Less Ads, More Data, More Tools Register for FREE

Pin to quick picksStellar Diamonds Regulatory News (STEL)

  • There is currently no data for STEL

AGM Statement

29 Nov 2007 07:00

West African Diamonds PLC29 November 2007 WEST AFRICAN DIAMONDS PLC 29th November 2007 AGM STATEMENT At the AGM to be held later today, Chairman John Teeling will cover thefollowing information: Pilot gold production has commenced on Plant 11 tailings deposit Full scale diamond and gold production expected to commence within thenext 4-6 weeks Expansion of the kimberlite Pipe 3 in Sierra Leone and discovery of asatellite kimberlite. Four large stones recovered from the Bomboko alluvial deposit inGuinea. Gold exploration to commence on a greenstone belt in Sierra Leoneduring the current dry season. Acquisition of Fastrack assets and appointment of Hennie Wessels asChief Operating Officer ('COO') has accelerated WAD's development. West African Diamonds plc ('WAD') is a diamond exploration and developmentcompany focused on Sierra Leone and Guinea. WAD has an exciting portfolio ofprojects, ranging from pilot production to early stage exploration - givinginvestors access to the full range of the resource value chain. . Plant 11, Koidu, Sierra Leone (60% WAD): Pilot gold production has now startedon this large approximately 7M tonne plus undersize tailings deposit. Thisprocess which has already produced gold is designed to fully test the plant,before moving to full diamond and gold production within the next 4-6 weeks.Contracts have already been arranged for the sale of both gold and diamonds oncefull scale production commences. Outstanding progress has been made on this project. In less than 12 months aplant has been designed and constructed in South Africa, transported to Koiduand assembled. The plant is currently in the final stages of commissioning,with pilot gold production currently underway. Full throughput of 150 tonnesper hour is expected before the end of the year. Output is expected to beapproximately 0.4g/tonne gold worth $9 a tonne of ore and diamonds worth $3 atonne of ore. The acquisition of Fastrack assets in Sierra Leone in July 2007greatly facilitated the development of Plant 11. In addition to equipment, WADwas able to acquire the services of Hennie Wessels, an experienced West Africanhand. He is bringing the project rapidly on stream. Bomboko Alluvials, Guinea (100% WAD): Four large diamonds (9.2, 4.5, 4.2 and 3.8carats) have recently been recovered from the continuing bulk sampling of thisestimated 750,000 carat alluvial diamond deposit. The Board intends to beginsmall-scale mining on the Bomboko in early 2008. Pipe 3, Sierra Leone (100% WAD): From a kimberlite pipe with very limitedeconomic value, WAD has increased the recoverable grade almost fourfold by theapplication of modern Dense Media Separation ('DMS') technology and appropriateprocess controls. Further, a recent geophysical survey has postulated adoubling of the size of the available kimberlite, with the discovery of asatellite kimberlite very close by to Pipe 3. Approximate calculations suggesta target mineable deposit of 350,000 tonnes grading up to 19 carats per hundredtonnes and in excess of USD228 per carat. Economic options are currently beingassessed. Droujba, Guinea (100% WAD): This is an area of Guinea well known for diamondscontained in alluvials, kimberlite dykes and pipes. WAD obtained a licence overthe area in April 2007 and has reviewed all available data. There issignificant short term potential in the alluvials, while the geology andeconomics of the kimberlite dykes and pipes need to be assessed. Significantexploration resources will be devoted to this area in the coming year, startingwith a comprehensive ground geophysical survey which is an advanced state ofplanning. Exploration, Nimini Hills Sierra Leone (100% WAD): Early reconnaissance samplingfor gold in the Nimini Hills of Sierra Leone included encouraging results of 63and 73g/tonne. Detailed follow-up sampling has been planned in an attempt todiscover shear hosted hydrothermal gold mineralized systems. Finance: A limited amount of new funding was raised at listing followed by a£846,000 placing in September 2007. These funds are adequate to bring