Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.60    0.00 (0.00%)
Bid:
0.55
Ask:
0.65
Spread: 0.10 (18.182%)
Market Cap: £6.18m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

Thor to Develop Gold Operation at Spring Hill

24 Jun 2013 07:00

RNS Number : 6716H
Thor Mining PLC
24 June 2013
 

24 June 2013

THOR MINING PLC

 

THOR TO DEVELOP GOLD OPERATION - SPRING HILL PROJECT

 

The Directors of Thor Mining PLC ("Thor") (AIM, ASX: THR) are pleased to announce that it is preparing for mine development, commencing within 12 months, following positive results of a study to extract near surface oxide ore from the Spring Hilgold project south of Darwin in Australia's Northern Territory.

 

Since signing a Memorandum of Understanding (MOU) for the toll treatment of gold ore with Crocodile Gold Australian Operations Pty Ltd, a subsidiary of Toronto-listed Crocodile Cold Corporation (TSX "CRK") and announced on 10th April 2013, Thor, with co-venturer Western Desert Resources (WDR), has been developing a proposal to accelerate development at Spring Hill. An opportunity has been identified which may expedite early environmental and regulatory approval to mine shallow oxidised ore by constraining the initial mine plan to extract only near surface oxide material for processing off-site. Mining of deeper transition and primary ore will be subject of subsequent studies and approval applications.

 

Highlights:

·; Notice of Intent (NOI) lodged with the Northern Territory Department of Mines and Energy.

·; Initial ore extraction from near surface oxide portion of the resource.

·; Plan for up to 900,000 tonnes of ore yielding between 40,000 and 45,000 ounces of gold over a 2 - 3 year period.

·; Ore to be delivered to Crocodile Gold Union Reefs processing plant for treatment.

·; Capital cost estimate below A$5million.

·; Economic studies and permitting for mining deeper primary ore will continue.

 

A pit optimisation study by independent consultants AVCS Pty Ltd has determined that 900,000 tonnes of ore from the upper portions of the resource are economic based upon criteria outlined in Table 1. below.

This represents a portion of the resource predominantly in the zone of oxidation, which is selected on economic criteria, and also because the environmental approvals process may reduce if waste material mined (along with the ore) and stored in nearby waste dumps, does not contain primary (potentially acid forming) material.

It is intended that economic studies and permitting will continue for the subsequent mining of the deeper transition and primary ore.

Further drilling is also planned to delineate additional, low cost near surface mineralisation

 

Table 1: Key Operating and Financial Assumptions (base case)

Mining

Ore mined

880,000

tonnes

Ore cut-off grade

0.8

grams / tonne

Diluted ore grade mined

1.56

grams / tonne

Waste mined

1,970,000

tonnes

Stripping ratio

2.2 : 1

Processing

Ore transported to Union Reefs & processed

880,000

tonnes

Feed grade

1.56

grams / tonne

Metallurgical recovery

90%

Ounces recovered

41,300

Financial Assumptions / Outcomes

US$ Gold price

US$1,400

per ounce

A$ / US$ exchange rate

0.95

A$ Gold price

A$1,473

per ounce

Mining costs (ore and waste)

A$4:00

per tonne

Processing costs

A$33:00

per tonne

Total Operating costs

A$1,170

per ounce

Capital Cost

Less than A$5 million

 

The capital estimate of less than A$5 million has not been subject to detailed engineering, however the project does not require the construction and provision of processing plant and camp facilities, as these are included in operating estimates for toll treatment and contract supply estimates. The principal capital expenditure requirements are the establishment of a waste dump, some minor pads, the establishment of a road from the pit to existing tracks (approximately 1 kilometre) and the upgrading of those tracks (approximately 3.5 kilometres) to the point where they meet existing public roads.

 

A Notice of Intent (NOI) has been prepared and lodged with the Northern Territory Department of Mines and Energy in respect of the proposed development at Spring Hill. Assessment of the NOI will determine the level of environmental and other regulatory compliance required, and therefore, an estimate of approval timing. While this process should not be underestimated, it is anticipated that a proposed mining operation which does not require a processing plant, has no requirement for a tailings storage facility, and is not expected to generate acidic liquor from waste dumps will face comparatively fewer environmental hurdles.

 

About the Spring Hill Gold Project

The Spring Hill project is located approximately 150 km south of Darwin in Australia's Northern Territory. The location is served by all-weather access and is in close proximity to the sealed arterial Stuart Highway, and other local infrastructure.

 

Thor holds a 51% equity interest in the Spring Hill project, and is exercising rights to increase that interest to 80%.

 

Table 2: Undiluted Resource Estimate(6.9 million tonnes @ 1.74g/t gold Cutoff grade 0.7 g/t)

Category

Measured

Indicated

Inferred

--------- Total --------

Tonnes (Mt)

Grade g/t

 Au

Tonnes (Mt)

Grade g/t

Au

Tonnes (Mt)

Grade g/t

Au

Tonnes (Mt)

Grade g/t

Au

Contained Gold

(K oz)

Zone of Oxidation

-

-

3.14

1.59

-

-

3.14

1.59

161

Transition Zone

-

-

0.87

1.78

-

-

0.87

1.78

50

Unweathered Zone

-

-

2.94

1.89

-

-

2.94

1.89

178

Total

-

-

6.95

1.74

-

-

6.95

1.74

389

Thor Mining PLC holds equity rights to 80% of this resource, including current 51% project ownership.

