Operations Update

6 Nov 2018 07:00

RNS Number : 4138G
Tlou Energy Ltd
06 November 2018
 

6 November 2018

 

Tlou Energy Limited

 

("Tlou" or "the Company")

 

Operations Update

 

 

Tlou Energy Limited, the ASX, AIM and BSE listed company focused on developing gas-to-power projects in southern Africa using coal bed methane ("CBM") natural gas from its gas field in Botswana, is pleased to provide an update on field operations at its Lesedi CBM project.

 

Key Points:

· Vertical well 'Lesedi 3P' has been drilled and reached a total depth of 575m

· Drilling has commenced at the second vertical well 'Lesedi 4P' which was spudded on 4 November 2018

· Program aims to provide gas flow data in the area where the initial project development is proposed

 

Update of Drilling operations

As previously announced Tlou Energy Limited commenced drilling operations at the Lesedi CBM Project ('Lesedi'), with the first well, 'Lesedi 3P' being spudded on 16 October 2018. This vertical production well has been drilled successfully and reached a total depth of 575m.

 

Wireline logs were acquired over the open hole interval of Lesedi 3P. The well intersected the Lower Morupule coal seam, which is the target seam for dual lateral wells, planned to be drilled for approximately 700m in-seam, which will then intersect with Lesedi 3P.

 

The rig was released from location on Friday 2 November and then set up at the Lesedi 4P location. Lesedi 4P was spudded on 4 November 2018. Operations at Lesedi 4P will follow the same program as for Lesedi 3P. The well is planned to be drilled to a proposed total depth of approximately 580m.

 

Background on Drilling program

Tlou will drill the Lesedi production wells as 'dual lateral pods', comprising a single vertical production well intersected by two lateral wells. This will be followed by production testing with the potential to ultimately convert a significant portion of the currently established gas resources to reserves and to deliver gas to a proposed central processing facility and power station located in close proximity.

 

The vertical wells along with the top-hole (vertical) sections of the lateral wells are being drilled first. Thereafter, the lateral sections of the wells will be drilled using specialist directional drilling equipment.

 

Once drilled, the wells will then be completed using a separate workover rig and surface facilities installed. Production start-up is targeted to commence in early 2019. The wells will be on production for an extended period of time to de-water and lower the pressure in the coal seam to achieve gas flow.

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

For further information regarding this announcement please contact:

 

Tlou Energy Limited

+61 7 3012 9793

Tony Gilby, Managing Director

Solomon Rowland, General Manager

Grant Thornton (Nominated Adviser)

+44 (0)20 7383 5100

Samantha Harrison, Colin Aaronson, Harrison Clarke

Shore Capital (Broker)

+44 (0) 207 408 4090

Jerry Keen, Toby Gibbs, Mark Percy

FlowComms Limited (Investor Relations)

+44 (0) 7891 677 441

Sasha Sethi

 

Company Information

Tlou Energy is focused on delivering Gas-to-Power solutions in Botswana and southern Africa to alleviate some of the chronic power shortage in the region. Tlou is developing projects using coal bed methane ("CBM") natural gas. Botswana has a significant energy shortage and generally relies on expensive imported power and diesel generation to fulfil its power requirements. As 100% owner of the most advanced gas project in the country, the Lesedi CBM Project, Tlou Energy provides investors with access to a compelling opportunity using domestic gas to produce power and displace expensive diesel and imported power.

 

The Company is listed on the Australian Securities Exchange, London's AIM market and the Botswana Stock Exchange and is led by an experienced Board, management and advisory team including individuals with successful track records in the CBM industry.

 

Since establishment, the Company has significantly de-risked the project in consideration of its goal to become a significant gas-to-power producer. The Company flared its first gas in 2014, holds a Mining Licence and nine Prospecting Licences, covering an area of ~8,300Km2 in total. The Lesedi and Mamba Projects already benefits from significant independently certified Contingent Gas Resources of ~3 trillion cubic feet (3C) and independently certified Gas Reserves of 41 billion cubic feet (2C) and ~426 billion cubic feet (3P).

