Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTern Regulatory News (TERN)

Share Price Information for Tern (TERN)

Share Price is delayed by 15 minutes
Get Live Data
1.20    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.20 (18.182%)
Market Cap: £10.27m
TERN Live PriceLast checked at - London Stock Exchange

Intraday Tern Share Chart

Operations Update

6 Dec 2011 07:00

RNS Number : 3836T
Silvermere Energy PLC
06 December 2011
Β 

ο»Ώ

6 December 2011

Β 

Β 

Silvermere Energy PLC

("Silvermere" or "the Company")

Β 

Operations Update

Β 

Β 

Silvermere, the independent oil and gas company focusing principally on exploration, appraisal and production opportunities in the US, is pleased to confirm that preparations for production from the I-1 well on its Mustang Island asset located in Kleberg County, Texas waters in the Gulf of Mexico are on schedule for production to commence at the end of 2011.

Β 

The operator, Dominion Production Company LLC (the "Operator"), has reported to the Company that platform construction is in its final stages with load-out operations about to get underway in Galveston. Load-out is scheduled to be completed by the 13th December.

Β 

Once load-out is completed, the loaded work barges will be mobilised to the designated platform location and made ready for installation. The installation programme is expected to take 14 days and will be completed by the tie-in of the well to the pipeline.

Β 

The Operator has also reported that the work to lay the 1,250 feet of 6-inch pipeline required to connect from the main 20-inch trunk line to the designated platform location is now scheduled to start on 15th December. Whilst this is slightly later than previously advised it is not expected to delay the start of production as this runs in parallel with installation.

Β 

Weather and sea conditions in the area are unpredictable at this time of year. After load-out the Operator will co-ordinate the best departure date for the barges with contractors in order to minimize any exposure to delays due to adverse weather. Weather delays, if encountered, could extend the above installation time frame to some extent. Further updates will be provided as appropriate.

Β 

Commenting on these developments, Andy Morrison, Chief Executive of Silvermere said:

Β 

"We are excited about the progress of the project and the approach of production, and we are working closely with the Operator to minimize any delays. Assuming reasonable co-operation from the weather, our objective of production before the end of the year is achievable."

Β 

Β 

-ENDS-

Β 

Β 

For further information please contact:

Β 

Silvermere Energy PLC

Andy Morrison, Chief Executive

Β 

Β 

Β 

Β 

+44 (0)7980 878561

Β 

Merchant Securities Limited (Nominated Adviser and Broker)

Lindsay Mair/Virginia Bull

Β 

Rivington Street Corporate Finance Limited

Jon Levinson/Dru Edmonstone

Β 

Β 

+ 44(0)20 7628 2200Β 

Β 

Β 

+44 (0)20 7562 3357

Β 

Bishopgate Communications

Nick Rome/Shabnam Bashir

Β 

+44(0)20 7562 3350

Β 

Β 

About Silvermere Energy PLC

Β 

The Company acquired its interest in the Mustang Asset on 30 August 2011. This comprises a 33.33 per cent. working interest and 20.83 per cent. net entitlement interest in the Mustang Licence Area, an area within the southern half of the north west quarter and northern half of the south west quarter of the Block 818-L field as defined in State of Texas Oil and Gas Lease numbers 108873 and 108874. The Mustang Island 818-L field, located in Kleberg County waters of the Gulf of Mexico, is a field re-habilitation project targeting bypassed or only partially produced gas-condensate.

Β 

Early in 2011 the Hercules Offshore 205 jack-up rig was contracted to re-enter the I-1 Well on the Mustang Licence Area which was considered to be the most likely of the historic well sites to provide 14 optimum re-entry conditions. The I-1Well re-entry and side-tracking operation was completed in March 2011 leaving it ready to complete in sand horizons I-1 to I-6. Production and flow testing was carried out during June 2011. The well re-entry programme was led by Dominion as the operator. Gas and oil produced from the I-1Well is proposed to be connected to pipeline infrastructure and tied in via a subsea assembly, constructed for the purpose and then transported to the Six Pigs gas facility.