Estimate: McDonald Speijers, November 2012

 

Commenting, Mr Mick Billing, Executive Chairman of Thor Mining, said:

 

"This is an opportunity to achieve an attractive early return from a very modest investment in Spring Hill, with plenty of scope to further exploit this resource in the future. This does not detract from our work at Molyhil which remains a key project for Thor, and where optimisation work is continuing. We are also pleased to note a 25% increase in tungsten prices so far this year and the recent weakening of the Australian dollar against the US currency, both of which are positive for the economic outcomes for Molyhil"

 

Enquiries:

 

Mick Billing

+61 (8) 7324 1935

 

Thor Mining PLC

Executive Chairman

Allan Burchard

+61 (8) 7324 1935

 

Thor Mining PLC

CFO/Company Secretary

Colin Aaronson/ David Hignell

+44 (0) 207 383 5100

 

Grant Thornton Corporate Finance

 

Nominated Adviser

Nick Emerson/

Renato Rufus

+44 (0) 1483 413500

Simple Investments

Broker

Alex Walters

 

+44 (0) 7771 713608

+44 (0) 207 839 9260

Cadogan PR

Financial PR

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email.

Competent Persons Statements

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

The information in this report that relates to the Spring Hill Mineral Resource is based on information compiled by Diederik Speijers who is a Fellow of The Australasian Institute of Mining and Metallurgy and published on 20 November 2012. Mr Speijers is the principal of consulting firm McDonald Speijers. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Diederik Speijers consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFIMATMBATMMJ
Date   Source Headline
25th Nov 20219:15 amRNSIssue of Equity
23rd Nov 20217:00 amRNSOver 45m of Mineralisation Intercepted at Molyhil
22nd Nov 20218:45 amRNSDirector/PDMR Shareholding
16th Nov 20217:32 amRNSStage 1 Earn-in Completed at Alford East
11th Nov 202110:02 amRNSHolding(s) in Company
10th Nov 20211:04 pmRNSResult of AGM
10th Nov 202110:00 amRNSAGM Statement
8th Nov 20217:00 amRNSCommencement of Drilling at Molyhil Project
1st Nov 20217:00 amRNSSale Option Exercised for $1.8m at Pilot Mountain
29th Oct 20217:02 amRNSQuarterly Activity Report July to September 2021
25th Oct 20217:00 amRNSAlford East Presentation
18th Oct 20217:00 amRNSHydrogeology Results
12th Oct 20218:29 amRNSNotice of AGM
11th Oct 20217:00 amRNSRC Drilling Program Commences at Ragged Range
7th Oct 20217:00 amRNSNew Gold Assays Define Drill Ready Targets
4th Oct 20217:00 amRNSBoard Change
30th Sep 20211:11 pmRNSResults for the year ended 30 June 2021
30th Sep 20217:40 amRNSInvestor Presentation
17th Sep 20218:24 amRNSInvestor Presentation
17th Sep 20217:00 amRNSKapunda Drilling
15th Sep 20217:14 amRNSExercise of Options
13th Sep 20214:40 pmRNSSecond Price Monitoring Extn
13th Sep 20214:35 pmRNSPrice Monitoring Extension
13th Sep 20212:05 pmRNSSecond Price Monitoring Extn
13th Sep 20212:00 pmRNSPrice Monitoring Extension
13th Sep 20217:00 amRNSBoard Change
2nd Sep 20218:05 amRNSDirector Resignation
31st Aug 202111:45 amRNSSale Option - Pilot Mountain Project
31st Aug 20217:00 amRNSAlford East Drilling Results
31st Aug 20217:00 amRNSTotal Voting Rights
25th Aug 20217:00 amRNSCompletion of initial drilling program and results
11th Aug 20217:00 amRNSStrategic Placement
2nd Aug 20217:00 amRNSAppointment of Exploration Manager
30th Jul 20217:00 amRNSInvestor Presentation
27th Jul 20217:00 amRNSQuarterly Report April to June 2021
29th Jun 20217:00 amRNSPreliminary Drilling Results at Alford East, SA
25th Jun 20219:17 amRNSIssue of Warrants
23rd Jun 20217:00 amRNSExploration Update: Ragged Range, WA
10th Jun 20217:01 amRNSISR Explanatory Video
10th Jun 20217:00 amRNSDrilling Commences at Alford East
3rd Jun 20217:00 amRNSGrant funding for Molyhil
28th May 20217:00 amRNSDirector/PDMR Shareholding
25th May 20219:30 amRNSReplacement: Issue of Equity
25th May 20217:00 amRNSIssue of Equity
20th May 20217:00 amRNSSouth Australian Government Funding A$300,000
6th May 20217:00 amRNSInvestor Presentation
30th Apr 20217:00 amRNSQuarterly Report January to March 2021
27th Apr 20218:42 amRNSReplacement: Managing Director Appointment
20th Apr 20217:00 amRNSManaging Director Appointment
12th Apr 20217:47 amRNSRagged Range Gold Project - Field Work Commences

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.