Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.125
Bid: 0.12
Ask: 0.13
Change: 0.00 (0.00%)
Spread: 0.01 (8.333%)
Open: 0.125
High: 0.125
Low: 0.125
Prev. Close: 0.125
TYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Pyramid Drilling Update

13 Apr 2022 13:04

RNS Number : 3033I
Tertiary Minerals PLC
13 April 2022
 

13 April 2022

 

Tertiary Minerals plc

("Tertiary" or "the Company")

Pyramid Drilling Update

 

Tertiary Minerals plc (LON: TYM), the AIM traded mineral exploration and development company, whose strategic focus is on energy transition and precious metals, hereby announces results from the Company's recent drill programme at the Pyramid Silver‑Gold Project in Nevada. In summary, drilling at the North Ruth target has not, to date, demonstrated significant mineralisation at depth.

Follow the link to view the announcement in full including Figure 1 here.

Highlights

 

- A programme of soil and rock chip sampling and trenching was conducted in phases throughout 2021 which established wide intervals of significant silver and associated gold mineralisation at surface at North Ruth along a zone over 500 metres in length;

 

- Additional trenches were excavated in February 2022, providing additional evidence for the surface extent of the mineralised zone;

 

- Reverse circulation (RC) drilling, comprising 6 holes for a total of 1,050 metres (3,445 feet), was completed in early March 2022 in order to explore the potential continuation of this mineralisation at depth;

 

- The drilling completed has not, however, returned favourable results and the continuity of mineralisation at depth has therefore not yet been established. The Company will now spend some time reviewing these results in more detail, while at the same time continuing its activities on its other exploration projects in Nevada and in Zambia.

 

Commenting today, Managing Director Patrick Cullen said:

"The surface sampling and trenching completed throughout 2021 and early 2022, as well as the presence of extensive historic underground workings in the area, confirmed North Ruth as a drill target that warranted drilling.

We executed a limited and cost-effective drill program, utilising RC, to determine if the mineralisation is present at depth but the results have been disappointing. A detailed analysis of the results will be needed before any further exploration is undertaken. Indications are that localised supergene enrichment of silver has resulted in the grades observed at surface.

In the meantime, progress has been made with permitting at our Brunton Pass Copper Project, also in Nevada, and we will recommence activities there soon. In addition, we have already begun field work on the Jacks Copper Project in Zambia and expect to commence drilling in late April or early May 2022.

For more information please contact

Tertiary Minerals plc:

Patrick Cullen, Managing Director

+44 (0) 1625 838 679

SP Angel Corporate Finance LLP - Nominated Adviser and Broker

Richard Morrison

+44 (0) 203 470 0470

Caroline Rowe

Peterhouse Capital Limited - Joint Broker

Lucy Williams

+ 44 (0) 207 469 0930

Duncan Vasey

 

Note to Editors

Tertiary Minerals plc (LON: TYM) is an AIM traded mineral exploration and development company whose strategic focus is on energy transition and precious metals. The Company's projects are located in stable and democratic, geologically prospective, mining-friendly jurisdictions. Tertiary's principal activities are the discovery and development of copper, gold and silver resources in Nevada and in Zambia.

Market Abuse Regulation

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

Detailed Information

Background

The Pyramid Gold-Silver Project was established through a lease agreement, targeting epithermal gold and silver mineralisation at the northwest end of the prolific current and past producing Walker Lane Mineral Belt.

The Company conducted systematic exploration at Pyramid undertaking extensive soil sampling, rock-ship sampling, mapping, and three phases of trenching over soil anomalies between April 2021 and February 2022. At the North Ruth target, surface silver and gold mineralisation was demonstrated to extend over a strike extent of at least 530 metres, with a zone width of up to 59 metres and yielding up to 595 g/t silver (17.35 ounces/ton) and 0.66 g/t gold (Announcement dated 14 October 2021).

Drill Programme

Envirotech Drilling LLC ("Envirotech") of Winnemucca, Nevada was contracted to conduct RC drilling and commenced on 8 March, operating on a 24-hour basis until completion on 13 March 2022. The program was designed to test continuity of mineralisation at depth and along strike at the North Ruth target and comprised 6 holes (NR-01 to 06) for a total of 3,445 feet (1,050 metres).

RC samples were collected on 5-foot (1.52 metre) intervals providing 689 samples. 39 Field duplicates were collected throughout sampling. Additionally, 41 certified reference materials ("CRMs") and 40 blanks were inserted into the sample run. Significant drilling results are shown in Table 2. Upon completion of a drillhole International Directional Services ("IDS") performed downhole surveys using a gyroscopic survey tool to record azimuth and dip deviation. Collar locations were surveyed by handheld GPS and where two collars are adjacent, their relative position estimated to nearest metre.

