Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSunrise Resources PLC Regulatory News (SRES)

Share Price Information for Sunrise Resources PLC (SRES)

Share Price is delayed by 15 minutes
Get Live Data
0.023    0.00 (0.00%)
Bid:
0.021
Ask:
0.025
Spread: 0.004 (19.048%)
Market Cap: £2.16m
SRES Live PriceLast checked at - London Stock Exchange

Intraday Sunrise Resources PLC Share Chart

Study Update - Derryginagh Barite Project

1 Nov 2012 07:00

RNS Number : 0179Q
Sunrise Resources Plc
01 November 2012
 

 

SUNRISE RESOURCES PLC

 

1 November 2012 

 

 

STUDY UPDATE - DERRYGINAGH BARITE PROJECT

 

 

Sunrise Resources plc ("Sunrise" or "the Company"), the AIM-quoted diversified mineral exploration and development specialist, wishes to advise the results from its scoping study ("the Study") for its Derryginagh barite project in Ireland ("the Project").

 

The Study, completed by Wardell Armstrong International Ltd ("WAI"), shows that a significant increase in the tonnage of defined mineralisation is required to demonstrate financial viability based on current cost estimates and product pricing assumptions - but also concludes that the mineralisation is open to expansion and recommends a programme of drilling and further metallurgical testwork be undertaken.

 

Patrick Cheetham, Executive Chairman of the Company, commented today: "In all scenarios considered by the Study, the Project shows good operating costs margins but the Project has moved away from the original low capital cost concept as metallurgical testwork results dictated a more complex plant design than originally envisaged. In addition tonnage estimates are necessarily constrained by the drilling carried out so far.

 

"Overall the Study shows that we have some way to go before we have a project that will provide a satisfactory return on capital employed under the Study models. There is, however, an opportunity to simplify the metallurgical process, expand the deposit and position the project such that revenues are increased relative to capital and operating costs. We will now step up our discussions with potential customers and industry partners to ensure that the beneficiation plan for the Project will optimise the potential revenues for this increasingly scarce commodity and reflect these in a further evaluation of the Project."

 

 

Further information:

 

Sunrise Resources plc Tel: +44 (0)845 868 4590

Patrick Cheetham, Executive Chairman

 

Northland Capital Partners Limited Tel: +44 (0)20 7796 8800

Gavin Burnell / Edward Hutton

Alice Lane /John-Henry Wicks (Broking)

 

Yellow Jersey PR Limited Tel: +44 (0)7768 537 739

Dominic Barretto

 

 

 

 

 

 

 

 

The Project

 

The Derryginagh barite project is located near Bantry, County Cork, in the south-west of the Irish Republic. White barite was produced from Derryginagh intermittently in the period 1864-1922 and drilling (four holes) was carried out by Dresser Minerals in the 1980s.

 

The Company is targeting the Derryginagh barite deposit for the production of high value white "paint-grade" barite for use as mineral filler in paints and plastics. An initial drilling programme was carried out by the Company in 2011 and this, together with a programme of metallurgical testwork, forms the basis for the Study.

 

Mineral Resource Estimation

 

WAI carried out geological modelling of the historic and recent Company drill data and, for the purpose of the Study, derived a base-case tonnage-grade estimate of 394,000 tonnes grading 81% barite by block modelling using vein outline wireframes provided by the Company and grade estimation by the Inverse Distance Weighting estimation method.

 

This tonnage-grade estimate was not classified by WAI according to 1JORC standards as QA/QC data was not available for the Dresser drill holes and there is some uncertainty over the exact locations of these holes. Otherwise the data would have supported estimation of an Inferred Mineral Resource under JORC guidelines.

 

Mining

 

The Study considered mine production rates of between 50,000 (base case) and 90,000 tonnes per annum corresponding to product output rates of 27,600 - 48,000 tonnes per annum of white barite concentrate. 

 

After allowances for sterilisation around old mine workings, mine pillars and mine dilution the base-case tonnage grade estimate supports total mine production of 278,340 tonnes at 67% barite.

 

The mining methods suggested for the Derryginagh mineralisation are a combination of Alimak stoping and longitudinal retreat stoping, with ore being hauled to surface via a decline located to the north of the deposit. The base-case mine life is six years.

 

Mining capital and operating costs were estimated for both owner operated and contract mining scenarios.

 

Mineral Processing

 

The Study considered processing of the ore by means of gravity methods. The process selection includes crushing, ball milling, desliming and size classification and gravity beneficiation using a combination of spirals, shaking tables and multi gravity separators. The final concentrate grade was estimated at 98.5% barite with both coarse (50-500 microns, 80% of total) and a fine (less than 50 microns, 20% of total) concentrates produced.

 

 

Project Opportunities

 

·; WAI considers that the available geological information at this stage does not fully reflect the perceived potential of the Derryginagh project as the deposit is open down dip and further drilling may increase the Mineral Resource base sufficiently to support an extended life of the mine and enhanced project economics.

 

·; The current mineral processing flow-sheet is more complex than originally envisaged as metallurgical testwork has not performed according to mineralogical predictions. There is an opportunity to improve and simplify the process plant design with potential benefits to capital and operating costs.

