focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksStellar Diamonds Regulatory News (STEL)

  • There is currently no data for STEL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kono bulk sampling diamond grade results

6 Feb 2012 07:00

RNS Number : 8249W
Stellar Diamonds PLC
06 February 2012
 



 

 

 

 

 

 

NOT FOR DISTRIBUTION IN THE UNITED STATES OR FOR DISSEMINATION TO US NEWS WIRE SERVICES.

 

6 February 2012

 

AIM: STEL

Stellar Diamonds plc

("Stellar" or the "Company")

 

Encouraging Diamond Grades from Lion-5 Kimberlite Project in Kono, Sierra Leone

 

Stellar Diamonds plc, the London listed (AIM: STEL) diamond mining and exploration company focused on West Africa, provides initial bulk sampling diamond grade results from the Lion-5 kimberlite dyke at its 87km2 Kono diamond licence in eastern Sierra Leone.

 

Highlights:

·; Lion-5 kimberlite mapped over 1,990m with an average width of 1.5m at the bulk sample site

·; 346 dry tonnes of kimberlite sampled yielding 244 carats for in-situ grade of 70cpht

·; Diamonds of 4.45ct, 3.22ct, 3.07ct, 3.0ct & 2.57ct, with 62% of stones observed as gem quality

·; Previous trial mining at Kono by Stellar produced 4,200 carats of high quality diamonds

 

Chief Executive Karl Smithson commented:

"These results indicate that the Lion-5 kimberlite has significant exploration potential. The dyke forms part of an extensive swarm of kimberlite dykes that run from the Stellar licence areas into the adjacent mine lease held by Koidu Holdings, which is embarking on a US$150million mine expansion programme. The kimberlite grade of 70cpht is consistent with our previous trial mining results from the Pol-K and Bardu kimberlites at Kono, where we previously recovered 4,200 carats of good quality diamond from our established 50 tonne per hour DMS plant. It is clear that the Kono permits hold significant value for Stellar and we intend to continue the exploration and evaluation work to develop this potential."

 

Lion-5 Bulk Sampling and Processing

The Lion-5 kimberlite has been mapped over a distance of 1,990m to date, however based on satellite imagery and the presence of previous artisanal workings the kimberlite is expected to extend beyond this distance. The kimberlite was excavated by Stellar over a 60m length, adjacent to the Koidu Holdings mining lease, with observed widths ranging from 84cm to 198cm, and with the average width calculated at 148cm. Since the kimberlite was competent in nature, drilling and blasting was required to extract it. Dilution with granitic country rock during this process was calculated at 14%.

 

The kimberlite extracted was transported to the Company's active sampling plant at Tongo, some 60km to the south. Here the sample was crushed and processed via a 5 tonne per hour Dense Media Separation plant with diamond recovery being by grease tables in a secure container. The whole process was observed by a Government Mines Monitoring Officer.

 

Some 400.59 tonnes of kimberlite/granite was extracted from the sample trench, of which 346.35 tonnes was calculated to be kimberlite. From this sample some 243.8 carats were recovered for a +1mm in-situ dry grade of 70.39cpht. Encouragingly, approximately 62% of the diamonds recovered (by weight) are classified as gem quality, with the five largest stones recovered weighing 4.45ct, 3.22ct, 3.07ct, 3.00ct, 2.57ct. The results of the processing are summarised below.

 

Lion-5 Bulk Sampling Results

To 3rd February 2012

Kimberlite and granite processed (dry tonnes)

400.59

Kimberlite processed (dry tonnes)

346.35

Carats recovered

243.8

Undiluted in-situ grade +1mm (cpht)

70.39

Diluted grade +1mm (cpht)

60.86

Number of +1ct diamonds

25

Largest Diamond recovered

4.45ct

Percentage gem quality observed

62%

 

Re-processing of the plant tailings at a smaller crusher setting remains to be completed so it is likely that more carats will be recovered from the sample and hence the calculated diamond grade will increase.

 

Kono Project

The Kono project comprises two permits held by Basama Diamonds Limited, a 100% owned Stellar subsidiary. During the years 2006 to 2008 a joint venture with Petra Diamonds Limited sunk a number of exploration shafts to test certain kimberlites in the Kono dyke swarm. The focus was primarily on the Pol-K and Bardu kimberlite shafts where a total of 4,200 carats of diamonds were recovered at diamond grades of approximately 65cpht. However, the grade of the Bardu kimberlite exceeded 140cpht during its final days of sampling. The underground trial mining was placed on care and maintenance during the 2009 financial crisis and in May 2010 Petra exited the joint venture, returning to Stellar its 51% project equity in return for 4.5m Stellar shares at a price of 20p per Stellar share. Expenditure on the Kono project to date exceeds $17m.