 

The Company is planning an initial scalable gas-to-power project. Following successful implementation of this first scalable project, the Company looks forward to evaluating longer-term prospects for the delivery of electricity generated from CBM in Botswana to neighbouring countries.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLFKPDNDBDBFDK
Date   Source Headline
31st Dec 20247:00 amRNSCancellation - Tlou Energy Limited
20th Dec 20246:00 pmRNSTlou Energy
26th Nov 20247:00 amRNSResult of AGM and Update on AIM Cancellation
22nd Nov 20247:00 amRNSLesedi Project Update
7th Nov 20247:00 amRNSDirector/PDMR Shareholding
5th Nov 20247:00 amRNSHistorical RPT and New Loan Agreement
30th Oct 20247:00 amRNSQuarterly Activities Report q/e 30 September 2024
28th Oct 20247:01 amRNSNotice of AGM
28th Oct 20247:00 amRNSProposed Cancellation of Admission to AIM
26th Sep 20247:00 amRNSFinal Results
27th Aug 20247:00 amRNSNotice of GM
23rd Aug 20247:00 amRNSA$1m Placement
31st Jul 20247:00 amRNSMezzanine Debt Facility term sheet
26th Jul 20247:00 amRNSQuarterly Activities Report q/e 30 June 2024
29th Apr 20247:00 amRNSFurther Placement of Entitlement Offer Shortfall
26th Apr 20247:00 amRNSQuarterly Activities Report q/e 31 March 2024
26th Mar 20247:00 amRNSPlacement of Entitlement Offer Shortfall
8th Mar 20247:00 amRNSInterim Results
23rd Feb 20247:00 amRNSLesedi Project Update
5th Feb 20247:00 amRNSResults of Entitlement Offer
24th Jan 20247:00 amRNSQuarterly Activities Report q/e 31 December 2023
8th Jan 20247:00 amRNSNon-Renounceable Entitlement Offer Extension
22nd Dec 202311:18 amRNSResult of General Meeting
15th Dec 20237:00 amRNSNon-Renounceable Entitlement Offer
27th Nov 20237:00 amRNSFirst Gas Flow from Lesedi 6 Production Pod
24th Nov 20239:00 amRNSNotice of General Meeting
6th Nov 20237:00 amRNSA$3m Loan Agreement
31st Oct 20237:00 amRNSResults of AGM and Chairman's Address
27th Oct 20237:00 amRNSQuarterly Activities Report q/e 30 September 2023
6th Oct 20237:00 amRNSCompletion of Private Placement
29th Sep 20238:31 amRNSFinal Results
29th Sep 20237:00 amRNSNotice of AGM
11th Sep 20239:19 amRNSDate of 2023 Annual General Meeting
11th Sep 20237:00 amRNSLesedi Drilling and Project Update
25th Jul 20237:00 amRNSQuarterly Activities Report q/e 30 June 2023
22nd Jun 20233:22 pmRNSUpdate - Results of Entitlement Offer
20th Jun 20237:22 amRNSResults of Entitlement Offer
14th Jun 20237:00 amRNSDrilling and Operational Update
12th Jun 20234:23 pmRNSPublication of Supplementary Prospectus
5th Jun 20237:38 amRNSEntitlement Offer – Extension of Closing Date
23rd May 20239:43 amRNSDespatch of Prospectus to Eligible Shareholders
12th May 20237:00 amRNSPartially Underwritten Entitlement Offer
2nd May 20237:00 amRNSA$2m Loan Agreement Signed
28th Apr 20237:00 amRNSQuarterly Activities Report
13th Apr 20237:09 amRNSLesedi 6 Production Well Drilling
27th Mar 20237:13 amRNSA$200k placement
15th Mar 20237:00 amRNSGas Production Well and Core-hole Drilling
9th Mar 20237:00 amRNSInterim Results
23rd Feb 20232:25 pmRNSInterview with Proactive Investors
27th Jan 20237:00 amRNSOperational Report Quarter ended 31 December 2022

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.