Less Ads, More Data, More Tools Register for FREE

Pin to quick picksShearwater Regulatory News (SWG)

Share Price Information for Shearwater (SWG)

Share Price is delayed by 15 minutes
Get Live Data
37.00    0.00 (0.00%)
Bid:
36.00
Ask:
38.00
Spread: 2.00 (5.556%)
Market Cap: £8.82m
SWG Live PriceLast checked at - London Stock Exchange

Intraday Shearwater Share Chart

Peralonso Drilling Results And Update

11 Mar 2013 07:00

RNS Number : 6320Z
Aurum Mining PLC
11 March 2013
 



News Release

March 11th 2013

AURUM MINING PLC

("Aurum" or "the Company")

Peralonso drilling results and update

Aurum Mining plc (AIM: AUR), the Spanish focussed gold and tungsten explorer, is pleased to announce further positive assay results from the second stage drilling programme at the Peralonso Permit in the Salamanca Province and to give an overview of progress made on the project to date.

 

Highlights

 

·; Of the 11 holes drilled at Peralonso to date over 1,267 metres, 10 have encountered gold mineralisation in excess of 1 g/t over multiple intersections.

·; Assay results indicate the existence of multiple near surface gold bearing structures within the area of an extensive gold-in-soil geochemical anomaly (400 x 400m).

·; Drilling results have identified some wide mineralised structures in addition to some high grade sections. Best results include; 13.3m at 2.59 g/t, 10.1m at 3.39 g/t, 9.2m at 2.09 g/t, 18m at 0.70 g/t, 6m at 1.38g/t (from surface) and 1.0m at 33.2g/t.

·; Prospecting work carried out 1.2 kilometres ENE of the area of drilling at Peralonso returned some excellent results - of a total of 23 float samples collected in this area, 13 samples returned grades greater than 3 g/t gold, with maximum values of 10.05 g/t and 13.5 g/t. This prospecting work was carried out along the inferred strike extensions of Peralonso and raises the prospect that the opportunity in this area may have significant scale.

·; Follow up exploration is now being undertaken on the permit area to ensure that the extent of the opportunity is more fully understood.

 

A map showing the drill hole locations at Peralonso and a cross sectional view of the mineralised structures is available on the Company's website.

 

 

Sean Finlay, Aurum's Chairman, said:

 

"We are very encouraged by these results from Peralonso. Of the eleven holes drilled on the permit area to date, ten have encountered gold mineralisation in excess of 1 g/t over multiple intersections. These, combined with other exploration work carried out at the permit area, verify our belief that Peralonso and the surrounding area has the potential to host sizeable, near surface gold bearing structures. Follow up work is now being undertaken to enable us to better understand the scale and extent of the opportunity.

 

Given the positive results that have come from all three of the Company's gold projects in recent months, we continue to be both optimistic and excited about the potential of our gold portfolio in North West Spain.

 

Exploration work continues across the Company's gold portfolio and we are strongly of the opinion that this activity will provide us with further positive news in the months ahead."

 

Further detail

 

To date, 11 holes have been drilled at Peralonso over a total depth of 1,267 metres, testing for near surface gold mineralisation. The results from the initial three hole drill programme were announced in July 2012, and the results from the first six holes of the recent eight hole programme were announced in January 2013.

 

Results have now been received for all 11 holes drilled at Peralonso, and they clearly demonstrate widespread near surface gold mineralisation on the target area. Recent prospecting work carried approximately 1.2 kilometres ENE of the drilling area, along the inferred strike extensions, also produced very encouraging results raising the prospect that the structures identified to date at Peralonso may have significant scale. These prospecting results were announced in February 2013.

 

Drilling tested the shallow depth extent of the gold mineralisation encountered in previous trenching within the area of an extensive gold-in-soil geochemical anomaly (400 x 400m). Results from the 11 holes drilled so far are reported below. Drilling to-date suggests that near surface gold mineralisation is hosted within multiple steeply-dipping altered zones within granites, characterised by quartz veining and breccias which exhibit several phases of brecciation. Detailed structural interpretation and an assessment of the correlation of the mineralised structures identified by the two drilling campaigns is currently being carried out.

 

 

 

 

Significant Intercepts at a 0.5g/t cut (1m minimum width of intercept and 4m maximum internal dilution)

 

Hole

Length (m)

Dip/Azimuth

From (m)

Thickness (m)

Gold (g/t)

PERDD001

126.1

-50o/288o

0

7.0

1.30

and

16.0

1.0

9.88

and

40.0

1.2

1.61

and

46.9

10.1

3.39

incl

46.9

1.1

22.7

and

78.0

1.0

0.89

and

110.7

13.3

2.59

incl

110.7

1.4

21.5

PERDD002

75.1

-50o/290o

8.9

5.8

1.14

PERDD004

100.0

-50o/290o

72.0

1.0

4.51

and

79.0

7.0

2.42

PERDD005

201.3

-50o/290o

32.0

1.0

0.89

and

68.0

1.0

0.88

and

75.0

6.0

1.87

and

99.8

9.2

2.09

and

150.0

1.0

0.82

and

164.0

1.0

2.68

and

171.0

2.0

1.24

PERDD006

125.5

-50o/290o

0.0

6.0

1.38

and

78.0

1.0

0.51

PERDD007

125.5

-50o/290o

49.0

2.0

10.18

PERDD008

89.5

-50o/290o

73.7

1.4

0.59

and

80.0

3.0

1.17

PERDD009

100.3

-50o/290o

40.0

18.0

0.70

and

63.0

1.0

0.52

New Holes

PERDD010

126.0

-50o/290o

31.0

3.0

1.59

and

56.0

1.0

0.56

and

92.0

1.0

33.20

and

110.0

6.0

0.69

PERDD011

123.0

-50o/293o

28.0

1.0

2.14

and

58.0

1.0

1.12

and

79.0

1.0

3.59

 

 

The true thicknesses are currently interpreted to be around 70% of the drilled thickness (interval).

