Less Ads, More Data, More Tools Register for FREE

Pin to quick picksStellar Diamonds Regulatory News (STEL)

  • There is currently no data for STEL

Diamond Grades Increased at Tongo Project

14 May 2014 07:00

RNS Number : 0338H
Stellar Diamonds PLC
14 May 2014
 



 

 

 

 

 

 

NOT FOR DISTRIBUTION IN THE UNITED STATES OR FOR DISSEMINATION TO US NEWS WIRE SERVICES.

 

14 May 2014

 

AIM: STEL

Stellar Diamonds plc

("Stellar" or the "Company")

 

Diamond Grades Increased at Tongo Project, Sierra Leone

 

Stellar Diamonds plc, the London listed (AIM: STEL) diamond development company focused on West Africa, is pleased to announce that processing of bulk sample material at its Tongo kimberlite dyke project in Sierra Leone is yielding higher diamond grades than previously reported.

 

Highlights:

· Processing to date has yielded 730 carats for an increased undiluted grade of 134cpht

· High proportion of diamonds classified as gem quality, with stones of up to 6.7 carats

· Grades anticipated to further increase after re-processing of sample material

· 1,000 carat parcel being collected to confirm diamond grade and values

 

Stellar Diamonds Chief Executive Karl Smithson commented, "The on-going bulk sampling continues to yield high grades from the Dyke-1 kimberlite at Tongo. The new average grade of 134cpht is already 12% higher than the previously calculated resource grade of 120cpht, before any reprocessing of the sample material, which we expect will further increase the grade. We anticipate that these increased grades will enhance the project's global resource and economics, where the independent JORC resource currently stands at 1.1milllion carats at a grade of 120 cpht for just one of four kimberlite dykes within the licence area.

 

"The diamond quality at Tongo continues to impress with a high percentage of gem quality stones of up to 6.7 carats in size. We expect to conclude our bulk sampling in June 2014 when a 1,000 carat parcel will be available for diamond value modelling as part of a definitive feasibility study, due for 2015. In the meantime, following our recent fundraise of £1.85 million, we look forward to advancing our Baoulé kimberlite pipe project, located in the prolific diamond region of Aredor in southeast Guinea, to trial mining in 2014."

 

 

 

Dyke-1 Bulk Sampling Progress:

The bulk sample can be broadly divided into sub-samples based on their location on the kimberlite. Samples 7, 8 and 9 were comprised of predominately fresh kimberlite with granite that required drilling and blasting for extraction. However, Sample-10 was collected from an area of the kimberlite that was highly decomposed and was extracted by means of an excavator. Previous results reported during 2014 by the Company have related only to Samples 9 and 10.

 

All sub-samples have been measured in detail in order to calculate the dilution and exact volume of kimberlite extracted. In addition, each sub-sample was independently measured for specific gravity and moisture content in order for the dry tonnage of kimberlite to be calculated. A consequence has been to decrease the previously reported grade for Sample 9 but increase it significantly for Sample 10. The full cumulative results for all the samples processed to date are shown in the table below.

 

Dyke-1 Bulk Sampling Results:

To date a total of 1,271t of kimberlite and country rock have been processed via the DMS plant. This has yielded 730.14 carats of +1mm stones at a diluted grade of 57.44cpht. Taking into account the dilution the actual in-situ kimberlite grade is calculated at 133.85cpht.

 

As can be seen in the table below, results for Sample-10 at 201cpht are higher than other samples and this is attributed to the fact that Sample-10 is heavily decomposed and therefore needs less crushing leading to a higher liberation of diamonds during the processing when compared to the other, harder samples. Re-processing and re-crushing of the harder samples is therefore expected to liberate further diamonds, increasing the average overall grade from 134cpht. Considering that the resource grade was previously calculated at 120cpht the higher grades will have a positive impact on the project resource and economics.

 

Dyke-1

Sample

Diluted Dry Tons

Carats

Diluted +1mm Grade (cpht)

In-Situ Kimberlite Dry Tons

Carats

In-Situ Kimberlite +1mm Grade (cpht)

Number of Diamonds

Diamonds greater than

1-carat

Sample-7

70.53

42.52

60.29

36.37

42.52

116.91

635

2

Sample-8

141.98

74.29

52.32

46.04

74.29

161.35

571

4

Sample-9

542.62

296.67

54.67

305.60

296.67

97.08

2,696

17

Sample-10

515.95

316.66

61.37

157.48

316.66

201.07

2,858

19

Totals

1,271.08

730.14

57.44

545.49

730.14

133.85

6,760

42

 

Note: The figures for Samples-9 and 10 in the above table are not consistent with previously reported results due to a re-calculation of the dry tons processed. The above results are a more accurate estimate of the processed material.

 

Bulk sampling and processing is likely to continue to the end of June 2014 and the Company will continue to report on results at regular intervals.

