COS represents the combined probability of the presence of key elements of a petroleum accumulation such as; the presence of mature source rock, effective hydrocarbon migration and charge, the presence of an effective reservoir and seal couplet and the presence and definition of a hydrocarbon trapping mechanism or trap

prospect

a project associated with a potential accumulation that is sufficiently well defined to represent a viable drilling target

prospective resources

those quantities of petroleum estimated, as of a given date, to be potentially recoverable from undiscovered accumulations by application of future development projects; potential accumulations are evaluated according to their chance of discovery and, assuming a discovery, the estimated quantities that would be recoverable under defined development projects. It is recognised that the development programs will be of significantly less detail and depend more heavily on analogue developments in the earlier phases of exploration

reservoir

a subsurface rock formation containing an individual natural accumulation of moveable petroleum that is confined by impermeable rock/formations

sandstone

a clastic sedimentary rock whose grains are predominantly sand-sized. The term is commonly used to imply consolidated sand or a rock made of predominantly quartz sand

tight oil

oil found or expected to be present within a reservoir with low permeability, i.e. a tight reservoir. The term, in the case of the Weald Tight Oil Plays, is applied to a play where trapped petroleum accumulations are expected to be pervasive throughout a large area and that are not significantly affected by hydrodynamic influences (also called "continuous-type deposits")

unrisked

without multiplying by the Probability of Success factor.

 

Notes to Editors:

The Company has interests in the following UK licences:

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

 

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field in stable production.

 

Baxters Copse 2

PEDL233

50%

UKOG Weald Limited

IGas Energy Plc

89.6

Reviewing economics of appraisal/ development well.

 

Brockham 1

PL234

3.6%

Angus Energy 5

Angus Energy 5

8.9

Drilling of sidetrack well being considered.

 

Holmwood 3

PEDL143

20%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

H-1 exploration well planned.

 

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production.

 

Horse Hill 4

PEDL137

20.163%

Horse Hill Developments Ltd 6

Horse Hill Developments Ltd 6

99.3

Flow testing of HH-1 planned, awaiting regulatory approvals.

 

Horse Hill 4

PEDL246

20.163%

Horse Hill Developments Ltd 6

Horse Hill Developments Ltd 6

43.6

Flow testing of HH-1 planned, awaiting regulatory approvals.

 

Isle of Wight (Offshore) 3

P1916

77.5%

UKOG Solent Limited

UKOG Solent Limited

46.7

Awaiting 14th Round, UKOG adjacent onshore acreage.

 

Isle of Wight (Onshore) 3

14th Round

TBA

TBA

TBA

200.0

Subject to 14th Round awards.

 

Lidsey 1

PL241

4.2%

Angus Energy 5

Angus Energy 5

5.3

Drilling of infill well being considered.

 

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Compiling Field Development Plan.

 

 

 

Notes:

 

1. Oil field currently in production.

 

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

 

4. Oil discovery pending flow testing.

 

5. UKOG has a 6% interest in Angus Energy. Angus Energy has a 70% interest in Lidsey and a 60% interest in Brockham.

 

6. UKOG has a direct 30% interest in HHDL, plus an indirect 1.02% interest via Angus Energy. HHDL has a 65% interest in PEDL137 and PEDL246.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUBUWRVAAAAAA
Date   Source Headline
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed
30th Mar 20231:44 pmRNSHolding(s) in Company
28th Mar 20237:37 amRNSHorse Hill Farmout
23rd Mar 20237:00 amRNSHorndean Field Resource Report by D&M
13th Mar 202310:34 amRNSTurkey: Pinarova-1 Construction Commences
8th Mar 20239:13 amRNSHolding(s) in Company
6th Mar 20237:00 amRNSTurkey: Pinarova-1 drilling update
3rd Mar 20233:09 pmRNSLoxley update
1st Mar 20237:00 amRNSTurkey: Pinarova-1 well update
27th Feb 20237:00 amRNSHorse Hill Water Reinjection Update
21st Feb 202311:05 amRNSSecond Price Monitoring Extn
21st Feb 202311:00 amRNSPrice Monitoring Extension
21st Feb 20237:00 amRNSRPS Loxley Gas Discovery Report
10th Feb 202310:06 amRNSTurkey Earthquake
6th Feb 20237:00 amRNSPEDL234 Loxley gas discovery update
1st Feb 20237:00 amRNSPEDL234 Loxley gas discovery update
26th Jan 20237:00 amRNSMeeting with Energy Minister Rt Hon Graham Stuart
23rd Jan 20237:00 amRNSHolding(s) in Company
11th Jan 20237:00 amRNSTurkey: Operational Update & New Pinarova-1 well
19th Dec 202211:59 amRNSHolding(s) in Company
1st Dec 20229:06 amRNSDirector Share Purchase
24th Nov 20225:50 pmRNSHolding(s) in Company
23rd Nov 20222:05 pmRNSSecond Price Monitoring Extn
23rd Nov 20222:00 pmRNSPrice Monitoring Extension
8th Nov 20227:10 amRNSDirector Share Purchase
14th Oct 20227:09 amRNSHigh Court upholds Loxley planning consent
6th Oct 20227:00 amRNSDirector Share Purchase
16th Sep 20227:00 amRNSTurkey Phase 2 seismic completed
13th Sep 20226:16 pmRNSHolding(s) in Company
12th Sep 20229:05 amRNSSecond Price Monitoring Extn
12th Sep 20229:00 amRNSPrice Monitoring Extension
12th Sep 20227:00 amRNSSuccessful Placing and appointment of new CFO
8th Sep 20229:05 amRNSSecond Price Monitoring Extn
8th Sep 20229:00 amRNSPrice Monitoring Extension
6th Sep 20222:00 pmRNSPrice Monitoring Extension
5th Sep 20224:41 pmRNSSecond Price Monitoring Extn
5th Sep 20224:35 pmRNSPrice Monitoring Extension
30th Aug 202211:02 amRNSDirector/PDMR Shareholding
15th Aug 202211:59 amRNSHorse Hill Update
27th Jul 20224:41 pmRNSSecond Price Monitoring Extn
27th Jul 20224:35 pmRNSPrice Monitoring Extension
27th Jul 20222:00 pmRNSSuccessful Placing
25th Jul 20227:00 amRNSDirector/PDMR Shareholding
20th Jul 20227:00 amRNSOperational Update
30th Jun 20227:05 amRNSInterim Results
30th Jun 20227:00 amRNSTurkey operational update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.