 

In accordance with AIM rules the information in this announcement has been reviewed by Karl Smithson, Chief Executive of Stellar, a qualified geologist with 23 years' experience.

 

About Stellar Diamonds plc

Stellar is a London (AIM: STEL) listed diamond mining and exploration company focussed on West Africa where programmes aimed at generating maiden resource estimates at Droujba (Guinea) and Tongo (Sierra Leone) are ongoing and are expected to be delivered in the first quarter of 2012. Bulk sample processing of the Lion-5 dyke at Kono (Sierra Leone) is also ongoing.

 

For further information please contact the following or visit the Company's website at www.stellar-diamonds.com.

 

Stellar Diamonds plc

Karl Smithson, Chief Executive Tel: +44 (0) 20 7257 2930

 

Northland Capital Partners Limited

(Nominated Advisor and Broker)

Gavin Burnell, Edward Hutton Tel: +44 (0) 20 7796 8800

 

Daniel Stewart & Company plc

(Joint Broker)

Martin Lampshire, Antony Legge Tel: +44 (0) 20 7776 6550

 

Pelham Bell Pottinger

James MacFarlane, Joanna Boon Tel: +44 (0) 20 7861 3232

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCTAMLTMBAMBIT
Date   Source Headline
25th May 201212:54 pmRNSHolding(s) in Company
21st May 201212:02 pmRNSReplacement Result of EGM
21st May 201211:37 amRNSResult of EGM
2nd May 201212:30 pmRNSProposed Placing and Capital Reorganisation
12th Apr 20127:00 amRNSKono Licence Dispute
12th Apr 20127:00 amRNSResults from Lion-5 Kimberlite in Kono
2nd Apr 20127:00 amRNSSignificant Maiden Diamond Resource at Droujba
26th Mar 20127:00 amRNSSignificant Maiden Diamond Resource
22nd Feb 20127:00 amRNSDroujba bulk sampling update
6th Feb 20127:00 amRNSKono bulk sampling diamond grade results
31st Jan 20127:00 amRNSInterim Results
19th Jan 20127:00 amRNSTongo resource definition programme update
19th Dec 20117:00 amRNSStellar Diamonds Droujba Microdiamond Results
28th Nov 20117:00 amRNSDroujba Kimberlite Pipe Update
10th Nov 20111:47 pmRNSResult of AGM
18th Oct 20117:00 amRNSDrilling Update
17th Oct 20117:00 amRNSFinal Results
26th Sep 20117:00 amRNSNotice of Results
16th Aug 20117:00 amRNSDrilling underway at Tongo Project in Sierra Leone
10th Aug 20117:00 amRNSAppointment of Mining Consultant
10th Aug 20117:00 amRNSAppointment of Independent Consultant
11th Jul 20117:00 amRNSTongo Kimberlite Dyke Project Update
27th Jun 20117:00 amRNSDroujba Kimberlite Pipe Update
10th Jun 20117:00 amRNSChange of Registered Office Address
31st May 20118:18 amRNSGRANT OF SHARE OPTIONS
26th Apr 20117:00 amRNSDirectors Share Purchases
19th Apr 20117:00 amRNSDroujba Kimberlite Pipe Update
18th Apr 20117:00 amRNSUpdate on Tongo Kimberlite Diamond Project
13th Apr 20117:00 amRNSDroujba Kimberlite Pipe Update
4th Apr 20119:32 amRNSDirectorate Change
1st Apr 20117:00 amRNSChange of Advisor
31st Mar 20117:00 amRNSHolding(s) in Company
31st Mar 20117:00 amRNSHolding(s) in Company
31st Mar 20117:00 amRNSTotal Voting Rights
28th Mar 20111:41 pmRNSResult of General Meeting
15th Mar 20117:00 amRNSUpdate on Bouro Kimberlite Project
10th Mar 20117:00 amRNSProposed Placing to Raise £6.2million
4th Mar 20117:00 amRNSInterim Results
21st Feb 20117:00 amRNSStrategic and Operational Update
15th Feb 20117:00 amRNSUpdate on Tongo Kimberlite Diamond Project
1st Feb 20117:00 amRNSDroujba Kimberlite Pipe Update
17th Jan 20117:00 amRNSDroujba kimberlite Pipe Update
16th Dec 20104:58 pmRNSResult of Annual General Meeting
15th Dec 20107:00 amRNSDrilling Intersects Kimberlite Pipe at Droujba
14th Dec 20107:00 amRNSFinal Results to 30 June 2010
22nd Nov 201012:44 pmRNSHolding(s) in Company
22nd Nov 20107:00 amRNSTongo Kimberlite Diamond Project Update
16th Nov 201010:23 amRNSNotice of Annual General Meeting
15th Nov 20107:00 amRNSDrilling Underway at Droujba Kimberlite Pipe
3rd Nov 20107:00 amRNSChange of Name of Joint Broker

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.