Plant 11into production, to upgrade mining at Bomboko, to bring Pipe 3 to a feasibilitydecision and to conduct our ongoing exploration. Contracts for the sale ofdiamonds and gold from Plant 11 have been signed. Revenue should emerge in Q12008. Future: We believe that WAD has significant potential. The company will be adiamond and gold producer with a portfolio of projects spanning the fulldevelopment horizon: from early stage exploration to production and sales.There is an experienced team in place, more than capable of developing theportfolio. We are constantly evaluating new projects in diamonds and in metals, not only inWest Africa but elsewhere in Africa, as we are always looking to add value toour portfolio; through acquisition and by monetizing our asset base throughdevelopment. We are well on the way toward realising the potential of ourassets. This release has been approved by Alex van Zyl, Technical Director, West AfricanDiamonds. Alex van Zyl (B.Sc. Stellenbosch, B.Sc. Hons. Pretoria) spent a longcareer in Anglo American in the diamond division, ending up 1990 to 1997 withworldwide responsibility for diamond exploration and evaluation. He was aconsultant to De Beers from 1997 to 2002. Enquiries: West African DiamondsJohn Teeling, Chairman +353 1 8332833James Campbell, Deputy Chairman +27 83 457 3724 Blue Oar Securities PlcJohn Wakefield +44 (0) 117 933 0020 College HillPaddy Blewer +44 (0) 20 7457 2020Nick Elwes +44 (0) 20 7457 2020 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
25th May 201212:54 pmRNSHolding(s) in Company
21st May 201212:02 pmRNSReplacement Result of EGM
21st May 201211:37 amRNSResult of EGM
2nd May 201212:30 pmRNSProposed Placing and Capital Reorganisation
12th Apr 20127:00 amRNSKono Licence Dispute
12th Apr 20127:00 amRNSResults from Lion-5 Kimberlite in Kono
2nd Apr 20127:00 amRNSSignificant Maiden Diamond Resource at Droujba
26th Mar 20127:00 amRNSSignificant Maiden Diamond Resource
22nd Feb 20127:00 amRNSDroujba bulk sampling update
6th Feb 20127:00 amRNSKono bulk sampling diamond grade results
31st Jan 20127:00 amRNSInterim Results
19th Jan 20127:00 amRNSTongo resource definition programme update
19th Dec 20117:00 amRNSStellar Diamonds Droujba Microdiamond Results
28th Nov 20117:00 amRNSDroujba Kimberlite Pipe Update
10th Nov 20111:47 pmRNSResult of AGM
18th Oct 20117:00 amRNSDrilling Update
17th Oct 20117:00 amRNSFinal Results
26th Sep 20117:00 amRNSNotice of Results
16th Aug 20117:00 amRNSDrilling underway at Tongo Project in Sierra Leone
10th Aug 20117:00 amRNSAppointment of Mining Consultant
10th Aug 20117:00 amRNSAppointment of Independent Consultant
11th Jul 20117:00 amRNSTongo Kimberlite Dyke Project Update
27th Jun 20117:00 amRNSDroujba Kimberlite Pipe Update
10th Jun 20117:00 amRNSChange of Registered Office Address
31st May 20118:18 amRNSGRANT OF SHARE OPTIONS
26th Apr 20117:00 amRNSDirectors Share Purchases
19th Apr 20117:00 amRNSDroujba Kimberlite Pipe Update
18th Apr 20117:00 amRNSUpdate on Tongo Kimberlite Diamond Project
13th Apr 20117:00 amRNSDroujba Kimberlite Pipe Update
4th Apr 20119:32 amRNSDirectorate Change
1st Apr 20117:00 amRNSChange of Advisor
31st Mar 20117:00 amRNSHolding(s) in Company
31st Mar 20117:00 amRNSHolding(s) in Company
31st Mar 20117:00 amRNSTotal Voting Rights
28th Mar 20111:41 pmRNSResult of General Meeting
15th Mar 20117:00 amRNSUpdate on Bouro Kimberlite Project
10th Mar 20117:00 amRNSProposed Placing to Raise £6.2million
4th Mar 20117:00 amRNSInterim Results
21st Feb 20117:00 amRNSStrategic and Operational Update
15th Feb 20117:00 amRNSUpdate on Tongo Kimberlite Diamond Project
1st Feb 20117:00 amRNSDroujba Kimberlite Pipe Update
17th Jan 20117:00 amRNSDroujba kimberlite Pipe Update
16th Dec 20104:58 pmRNSResult of Annual General Meeting
15th Dec 20107:00 amRNSDrilling Intersects Kimberlite Pipe at Droujba
14th Dec 20107:00 amRNSFinal Results to 30 June 2010
22nd Nov 201012:44 pmRNSHolding(s) in Company
22nd Nov 20107:00 amRNSTongo Kimberlite Diamond Project Update
16th Nov 201010:23 amRNSNotice of Annual General Meeting
15th Nov 20107:00 amRNSDrilling Underway at Droujba Kimberlite Pipe
3rd Nov 20107:00 amRNSChange of Name of Joint Broker

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.