Figure 1 below shows the collar locations for the holes drilled, Table 1 lists the collar coordinates and drillhole azimuths and Table 2 the most significant results.

 

(This figure, along with the announcement in full, can be viewed here.)

 

Figure 1: Location of RC drill holes NR-01 to NR-06 relative to rock chip samples and trenches. Historic underground activities are also indicated.

 

DHID

NAD83_11_X

NAD83_11_Y

MASL_Z

EOH (M)

COLLAR_AZI

COLLAR_INC

EOH_AZI

EOH_INC

NR-01

273863

4415628

1352

152.4

218

-45

225

-55

NR-02

273864

4415629

1352

219.5

217

-55

227

-58

NR-03

273916

4415597

1347

193.5

223

-46

234

-56

NR-04

273918

4415594

1347

214.9

205

-45

213

-45

NR-05

274075

4415284

1394

121.9

045

-60

046

-64

NR-06

273991

4415322

1362

147.8

044

-55

044

-63

Table 1: RC collars, azimuths and inclinations

 

DHID

From (ft)

To (ft)

Interval (ft)

From (m)

To (m)

Interval (m)

Au (ppm)

Ag (ppm)

NR-05

195

200

5

59.4

61.0

1.5

0.697

81

NR-05

170

175

5

51.8

53.3

1.5

0.089

18

NR-06

240

245

5

73.2

74.7

1.5

0.003

18

NR-06

15

20

5

4.6

6.1

1.5

0.249

16

NR-06

25

30

5

7.6

9.1

1.5

0.088

16

Table 2: Significant1 silver drill intersections

Holes NR-01, NR-02, NR-03 and NR-04 were designed to intersect targets beneath the highest grade surface mineralisation in Trench 1, Trench 1 Ext and Trench 8. No significant intersections are noted. Minor intersections are noted in holes NR-05 and NR-06 which were drilled towards the southern extent of the North Ruth target.

At this stage the discrepancy between surface and drill results is not explained and further evaluation is required. Faulting or surface enrichment are possible explanations.

Phase 3 Trenching

The Company also conducted a further, short program of trenching, comprising 3 trenches in February 2022 while drill pad and access construction was underway. Field observations and assay results continued to confirm the presence of mineralisation at surface and supported the plan to drill. The samples collected from the trenches were prepared and analysed by Paragon using the same methods as previous phases3. Significant intersections are presented below.

Trench

From (m)

To (m)

Interval (m)

Ag (g/t)

Au (g/t)

2b

42.67

46.63

3.96

20

0.30

14

3.05

9.14

6.09

18

0.09

14

13.41

17.37

3.96

41

0.33

14

61.57

64.62

3.05

16

0.29

 

Drill Sample Analysis and QA/QC

Drill samples were collected on-site by Paragon Geochemical ("Paragon") and transported under chain of custody to their facility in Reno, Nevada for sample preparation and analysis. Samples were prepared using code PREP-PKG where samples were crushed to 70% passing 10 mesh (2000 micron) and 1 kilogramme riffle split and crushed to 85% passing 200mesh (74 micron).

RC material was sampled over continuous 5-foot (1.53 metre) intervals. Gold and silver were analysed by method Au-AA Ag-GR, a 30g fire assay with gravimetric finish for silver and an atomic absorption spectroscopy finish for gold. As routine, Paragon implemented internal QA/QC procedures which were reviewed by the Company and are considered acceptable.

The Company implemented its own QA/QC protocol which involved field insertion of greater than 5% blanks, greater than 5% field duplicates and greater than 5% CRMs. QA/QC samples were inserted blind and assigned the same continuous sample number sequence as original samples. Two different CRMs were used to access both high- and low‑grade material. A review of assay results from the Company's QA/QC inserts were found to be acceptable.

 

Notes:

1. 'Significant' is defined as a minimum 2 metres width of sample grading a minimum of 15 g/t silver or 0.25 g/t gold in trenching and surface sampling. A width of 1.52 metres (5 feet) is applied for RC drilling in Nevada which relates to the standard sampling width. Narrow lower grade material may be included where they are internal to the reported intervals. Reported thicknesses of drill intersections are thicknesses measured downhole and therefore cannot be considered true thickness.

 

2. Units:

Rock samples reported in g/t = grammes/tonne

1 g/t = 0.029167 ounce/ton (i.e. troy ounces/US ton)

1ppm = 1 g/tonne

1 (Troy) ounce =31.105 g

 

3. Trench samples were collected by consulting Geologist Ivan Johnson as continuous chip samples over a maximum of 10 feet per sample. Samples were transported under chain of custody to Paragon Geochemical facilities in Reno, Nevada, for sample preparation. Samples were crushed to 85% passing 200mesh using method PREP-RMB. Gold was analysed by method Au-AA30 which comprises 30g fire assay with aqua regia digest/AAS finish. Multielement analysis (including Ag) was performed using method 33 MA-OES which comprised a 4-acid digest with ICP/OES finish. Ag overrange analysis was performed using method Ag-Gr50, a 30g fire assay with gravimetric finish. Paragon carries out duplicate, and standard and blank materials analysis as part of its internal QA/QC procedures. Grades reported above are weighted average grades of samples taken over varying widths from within the reported intervals.

