focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.036
Bid: 0.032
Ask: 0.04
Change: 0.0062 (21.38%)
Spread: 0.008 (25.00%)
Open: 0.029
High: 0.0352
Low: 0.0352
Prev. Close: 0.029
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Impact of Kimmeridge Limestone Oil on UK Economy

18 Apr 2016 07:01

RNS Number : 4442V
UK Oil & Gas Investments PLC
18 April 2016
 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

Impact of Kimmeridge Limestone Oil on UK Economy: EY Report ("the Report")

 

UK Oil & Gas Investments PLC (London AIM and ISDX: UKOG) has today released a commissioned Report, authored by EY, a global leader in assurance, tax, transaction and advisory services, which assesses the economic impact and benefits of future Kimmeridge Limestone oil production projects over the Weald Basin. The Report highlights the significant positive contribution to the UK economy, jobs and energy security that could result from this new potential oil production. EY's analysis builds on the recent highly successful oil flow tests from the Kimmeridge Limestones at the Horse Hill-1 ("HH-1") oil discovery, in which the Company has a 27.3% interest.

It should be noted that the Report is solely in relation to the potential extraction of oil from the two main Kimmeridge Limestones over the entire Weald Basin and is not an assessment of the Company's own 11 individual licence interests in the Weald.

Kimmeridge Limestone Oil - Economic Impact Highlights:

· Future peak oil production could provide approximately 4% to 27% of 2014 UK daily oil demand over the life of the project

· The Gross Value Added to the UK economy could range from £7.1 billion to £52.6 billion

· Generation of between approximately 1,000 to 5,600 jobs in the UK, averaged over the project's lifetime

· Lifetime tax revenues of between £2.1 billion to £18.1 billion

The Report:

Over the past decade, North Sea production has declined to the point where the UK is forecast to import over 50% of its daily oil demand by 2020. In this context, and following the HH-1 flow tests, EY have now produced a detailed analysis of how the extraction of oil from the Kimmeridge Limestones in the Weald could help arrest the decline of indigenous oil production and strengthen the UK's long-term energy security.

 

EY's economic impact forecasts utilised the Company's internal assumptions on production rates for a multiple horizontal well production site, together with Xodus Group's conceptual multi-well site development study and Nutech's calculated oil in the ground and likely oil recovery factors. These external studies were previously reported by the Company. The assumptions on individual production well performance were made prior to the unexpectedly high HH-1 flow test results, as first announced on 16 February 2016.

The EY Report states:

"The development of Kimmeridge Limestone Oil in the Weald Basin, assuming it can be extracted from a development site at the volumes projected by UKOG, has the potential to generate significant economic value to the UK economy, partially off-set the decline in oil production from UK fields, support employment, and generate significant tax benefits to the exchequer.

 

"These benefits will be maximised via the development of a UK-based supply chain, and through a series of targeted policies and initiatives to appropriately mitigate potential barriers to development.

"Conceptual studies and oil in place estimates previously conducted suggest a significant opportunity for the UK to secure a proportion of its energy from the Weald Basin."

Click here http://www.rns-pdf.londonstockexchange.com/rns/4442V_-2016-4-17.pdf to view the full EY Report.

Stephen Sanderson, UKOG's Executive Chairman commented:

"This Report confirms UKOG's view that the development of Kimmeridge Limestone oil in the Weald Basin can make a very significant contribution to the economy, employment and energy security of the UK.

The Report's conclusions are given credence by the recent results of the highly successful Kimmeridge Limestone flow tests at the Horse Hill-1 oil discovery. The tests demonstrate that significant volumes of high-quality light oil exists within the Kimmeridge Limestones and can flow naturally to surface at commercial rates.

The unexpectedly high aggregate flow rate of over 1365 barrels per day ("bopd") from Horse Hill's two Kimmeridge Limestones far exceeds the study's modelled peak flow rate of 400 bopd per horizontal well. It is, therefore, possible that the overall economic impact of Kimmeridge Limestone oil could be significantly higher than this initial Report describes."

The full EY Report and a summary Infographic are available on the Company's website: at www.ukogplc.com.

About EY:

EY is a global leader in assurance, tax, transaction and advisory services. The insights and quality services delivered help build trust and confidence in the capital markets and in economies the world over.

EY develops outstanding leaders who team to deliver on promises to all of its stakeholders. In so doing, EY plays a critical role in building a better working world for its people, for clients and for communities.

EY refers to the global organisation and may refer to one or more of the member firms of Ernst & Young Global Limited.

Qualified Person's Statement:

Stephen Sanderson, UKOG's Executive Chairman, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

UK Oil & Gas Investments PLC

Stephen Sanderson / Jason Berry Tel: 020 7440 0640

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / Mark Leonard Tel: 020 7220 1666

 

Square 1 Consulting (Public Relations)

David Bick / Brian Alexander Tel: 020 7929 5599

 

Glossary

 

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

Gross Value Added

or GVA, the contribution of each individual producer, industry or sector to the economy; the GVA of an economy is its GDP (Gross Domestic Product) adjusted for taxes and subsidies

horizontal well

a well that during drilling is steered so as to be at or close to 90 degrees from the vertical to follow a particular geological stratum or reservoir unit

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone. The Kimmeridge Limestones are effectively chalks being comprised of the remains of calcareous planktonic algae

moveable oil

oil that can flow or be pumped to the surface

oil in the ground

or oil in place, the quantity of oil or petroleum that is estimated to exist originally in naturally occurring accumulations in the ground before any extraction or production.

