SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksShearwater Regulatory News (SWG)

Share Price Information for Shearwater (SWG)

Share Price is delayed by 15 minutes
Get Live Data
37.00    -0.50 (-1.33%)
Bid:
36.00
Ask:
38.00
Spread: 2.00 (5.556%)
Market Cap: £8.82m
SWG Live PriceLast checked at - London Stock Exchange

Intraday Shearwater Share Chart

Successful Feasibility Study

19 Dec 2006 07:02

Aurum Mining PLC19 December 2006 For immediate release 19 December 2006 AURUM MINING PLC ("Aurum" or "the Company") Completion of Bankable Feasibility Study for Andash Zone 1 Aurum Mining plc (AIM: AUR), the company formed to acquire gold and othermineral extraction projects in the Former Soviet Union (FSU), is pleased toannounce the successful completion of the bankable feasibility study for theproject financing and construction of the proposed mine at Andash Zone 1 in theKyrgyz Republic. The feasibility study was compiled by Wardell Armstong International (WAI), aleading UK mining consultant with particular expertise in the FSU, inassociation with engineering consultants GBM and ground engineering andenvironmental services group, Golder Associates. The bankable feasibility studyalso takes into account the local feasibility study prepared earlier this yearby Ken-Too Design and Research Centre, the leading Kyrgyz mining consultancy. The feasibility study, which confirms that the open-cast Andash operation willcombine low costs with high production rates, contains the followinghighlights: Measured and indicated resource base increased 12.5% to 19.2 million tons at1.1g/t gold and 0.4% copper Additional low grade measured and indicated resource of 5.74 million tonnes at0.44g/t and 0.15 % copper Proven and probable reserve of 16 million tonnes, containing over 1.2 millionozs of Gold and Gold equivalent in copper giving an in-ground value of over$750m Mining rate of 2m tpa with a pit life of 8.5 years Stripping ratio of 0.8 tonnes of waste to 1 tonne of ore Average cash operating costs of $223 per oz of gold and gold equivalent Capital cost of $55.5 million including contingencies Payback period of 3.3 years and an IRR of 39.7%, The IRR assumes an ongoing price for gold of $550 per oz, with copper fallingfrom an assumed start price of $6480 to $4077 per tonne during the paybackperiod Aurum is in discussions with various parties on a financial package for themine's construction. Construction of the mine, preparatory work for which isalready under way, will begin as soon as finance is in place with commercialproduction expected in 2008. The significant extent of the Zone 1 resource identified in the feasibilitystudy means that the maximum deferred consideration of $5 million in shares willbecome payable under the terms of Aurum's acquisition in 2005 of the Andashproject from Kaldora Company Limited. This consideration has been calculated byreference to $10 for every ounce of gold equivalent to reserve identified in thefeasibility study and will be settled by the Company issuing 2,500,000 ordinaryshares of 1p each. The payment of the maximum consideration in respect of the Zone 1 resource aloneunderlines the quality of the Zone 1 asset and the Company is pleased to notethat no further deferred consideration will fall due in respect of the otherexploration areas within the Andash licence area. The Andash Zone 1 mineable reserves are now Mineable ReservesOre Type Tonnes Au (g/t) Cu (%)Oxide High Grade 2,073,300 0.79 0.40Sulphide High Grade 12,135,270 1.20 0.43Oxide Low Grade 444,700 0.40 0.21Sulphide Low Grade 1,348,100 0.36 0.16Total 16,001,370 1.05 0.40 The life and production rates of the Andash mine are expected to besignificantly greater than was originally anticipated from Zone 1 alone. Therecent positive exploration studies, announced on 16 November 2006, atTokhtonysay, the new Nakhodka exploration area announced on 7 December 2006, aswell as zones 2 and 3 are likely to increase resource potential significantly. Adrilling programme is planned in the New Year to provide further understandingof the potential resource which will be developed using the infrastructuredesigned for zone 1. Mark Jones, Aurum Mining's Chief Executive, said: "The