 

Pictures of the latest Diamonds from the Tongo project can be seen at the following link http://stellar-diamonds.com/operations/photo-gallery/tongo-project/latest-diamonds 

 

About Stellar Diamonds plc:

Stellar is an AIM quoted (AIM: STEL) West African focused diamond development company which is advancing its diamondiferous Baoulé kimberlite in Guinea towards trial mining, as well as progressing the 1.1 million carat Tongo Dyke-1 resource in Sierra Leone through a definitive feasibility study. In addition, Stellar holds the 3 million carat Droujba project in Guinea and continues to pursue both diplomatic and legal channels to ensure the proper reinstatement of its Kono licences in Sierra Leone.

 

** ENDS **

 

For further information contact the following or visit the Company's website at www.stellar-diamonds.com.

 

Karl Smithson, CEO

Philip Knowles, CFO

Stellar Diamonds plc

Stellar Diamonds plc

Tel: +44 (0) 20 7010 7686

Tel: +44 (0) 20 7010 7686

Antony Legge

Colin Rowbury

Daniel Stewart & Company plc (Nomad)

Daniel Stewart & Company plc (Broker)

Tel: +44 (0) 20 7776 6550

Tel: +44 (0) 20 7776 6550

Hugo de Salis

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

Lottie Brocklehurst

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

 

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUOOKRSSAVAAR
Date   Source Headline
25th May 201212:54 pmRNSHolding(s) in Company
21st May 201212:02 pmRNSReplacement Result of EGM
21st May 201211:37 amRNSResult of EGM
2nd May 201212:30 pmRNSProposed Placing and Capital Reorganisation
12th Apr 20127:00 amRNSKono Licence Dispute
12th Apr 20127:00 amRNSResults from Lion-5 Kimberlite in Kono
2nd Apr 20127:00 amRNSSignificant Maiden Diamond Resource at Droujba
26th Mar 20127:00 amRNSSignificant Maiden Diamond Resource
22nd Feb 20127:00 amRNSDroujba bulk sampling update
6th Feb 20127:00 amRNSKono bulk sampling diamond grade results
31st Jan 20127:00 amRNSInterim Results
19th Jan 20127:00 amRNSTongo resource definition programme update
19th Dec 20117:00 amRNSStellar Diamonds Droujba Microdiamond Results
28th Nov 20117:00 amRNSDroujba Kimberlite Pipe Update
10th Nov 20111:47 pmRNSResult of AGM
18th Oct 20117:00 amRNSDrilling Update
17th Oct 20117:00 amRNSFinal Results
26th Sep 20117:00 amRNSNotice of Results
16th Aug 20117:00 amRNSDrilling underway at Tongo Project in Sierra Leone
10th Aug 20117:00 amRNSAppointment of Mining Consultant
10th Aug 20117:00 amRNSAppointment of Independent Consultant
11th Jul 20117:00 amRNSTongo Kimberlite Dyke Project Update
27th Jun 20117:00 amRNSDroujba Kimberlite Pipe Update
10th Jun 20117:00 amRNSChange of Registered Office Address
31st May 20118:18 amRNSGRANT OF SHARE OPTIONS
26th Apr 20117:00 amRNSDirectors Share Purchases
19th Apr 20117:00 amRNSDroujba Kimberlite Pipe Update
18th Apr 20117:00 amRNSUpdate on Tongo Kimberlite Diamond Project
13th Apr 20117:00 amRNSDroujba Kimberlite Pipe Update
4th Apr 20119:32 amRNSDirectorate Change
1st Apr 20117:00 amRNSChange of Advisor
31st Mar 20117:00 amRNSHolding(s) in Company
31st Mar 20117:00 amRNSHolding(s) in Company
31st Mar 20117:00 amRNSTotal Voting Rights
28th Mar 20111:41 pmRNSResult of General Meeting
15th Mar 20117:00 amRNSUpdate on Bouro Kimberlite Project
10th Mar 20117:00 amRNSProposed Placing to Raise £6.2million
4th Mar 20117:00 amRNSInterim Results
21st Feb 20117:00 amRNSStrategic and Operational Update
15th Feb 20117:00 amRNSUpdate on Tongo Kimberlite Diamond Project
1st Feb 20117:00 amRNSDroujba Kimberlite Pipe Update
17th Jan 20117:00 amRNSDroujba kimberlite Pipe Update
16th Dec 20104:58 pmRNSResult of Annual General Meeting
15th Dec 20107:00 amRNSDrilling Intersects Kimberlite Pipe at Droujba
14th Dec 20107:00 amRNSFinal Results to 30 June 2010
22nd Nov 201012:44 pmRNSHolding(s) in Company
22nd Nov 20107:00 amRNSTongo Kimberlite Diamond Project Update
16th Nov 201010:23 amRNSNotice of Annual General Meeting
15th Nov 20107:00 amRNSDrilling Underway at Droujba Kimberlite Pipe
3rd Nov 20107:00 amRNSChange of Name of Joint Broker

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.