 

Notes to Editors:

The Company has interests in the following UK licences:

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

 

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field in stable production.

 

Baxters Copse 2

PEDL233

50%

UKOG Weald Limited

IGas Energy Plc

89.6

Reviewing economics of appraisal/ development well.

 

Brockham 1

PL234

3.6%

Angus Energy 5

Angus Energy 5

8.9

Drilling of sidetrack well being considered.

 

Holmwood 3

PEDL143

30%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

H-1 exploration commitment well planned.

 

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production.

 

Horse Hill 4

PEDL137

27.3%

Horse Hill Developments Ltd 6

Horse Hill Developments Ltd 6

99.3

Extended flow testing of HH-1.

 

Horse Hill 4

PEDL246

27.3%

Horse Hill Developments Ltd 6

Horse Hill Developments Ltd 6

43.6

Extended flow testing of HH-1.

 

Isle of Wight (Offshore) 3

P1916

77.5%

UKOG Solent Limited

UKOG Solent Limited

46.7

Preparing drilling planning submission.

 

Isle of Wight (Onshore) 2, 3

PEDL331

65%

UKOG

TBA

200.0

Preparing drilling planning submission.

 

Lidsey 1

PL241

4.2%

Angus Energy 5

Angus Energy 5

5.3

Drilling of infill well being considered.

 

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Compiling Field Development Plan.

 

 

Notes:

1. Oil field currently in production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Oil discovery with recently completed flow testing.

5. UKOG has a 6% interest in Angus Energy, which has a 70% interest in Lidsey and a 60% interest in Brockham.

6. UKOG has a direct 30% interest in HHDL, plus an indirect 0.72% interest via Angus Energy; HHDL has a 65% interest in PEDL137 and PEDL246.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGUUWCUPQURM
Date   Source Headline
4th Apr 201811:34 amRNSLoan Conversion
3rd Apr 20187:01 amRNSReport and Accounts for Year End 30 September 2017
29th Mar 201811:04 amRNSFinal Results for the Year Ended 30 September 2017
29th Mar 20188:55 amRNSFinal Results for the Year Ended 31 December 2017
29th Mar 20187:00 amRNSUpdate - Broadford Bridge-1
27th Mar 201812:42 pmRNSLoan Conversion
23rd Mar 201811:05 amRNSSecond Price Monitoring Extn
23rd Mar 201811:00 amRNSPrice Monitoring Extension
23rd Mar 20187:00 amRNSUpdate - Horse Hill
22nd Mar 201810:09 amRNSLoan Conversion
21st Mar 20182:25 pmRNSUpdate - Broadford Bridge-1
16th Mar 20182:58 pmRNSLoan Conversion
7th Mar 201810:35 amRNSLoan Conversion
6th Mar 20187:59 amRNSRegulatory Consent Update - Broadford Bridge-1/1z
27th Feb 20181:39 pmRNSLoan Conversion
20th Feb 20184:40 pmRNSSecond Price Monitoring Extn
20th Feb 20184:35 pmRNSPrice Monitoring Extension
20th Feb 20182:50 pmRNSUpdate - Broadford Bridge-1
9th Feb 20183:03 pmRNSLoan Conversion
6th Feb 20187:59 amRNSUpdate - Broadford Bridge-1
31st Jan 20187:00 amRNSUpdate - Isle of Wight
10th Jan 20184:52 pmRNSDelisting from NEX Exchange
27th Dec 20173:24 pmRNSAmended- Operational, Technical & Corporate Update
27th Dec 20177:00 amRNSOperational, Technical and Corporate Update
19th Dec 20177:00 amRNSOperational Update - Horse Hill-1
18th Dec 20173:56 pmRNSLoan Conversion
11th Dec 20175:17 pmRNSLoan Conversion
6th Dec 20177:00 amRNSLoan Conversion & Completion of Acquisition
24th Nov 20174:13 pmRNSLoan Conversion
20th Nov 20173:22 pmRNSLoan Conversion
15th Nov 20177:00 amRNS£10M Financing and BB-1z Optimised Flow Testing
9th Nov 201711:51 amRNSExercise of Options
20th Oct 201711:58 amRNSHoldings in Company
19th Oct 20179:25 amRNSHolding(s) in Company
19th Oct 20179:19 amRNSUpdate on Holmwood Well
18th Oct 20173:45 pmRNSHorse Hill - Planning Permission Granted
16th Oct 20173:11 pmRNSOperational Update
12th Oct 201712:13 pmRNSHolding(s) in Company
10th Oct 20175:18 pmRNSOperational Update
25th Sep 201712:05 pmRNSAcquisition of further interest in PEDL143
25th Sep 201710:35 amRNSHolding(s) in Company - Correction
25th Sep 201710:13 amRNSHolding(s) in Company
13th Sep 20177:00 amRNSUpdate - Broadford Bridge-1
11th Sep 20171:50 pmRNSExercise of Options
8th Sep 20177:00 amRNSUpdate - Horse Hill
6th Sep 20173:47 pmRNSOperational Update
24th Aug 20177:00 amRNSAcquisition of Further Interest in Horse Hill-1
10th Aug 20171:00 pmRNSOperational Update
31st Jul 20176:05 pmRNSOperational Update and Warrant Exercise
31st Jul 20175:11 pmRNSNotification of Major Holdings in Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.