completion of thefeasibility study marks a further important step in the development of theAndash mine, and highlights that our strategy of fast tracking Zone 1, insteadof bringing on all zones concurrently has been the optimal route for Aurum. Wenow have strong upside potential which will further reward all our stakeholders. Following the recent award of a Mining Licence by the Kyrgyz authorities, wehave now completed all of the preparatory work for the project financing of theAndash Zone 1 mine, giving us confidence that we can begin construction of themine in the coming months and produce gold and copper in 2008." For further information: Aurum Mining plc Tel: 020 7478 9050Mark Jones, Chief Executive Arbuthnot Securities Tel: 020 7012 2000Graham Swindells Buchanan Communications Tel: 020 7466 5000Mark Court / Rebecca Skye Dietrich Notes to editors Aurum Mining joined the AIM market of the London Stock Exchange in May 2004 withthe strategy of seeking, evaluating and acquiring gold and other mineralextraction projects in the Former Soviet Union (FSU). In January 2005 theCompany completed its first acquisition, giving the Company an explorationlicence over the Andash gold and copper project in the Kyrgyz Republic. Miningconsultant Wardell Armstrong International has confirmed a JORC resourceestimate of 1.49 million ozs of gold and gold equivalent in Andash Zone 1 inMeasured and Indicated categories. A Mining Licence for the Andash area wasawarded by the Kyrgyz authorities in November 2006. The feasibility study forZone 1 is scheduled for completion by the end of this year, allowing productionto begin in 2008. The Andash project also includes the Zone 2 and Zone 3 alongwith Tokhtonysay, Nakhodka and three other additional exploration areas. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Nov 20163:00 pmRNSHolding(s) in Company
2nd Nov 201611:55 amRNSHolding(s) in Company
2nd Nov 20168:32 amRNSHolding(s) in Company
2nd Nov 20167:00 amRNSHolding(s) in Company
25th Oct 20167:00 amRNSDirector/PDMR Shareholding
24th Oct 20167:00 amRNSDirectorate Change
10th Oct 20167:02 amRNSIssue of Equity
10th Oct 20167:00 amRNSDirectorate Change
7th Oct 20162:44 pmRNSHolding(s) in Company
6th Oct 201611:20 amRNSHolding(s) in Company
6th Oct 20167:00 amRNSHolding(s) in Company
3rd Oct 20167:00 amRNSAppointment of CEO and Grant of options
30th Sep 20169:00 amRNSDirector/PDMR Shareholding
29th Sep 201612:36 pmRNSResult of AGM
21st Sep 20167:00 amRNSIssue of Equity
8th Sep 20167:00 amRNSDirectorate Change
25th Aug 20167:00 amRNSFinal Results
21st Jul 20167:00 amRNSIssue of Equity
17th Jun 20167:00 amRNSConvertible Loan and Trading Update
11th Feb 20163:40 pmRNSConvertible loan agreement & Director dealing
19th Nov 20157:00 amRNSHalf Yearly Report
26th Aug 20151:20 pmRNSHolding(s) in Company
6th Aug 201512:34 pmRNSResult of AGM
30th Jun 20157:00 amRNSFinal Results
15th Apr 20157:00 amRNSIssue of New Equity and Directorate Change
20th Mar 20151:30 pmRNSDirectorate Change
17th Mar 20152:29 pmRNSHolding(s) in Company
6th Nov 20147:00 amRNSHalf Yearly Report
21st Aug 20147:00 amRNSPosting of Annual Report and Issue of New Equity
18th Aug 20147:00 amRNSFinal Results
18th Jun 20148:10 amRNSUpdate on the Morille tungsten project
22nd May 20147:00 amRNSUpdate on the Morille tungsten project
9th May 201412:20 pmRNSHolding(s) in Company
19th Feb 20144:27 pmRNSHolding(s) in Company
11th Dec 20137:00 amRNSHalf Yearly Report
31st Oct 20137:00 amRNSCompletion of farmout
22nd Oct 20137:00 amRNSExercise of farmout option
7th Oct 20137:00 amRNSPotential farmout
12th Sep 201312:24 pmRNSResult of AGM
5th Jul 201312:50 pmRNSAnnual Financial Report
28th Jun 20137:00 amRNSFinal Results
28th Jun 20137:00 amRNSCabeza drilling results and update
11th Apr 20133:29 pmRNSHolding(s) in Company
2nd Apr 20138:54 amRNSCommencement of Drilling
21st Mar 20137:00 amRNSMorille Tungsten Project Update
11th Mar 20137:00 amRNSPeralonso Drilling Results And Update
5th Feb 201311:27 amRNSHolding(s) in Company
4th Feb 20137:00 amRNSEncouraging Gold Prospecting Results
23rd Jan 20137:00 amRNSPeralonso Drilling Results
17th Dec 20127:00 amRNSCabeza Trenching Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.