 

4. The information in this release has been reviewed by Mr. Patrick Cheetham (MIMMM, M.Aus.IMM), Executive Chairman of Tertiary Minerals plc, who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies. Mr. Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

5. The news release may contain certain statements and expressions of belief, expectation or opinion which are forward looking statements, and which relate, inter alia, to the Company's proposed strategy, plans and objectives or to the expectations or intentions of the Company's directors. Such forward-looking statements involve known and unknown risks, uncertainties, and other important factors beyond the control of the Company that could cause the actual performance or achievements of the Company to be materially different from such forward-looking statements. Accordingly, you should not rely on any forward-looking statements and save as required by the AIM Rules for Companies or by law, the Company does not accept any obligation to disseminate any updates or revisions to such forward-looking statements.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLIJMTTMTMBBTT
Date   Source Headline
12th Dec 20147:00 amRNSAudited Results for the year to 30 September 2014
27th Nov 201412:10 pmRNSReplacement - Phase 3 Drilling Update
27th Nov 20147:00 amRNSPhase 3 Drilling Update
19th Nov 20149:45 amRNSPhase 3 Drilling Programme Update
29th Oct 20147:00 amRNSPhase 3 Drilling Programme Update
2nd Oct 20147:00 amRNSChange of Adviser
1st Oct 201410:55 amRNSIssue of Warrants
18th Sep 201412:02 pmRNSWarrant Extension
16th Sep 20147:00 amRNSMB Fluorspar Project - Drilling Programme awarded
10th Sep 20147:00 amRNSDirector Dealing & Issue of Equity
28th Aug 20147:00 amRNSUpdated Corporate Presentation
21st Aug 201412:38 pmRNSDirectors Share Holding - Correction Announcement
20th Aug 20145:57 pmRNSDirectors Share Issue and Total Voting Rights
30th Jul 20147:00 amRNSChange of Auditor
11th Jul 20147:00 amRNSPlacing & Issue of Equity
2nd Jul 20147:00 amRNS"Exploitation Permit Application"
19th May 20147:00 amRNSHalf Yearly Report
24th Apr 20147:00 amRNSStmnt re Share Price Movement
16th Apr 20147:00 amRNSMaiden JORC Compliant Mineral Resource Estimate
15th Apr 20148:14 amRNSDraw Down of Funds and Issue of Equity
19th Mar 201412:38 pmRNSHolding(s) in Company
10th Mar 20147:00 amRNSDrilling Results and Contract Award
25th Feb 20149:01 amRNSIssue of Equity
20th Feb 20147:00 amRNSResult of AGM
19th Feb 20147:00 amRNSUpdate of Corporate Presentation
17th Jan 20147:00 amRNSPosting of Annual Report and Notice of AGM
15th Jan 201411:58 amRNSIssue of Warrants
14th Jan 20149:40 amRNSExercise of Options - Issue of Equity and TVR
13th Jan 20147:00 amRNSMB Fluorspar Project Drilling Results
18th Dec 20137:00 amRNSMB Fluorspar Project - Drill Results
12th Dec 20133:45 pmRNSAudited Results for the year to 30 September 2013
13th Nov 20133:00 pmRNSHolding(s) in Company
13th Nov 201311:55 amRNSHolding(s) in Company
12th Nov 20137:01 amRNSDirectorate Change
12th Nov 20137:00 amRNSClose of Equity Swap Agreement
11th Sep 20137:00 amRNSMB Fluorspar Project Update
20th Aug 20132:58 pmRNSUpdated Company Presentation
20th Aug 20137:00 amRNSProject Update
14th Aug 20137:00 amRNSAppointment of Joint Broker
10th Jul 20137:00 amRNSMB Project Update
27th Jun 20133:22 pmRNSHolding(s) in Company
27th Jun 20133:21 pmRNSHolding(s) in Company
18th Jun 20137:00 amRNSDirector/PDMR Shareholding
30th May 201310:35 amRNSCorporate interview available online
24th May 20137:00 amRNSSubscription for Ordinary Shares and Equity Swap
14th May 20137:00 amRNSHalf Yearly Report
9th May 20137:00 amRNSMB Fluorspar Project - Update
22nd Mar 201311:25 amRNSDirector/PDMR Shareholding
18th Mar 20137:00 amRNSExercise of Options - Issue of Equity & TVR
8th Mar 20139:39 amRNSIssue of Equity and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.