 

 

Notes to table:

 

Sampling, Assaying and Quality Control Measures

 

All drill core has been routinely logged by an experienced geologist. Relevant core intervals were split in half by diamond saw, with half being sent for assay and the other half being retained in the core boxes for reference. Sampling is mainly carried out over one metre intervals.

 

Sample preparation and analyses were performed at ALS Chemex (Spain). Assays are reported using Fire Assay and AAS on a 50g sample.  Reference samples (blanks, duplicates and certified standards) are routinely included in each sample batch as quality control measures. In addition check assays are performed on selected mineralised samples.

 

 

Qualified Person

 

Simon Beardsmore, BSc (hons), ARSM, MIMMM, CEng, Technical Manager of Aurum Mining plc, and a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

 

Contacts:

Aurum Mining plc

www.aurummining.net

Chris Eadie, Chief Executive Officer

+44 (0) 20 7499 4000

WH Ireland Limited

Nominated Adviser & Broker

Mike Coe

+44 (0) 117 945 3470

Newgate Threadneedle

Financial PR

Graham Herring / Beth Harris / Richard Gotla

+44 (0) 20 7653 9853

 

Notes to Editors:

Aurum Mining is an AIM listed exploration and development company focused on its highly prospective portfolio of gold and tungsten assets in North West Spain.

Gold

Through its joint venture agreement with Ormonde Mining plc (AIM: ORM), Aurum currently has a 60% interest in the Pino de Oro project in Zamora Province and a 54% interest in the Peralonso and Cabeza projects in Salamanca Province.

Tungsten

Aurum's 100% owned Morille Tungsten project is located approximately 15km south west of Salamanca in North West Spain and covers an area of 5,796 hectares. The permit area is a 'brownfield' site with historical data indicating the production from the site of high quality tungsten concentrates from mineralisation grading up to 1% WO3. This historic work will provide key information on where initial exploration targets are located.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSMFMAFDSEED
Date   Source Headline
8th Jun 201010:56 amRNSForm 8.3 - Scott Wilson Group PLC
8th Jun 201010:53 amBUSForm 8.3 - SCOTT WILSON GROUP
8th Jun 201010:11 amRNSForm 8.3 - Scott Wilson
7th Jun 20103:01 pmRNSStatement re Share Price Movement
30th Apr 20107:00 amRNSPre-Close Statement
21st Apr 201011:49 amRNSContract Win
21st Apr 201011:34 amRNSSale of Andash Stake - Update
21st Apr 20107:00 amRNSQueens Award Win
19th Apr 20107:00 amRNSContract Win
16th Apr 201012:00 pmRNSHolding(s) in Company
16th Apr 201011:58 amRNSHolding(s) in Company
8th Apr 20104:39 pmRNSBlocklisting Interim Review - Approved
8th Apr 20104:37 pmRNSBlocklisting Interim Review - Unapproved
31st Mar 20107:00 amRNSCommercial Agreement on Sale of Andash Stake
26th Mar 201010:06 amRNSHolding(s) in Company
22nd Mar 20107:00 amRNSHolding(s) in Company
17th Mar 20106:02 pmRNSDirector/PDMR Shareholding
9th Mar 20107:00 amRNSInterim Management Statement
1st Mar 20102:40 pmRNSDirector/PDMR Shareholding
26th Feb 20104:04 pmRNSTotal Voting Rights
25th Feb 201010:06 amRNSHolding(s) in Company
18th Feb 20103:34 pmRNSHolding(s) in Company
11th Feb 201012:08 pmRNSCompletion of Andash Buyback
2nd Feb 20103:30 pmRNSTransfer of Treasury Shares
1st Feb 201012:01 pmRNSTotal Voting Rights
1st Feb 20107:00 amRNSTreasury Stock
11th Jan 20102:41 pmRNSHolding(s) in Company
5th Jan 20101:38 pmRNSRe Contract
31st Dec 20099:00 amRNSTotal Voting Rights
22nd Dec 20093:07 pmRNSCompletion of disposal of Andash asset
22nd Dec 200912:42 pmRNSTransaction in Own Shares
15th Dec 20097:00 amRNSInterim Results
7th Dec 20097:00 amRNSInterim Results - 6 months ended 30 September 2009
1st Dec 20095:01 pmRNSHolding(s) in Company
16th Nov 20091:19 pmRNSHolding(s) in Company
12th Nov 200911:18 amRNSResult of General Meeting
5th Nov 20092:01 pmRNSHolding(s) in Company
29th Oct 20095:30 pmRNSDirector/PDMR Shareholding
29th Oct 20095:29 pmRNSDirector/PDMR Shareholding
29th Oct 20097:00 amRNSPre-Close Statement
27th Oct 20092:14 pmRNSHolding(s) in Company
23rd Oct 200912:25 pmRNSResult of AGM and Posting of Circular
22nd Oct 20092:10 pmRNSHolding(s) in Company
19th Oct 200910:07 amRNSAndash Project - Exercise of Options
5th Oct 200912:55 pmRNSRe Contract
1st Oct 200911:37 amRNSRestated Segmental Analysis
28th Sep 20097:00 amRNSAndash project update
25th Sep 200910:54 amRNSHolding(s) in Company
18th Sep 20097:00 amRNSFinal Results year ended 31 March 2009
4th Sep 20095:07 pmRNSAnnual Information Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.