The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTSG.L Regulatory News (TSG)

  • There is currently no data for TSG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Project Update

22 May 2008 07:00

RNS Number : 0073V
Trans-Siberian Gold PLC
22 May 2008
 



Trans-Siberian Gold plc

Asacha Project update

LONDON: 22 May 2008 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L) reportthat it has undertaken a comprehensive review of the scope, costs and economics of its Asacha project over the past eight months. The review took longer than anticipated due to the need for extensive investigations into plant foundation requirements in this seismically active location and the need to supply grid power instead of relying on diesel power generation as previously planned to avoid the latter's increasingly high costs and supply risksAccess to grid power has proven feasible with very significant operating cost savings, albeit at the expense of a slower build up to full production, with the originally planned annual throughput of 200,000 tonnes of ore now expected to be achieved in 2011.

During the review period detailed design work has continued, mining of the main development access adit has commenced, the accommodation camp has been substantially completed after modification and earthworks and foundation work are also in progress.

The total project cost until Asacha is cash flow positive is now estimated at US$105.6 million, net of US$6.3 million VAT recoveries, compared to the September 2007 estimate of US$101.2 million (net of VAT recoveries of US$3.2 million). The total project cost includes pre-commissioning mining costs of US$5.0 million, other pre-start up operating expenditure of US$23.6 million and contingency of US$4.0 millionUS$58.3 million, net of US$1.4 million VAT recovered, has been spent up to the end of April 2008.

The US$4.7 million increase in pre-start up capital expenditure from the September 2007 estimate includes a net increase of US$3.5 million for the provision of external power supply. Other capital cost increases have been partially offset by savings in a number of areas, principally through the use of own labour and equipment for a major part of the infrastructure and tailings dam construction.

Projected operating costs have also been substantially reduced. At a gold price of US$750/oz, Life of mine ("LOM") cash costs on an all equity basis on total gold production of 590,000 oz are forecast at US$200/oz, before taking account of a US$32/oz credit from silver production. Cash costs including all royalties and taxes (in total US$70.9 million, net of VAT recoveries) on an all equity basis are forecast at US$320/oz. Total costs on the same basisafter depreciation of all capital expenditure (including US$10.5 million post start up) and pre-start up mining and other operating expenditure, are forecast at US$514/oz.

Mine output is expected to increase from 70,000 mt of ore in 2009 to 150,000 mt in 2010 and 200,000 mt in 2011, with gold production of 12,000 oz in 2009, 56,000 oz in 2010 and 68,000 oz in 2011. Based on the current JORC resource, operations would continue thereafter at that level for four and a half years, with annual production increasing to between 95,000 oz and 111,000 oz due to higher grades. However it is expected that overall exploitable reserves will be increased by at least 50% from the 590,000 ounces assumed in the current feasibility study, principally from the northern extension to the main orebody. Exploration also continues at Rodnikova where the JORC resource currently comprises 166,000 ounces in the indicated category and an additional 238,000 ounces inferred.

The projected return of the Asacha project on an all equity basis at a gold price of US$750/oz is over 20% and close to 50% when expenditure to date is excluded.

TSG reported on 25 February 2008 that the previously reported increase in the interest of UFG Asset Management ("UFG") and its associates to 32.96% of the Company's shares constituted an Event of Change of Control ("ECC") in respect of the US$10 million loan provided to TSG by AngloGold Ashanti Limited ("AGA") in June 2006 (the "AGA loan") The AGA loan had been repayable in equal tranches, on the first and second anniversaries of the commencement of gold production at Asacha, and was convertible into TSG shares when the Company raised new equity, however as a result of the ECC the capital and accrued interest of the loan became immediately due and payable. TSG has repaid US$4 million and accrued interest, in total US$5.7 million, in accordance with an agreed payment schedule, in line with the Company's maturing cash deposits.

The Group's total requirement for additional funds before the Asacha mine is cash flow positive, including further exploration at Rodnikova, corporate costs and the purchase of the remaining 4.98% minority interest in Asacha is US$50 million. 

Discussions are in progress with Russian banks in respect of project finance of US$25/30 million. TSG also plans to raise up to US$25 million of new equity through a placing during the next two months. UFG has indicated that it is prepared to subscribe for a minimum of US$10 million of this new equity.

