Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    -0.005 (-8.70%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £2.71m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Kolari Update

3 Jan 2008 07:00

Tertiary Minerals PLC03 January 2008 TERTIARY MINERALS PLC www.tertiaryminerals.com 3 January 2008 DRILL ASSAY RESULTS CONFIRM WIDE INTERVALS OF IRON MINERALISATION AT KOLARI IRON ORE TARGET IN FINLAND • All Three Holes Confirm Potential For Near Surface Ore • Two Of Three Shallow Holes Start And End In Mineralisation_________________________________________________________________________ Tertiary Minerals plc ("Tertiary" or "the Company" - AIM: TYM) is pleased toannounce that assay results from initial sampling from its drilling programme inthe Kolari iron-ore district in northern Finland confirm that wide intervals ofmagnetite iron mineralisation are present on the Kolari claims over asignificant strike length. The drilling, on the Sivakkalehto target, comprised three 60 degree angled scoutholes at 200m intervals along the strike of the central part of a north-easttrending ground magnetic anomaly. The drill holes were between 101m and 126.5mlong. Sampling of the drill core for analysis was initially carried out to confirmvisual estimation of magnetite content and some of the mineralised intervalshave not yet been sampled. The following table summarises assay results andmineralised sections not yet assayed. Visual estimates correspond well with theassay results received and allow the additional comments on iron mineralisedintervals and grade to be included in the accompanying table of results. The 17-34% iron intervals reported in the table below represent magnetitecontents of approximately 25-50%. Normally, magnetite can be concentrated to asaleable product grading 67% iron or more. Tertiary's initial drill holes were shallow with only a single hole drilled oneach profile. Holes 07TS2 and 07TS3 both collared in bedrock mineralisation(beneath a cover of overburden) and also ended in mineralisation. This suggeststhat the mineralised units could be significantly wider than the intervalspenetrated by these holes. Hole 07TS1 also intersected a zone of weak coppermineralisation and gold values in all three holes were generally low. Based on these initial results the Company is now targeting a large body ofopen-pittable magnetite mineralisation with magnetite content in the 30-50%range. A similar such orebody - the Southdown Magnetite deposit in WesternAustralia - is currently being developed by Grange Resources(www.grangeresources.com.au) based on a resource of 400mt at 37% magnetite. Tertiary's Chairman Patrick Cheetham commented: "We are very pleased with theseresults. They indicate the possible presence of a large body of ironmineralisation at commercial grades." Further assaying of the core will now be undertaken and follow-up drilling isbeing planned. Further info: Patrick Cheetham, Executive Chairman, Tertiary Minerals plc. Tel: +44 (0)1625-626203Ron Marshman/John Greenhalgh, City of London PR Limited. Tel: +44(0)20-7628-5518 Notes:The information in this release has been compiled and reviewed by Mr. PatrickCheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIMGuidance Note for Mining Oil & Gas Companies issued on March 16, 2006. MrCheetham is a Member of the Institute of Materials, Minerals & Mining and also amember of the Australasian Institute of Mining & Metallurgy.The mineralisation intersected by the holes being reported is believed to besub-vertical and so the true thickness of mineralisation intersected by the 60degree dipping drill holes will be approximately 50% of the down holeintersected thickness that are reported. Table of Drill Results - Kolari Iron Project Down Hole IntersectionHole Number From To Thickness Iron Copper Comment m m m % % 07TS1 0.00 22.70 22.70 Overburden 31.40 58.60 27.20 17.5 0.12 Bedrock collared in mineralisation inc. 51.35 56.50 5.15 24.6 0.19 86.00 103.00 17.00 ? ? Similar iron grade - not yet assayed 07TS2 0.00 33.50 33.50 Overburden 33.50 56.05 22.55 ? ? Lower iron grade - not yet assayed 56.05 109.45 53.40 19.3 0.03 inc. 72.15 109.45 37.30 22.4 0.03 Similar iron grade to end of hole 109.45 126.20 16.80 ? ? - not yet assayed 07TS3 0.00 35.50 35.50 Overburden 35.50 72.00 36.50 28.4 0.00 inc. 38.25 47.00 8.75 34.0 0.00 Similar iron grade to end of hole 72.00 101.00 29.00 ? ? - not yet assayed This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
6th Aug 20097:00 amRNSStoruman Scoping Study Update
31st Jul 20097:00 amRNSTotal Voting Rights
24th Jul 20094:27 pmRNSDirectors' Share Issue
2nd Jul 200912:42 pmRNSPlacing of 12,000,000 New Ordinary Shares
21st May 200912:21 pmRNSHalf Yearly Report
9th Mar 20097:00 amRNSProject Update
2nd Mar 200911:47 amRNSDirector/PDMR Shareholding
27th Feb 20097:00 amRNSTotal Voting Rights
13th Feb 20092:26 pmRNSPlacing
2nd Feb 20092:08 pmRNSDirector/PDMR Shareholding
2nd Feb 20099:59 amRNSResult of AGM
24th Dec 20087:00 amRNSReport and Accounts
10th Dec 20087:00 amRNSGrant of Warrants
9th Dec 20087:00 amRNSTerm of Exploration Licences Extended
8th Dec 20082:00 pmRNSFinal Results
5th Nov 20087:00 amRNSStoruman Fluorite Drilling Assays
8th Oct 20087:00 amRNSKolari Iron Testwork Results
5th Sep 20087:00 amRNSStoruman Scoping Study Commis
2nd Sep 20087:00 amRNSStoruman Drilling Results
13th Aug 20087:00 amRNSTrading on PLUS Markets
8th Jul 20087:00 amRNSProject Update
21st May 20082:12 pmRNSInterim Results
13th May 20086:00 amRNSStoruman Drill Programme - Pr
14th Apr 20087:00 amRNSCommencing of drilling
22nd Feb 20089:17 amRNSResult of AGM
21st Feb 20087:00 amRNSAGM Statement
29th Jan 200811:51 amRNSNotice of AGM
24th Jan 20087:00 amRNSMajor New Project Acquisition
14th Jan 20087:00 amRNSFinal Results
3rd Jan 20087:00 amRNSKolari Update
30th Nov 200711:58 amRNSTotal Voting Rights
29th Nov 20077:00 amRNSIron-ore drilling update
1st Nov 200712:11 pmRNSGrant of warrants
31st Oct 20073:39 pmRNSAdditional Listing
18th Oct 200712:00 pmRNSKolari Drilling Update
6th Sep 200712:23 pmRNSP. Joint Venture Agreement
5th Sep 20077:01 amRNSFinland Iron-ore Project
14th Aug 20073:46 pmRNSAIM Rule 26
9th Jul 20077:30 amRNSRestoration-Tertiary Minerals
9th Jul 20077:30 amRNSInterim Results
9th Jul 20077:30 amRNSStatement re Suspension
18th Apr 20074:58 pmRNSDirector/PDMR Shareholding
18th Apr 200711:09 amRNSHolding(s) in Company
26th Jan 20072:39 pmRNSAGM Statement
10th Jan 200711:01 amRNSStatement re Ghurayyah
10th Jan 200711:00 amRNSSuspension- Tertiary Minerals
22nd Dec 20061:04 pmRNSNotice of AGM
19th Dec 200612:01 pmRNSTotal Voting Rights
11th Dec 20067:00 amRNSFinal Results
29th Nov 20069:13 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.