Β 

Silvermere's strategy is to acquire a portfolio of US oil and gas licence interests onshore and in shallow offshore waters, characterised by relatively low risk and low cost with the potential for near term production.

Β 

Silvermere is quoted onΒ the AIM Market of the London Stock Exchange plc (AIM: SLME) with its offices in London.

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCLLFVRFRLEIIL
Date   Source Headline
16th Dec 20247:01 amRNS-ROnline Investor Presentation and Q&A Session
16th Dec 20247:00 amRNSPlacing to raise £400,000
1st Nov 20247:00 amRNSDirector/PDMR Shareholding
29th Oct 20247:00 amRNSBoard Changes
25th Oct 20248:27 amRNSFurther re. Wyld Networks Rights Issue
15th Oct 20247:00 amRNSPlacing to raise £625,000
30th Sep 20245:04 pmRNSTotal Voting Rights
30th Sep 20247:00 amRNSDevice Authority Update
23rd Sep 202411:13 amRNSReplacement: Results of Open Offer
23rd Sep 202411:10 amRNSResult of General Meeting
23rd Sep 20247:00 amRNSResults of Open Offer
5th Sep 20247:00 amRNSOpen Offer and Notice of General Meeting
5th Sep 20247:00 amRNSInterim results for the six months to 30 June 2024
2nd Sep 202410:16 amRNSStatement re Wyld Networks Rights Issue
9th Aug 20247:00 amRNSPartial sale of Device Authority holding
27th Jun 202412:00 pmRNSResult of AGM
31st May 20245:00 pmRNSTotal Voting Rights
30th May 20247:00 amRNSResults for the year ended 31 December 2023
15th May 20247:00 amRNSExercise of Warrants
3rd May 20247:45 amRNSFurther re. Wyld Networks Warrant Exercise Process
30th Apr 20245:00 pmRNSTotal Voting Rights
25th Apr 20247:00 amRNSExercise of warrants held in Wyld Networks
12th Apr 20247:00 amRNSPlacing to raise £420,000
9th Apr 20247:00 amRNSTalking Medicines record revenue bookings in Q1 24
21st Mar 20247:00 amRNSOnline Investor Presentation and Q&A Session
5th Mar 20247:00 amRNSKonektio Administration
7th Feb 20247:00 amRNSDevice Authority Fund Raise
1st Feb 20247:00 amRNSTalking Medicines Fundraise
31st Jan 20245:32 pmRNSTotal Voting Rights
24th Jan 20247:00 amRNSPlacing to raise £400,000
15th Jan 20243:22 pmRNSHolding(s) in Company
28th Dec 20237:00 amRNSCompletion of Tranche One of the DA Fund raise
27th Dec 20237:00 amRNSDevice Authority Fund raise
29th Nov 20237:00 amRNSKonektio update
24th Nov 20237:00 amRNSInvestor Webinar Recording
21st Nov 20237:00 amRNSCompany and Portfolio Update
15th Nov 20237:00 amRNSOnline Investor Presentation and Q&A Session
8th Nov 20237:00 amRNSKonektio update
26th Sep 202312:19 pmRNSResult of GM
31st Aug 20237:00 amRNSNotice of General Meeting
16th Aug 20237:00 amRNSInterim results for the six months to 30 June 2023
10th Aug 20237:00 amRNSBoard and Management Restructuring
4th Aug 20231:33 pmRNSStatement re Share Price Movement
4th Jul 20237:00 amRNSDevice Authority convertible loan note extension
30th Jun 20235:00 pmRNSTotal Voting Rights
29th Jun 202310:09 amRNSResult of AGM and Directorate Change
28th Jun 20237:00 amRNSDevice Authority - Winner of Microsoft Award
12th Jun 202311:35 amRNSFunding facility
31st May 20237:00 amRNSResults for the year ended 31 December 2022
26th May 20237:00 amRNSKonektio Fundraise

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.