The Asacha licence requires TSG to bring the Asacha mining enterprise into operation at its projected capacity in accordance with the technical design at a rate of not less than 1,000 kg of gold per annum before the end of 2008. Although it is now expected that the Asacha plant will only be commissioned in the third quarter of 2009, due to the delays in resolving the power issue, the mine will be operating at a rate commensurate with the minimum capacity required by the end of 2008. The Companbelieves that it is operating in full compliance with the license agreement.

The TSG Board believes that, after many setbacks and disappointments, the Company is now on course to complete the necessary funding over the next few months and start commercial production in 2009, with the financial prospects based on currently projected gold prices better than they have ever been.

Ends

Contacts:

TSG

Simon Olsen   +44 (0) 1223 265760

Seymour Pierce

Stuart Lane  +44 (0) 20 7107 8000

Geological information in this report is based on data reviewed by Mr V Zhouravlev, Chief Geologist of OOO Trans-Siberian Gold Management who is an expert of the GKZ (State Reserves Commission of the Russian Federation) with 45 years relevant experience in mineral exploration and a Qualified Person under AIM rules. Mr Zhouravlev consents to the inclusion of the information in the form and context in which it appears.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEAFIFSASEEI
Date   Source Headline
29th Sep 201612:16 pmRNSResult of General Meeting
5th Sep 20167:00 amRNSProposed capital reduction and Notice of GM
29th Jul 20161:27 pmRNSDirector/PDMR Shareholding
29th Jul 20161:26 pmRNSDirector/PDMR Shareholding
28th Jul 20164:23 pmRNSHolding(s) in Company
28th Jul 20163:47 pmRNSHolding(s) in Company
18th Jul 20167:00 amRNSAsacha mining and production update
30th Jun 20163:11 pmRNSResult of AGM
30th Jun 20167:00 amRNSHolding(s) in Company
30th Jun 20167:00 amRNSAsacha Mining and Production Update
9th Jun 20167:00 amRNSFinal Results
18th Apr 20167:00 amRNSAsacha mining and production update
9th Feb 20162:09 pmRNSStmnt re Share Price Movement
20th Jan 20167:00 amRNS4th Quarter Production Update
14th Oct 20157:00 amRNSAsacha mining and production update
28th Sep 20157:00 amRNSResults for the half year ended 30 Jun 2015
13th Jul 20157:00 amRNSAsacha production update
29th Jun 201512:47 pmRNSResult of Annual General Meeting
29th Jun 20159:10 amRNSAsacha mining and production update
8th Jun 20157:00 amRNS2014 Final Results and Notice of AGM
17th Apr 20157:00 amRNSAsacha mining and production update
26th Jan 20157:00 amRNSAsacha mining and production update
20th Oct 20147:00 amRNSAsacha mining and production update
30th Sep 20147:00 amRNSInterim Results for the half year ended 30/6/2014
11th Sep 20147:00 amRNSProduction Update & Rodnikova Licence Termination
17th Jul 20147:00 amRNSAsacha mining and production update
30th Jun 20143:00 pmRNSResult of AGM & Directorate Change
30th Jun 20147:00 amRNSAsacha mining and production update
9th Jun 20147:00 amRNSAnnual Financial Results & Notice of AGM
24th Apr 20147:00 amRNSAsacha mining and production update
21st Jan 20147:00 amRNSAsacha Mining and Production Update
17th Oct 20137:00 amRNSAsacha Mining & Production Update
30th Sep 20137:00 amRNSInterim results for the period ended 30 June 2013
19th Jul 20137:00 amRNSAsacha mining and production update
26th Jun 201311:24 amRNSResult of AGM
26th Jun 20137:00 amRNSAsacha mining and production update
19th Jun 20139:00 amRNSDirectorate Changes
5th Jun 20137:00 amRNSFinal Results for the year ended 31 December 2012
16th Apr 20137:00 amRNSAsacha mining and production update
22nd Feb 201310:12 amRNSChange of Adviser
23rd Jan 20137:00 amRNSAsacha Mining and Production Update
29th Oct 20127:00 amRNSAsacha Mining and Production Update
27th Sep 20127:00 amRNSHalf Yearly Report
16th Jul 20127:00 amRNSAsacha Mining & Production Update & New Loans
22nd Jun 201212:49 pmRNSAGM Statement
22nd Jun 20127:00 amRNSAGM Asacha Production Update
29th May 20127:00 amRNSPosting of Final Results and Notice of AGM
28th May 20127:00 amRNSFinal Results for the year ended 31 December 2011
24th Apr 20127:00 amRNSAsacha Mining and Production Update
3rd Feb 201212:33 pmRNSConversion of debt and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.