 

·; The revenue assumptions may be conservative. An opportunity exists to achieve substantially higher sales price by fine grinding the barite product. The additional capital and operating costs involved need to be fully evaluated.

 

 

Footnotes

 

1. JORC is the Australian Code for the reporting of exploration results, Mineral Resources and Ore Reserves prepared by the Joint Ores Reserves Committee (JORC) of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and the Minerals Council of Australia.

 

2. The technical economic evaluation presented in the Study is not based on any JORC compliant Mineral Resource classification and should be considered preliminary in nature. There is no certainty that the economic forecast will be realised. Capital and operating costs are also preliminary in nature and may vary once further metallurgical testwork is undertaken and quotations from suppliers are received.

 

3. The information in this release has been compiled and reviewed by Mr Richard Clemmey (B.Sc. Hons, CEng, MIQ, MIMMM, ARSM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Clemmey is a Chartered Engineer and a member of the Institute of Materials, Minerals and Mining.

 

 

Notes to Editors

 

About Sunrise Resources plc

 

Sunrise Resources plc is a diversified mineral exploration and development specialist.

 

The Company's objective is to develop profitable mining operations to sustain the Company's wider exploration efforts and create value for shareholders through the discovery of world-class deposits.

 

The Company is evaluating a product opportunity for white barite in south-west Ireland and diamond exploration interests in Western Australia & Finland.

Shares in the Company trade on AIM under the symbol "SRES".

 

www.sunriseresourcesplc.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCWGGAWUUPPGQG
Date   Source Headline
16th Nov 20167:00 amRNSIssue of New Ordinary Shares & Total Voting Rights
14th Nov 201610:11 amRNSPozz Project Expansion
9th Nov 201611:00 amRNSNew staking, Ridge Limestone Project
8th Nov 20162:00 pmRNSUpdate on Bay State Silver Project
24th Oct 20167:00 amRNSBay State Sampling & Drilling Results
19th Sep 20167:00 amRNSStrategy and Business Overview
31st Aug 20169:15 amRNSTotal Voting Rights
30th Aug 20162:00 pmRNSBay State Silver Project - Drill Start
15th Aug 20167:00 amRNSNevada Industrial Minerals Projects - Update
5th Aug 20162:00 pmRNSIssue of Equity
3rd Aug 20169:30 amRNSBay State Silver Project Drill Programme
27th Jul 20162:00 pmRNSProject Updates
26th Jul 20169:07 amRNSGarfield Copper-Gold Project - Update
19th Jul 20167:00 amRNSNewark Gold Project, update
13th Jul 201612:16 pmRNSHolding(s) in Company
7th Jul 20169:51 amRNSClayton Silver-Gold Project, Update
14th Jun 201611:34 amRNSHolding(s) in Company
26th May 20165:27 pmRNSHolding(s) in Company
26th May 20167:00 amRNSStrategic Financing for Precious Metal Exploration
23rd May 20167:00 amRNSHalf-Yearly Report
19th May 20167:00 amRNSNew US subsidiary and projects
12th May 20167:00 amRNSIssue of Equity
10th May 20167:00 amRNSDirectorate Change
29th Apr 201611:00 amRNSTotal Voting Rights
12th Apr 201612:52 pmRNSHolding(s) in Company
12th Apr 201611:48 amRNSHolding(s) in Company
7th Apr 20167:00 amRNSProject Update
4th Apr 20167:00 amRNSPlacing, Subscription & Total Voting Rights
31st Mar 20164:29 pmRNSTotal Voting Rights
18th Mar 20161:40 pmRNSDirector's Dealing
14th Mar 20162:48 pmRNSAppointment of Joint Broker
8th Mar 201611:00 amRNSIssue of New Ordinary Shares & Total Voting Rights
8th Mar 201611:00 amRNSIssue of Equity by Sunrise Resources PLC
3rd Mar 201610:30 amRNSInterest in Goldcrest Resources PLC
19th Feb 20161:15 pmRNSShare and warrant issue and total voting rights
18th Feb 201612:20 pmRNSResult of AGM
12th Jan 20167:00 amRNSAnnual Report and Accounts and Notice of AGM
7th Jan 20167:00 amRNSDirector share purchase
30th Dec 20152:00 pmRNSDirector share purchase
14th Dec 20157:00 amRNSFinal Results
7th Dec 20157:00 amRNSNew Industrial Minerals Project
3rd Dec 201510:51 amRNSUpdated Presentation on Website
3rd Dec 20157:00 amRNSAgreement - County Line Diatomite Project
20th Nov 20157:00 amRNSComment on share price movement
22nd Oct 20157:00 amRNSBay State Silver Project High-grade drill results
9th Sep 201510:00 amRNSUpdate-Bay State Project Drill Programme
26th Aug 20152:00 pmRNSBay State Project Drill Start Confirmed
19th Aug 20157:00 amRNSBay State Project Drill Start
3rd Aug 20157:00 amRNSBay State Silver Drill Permit
30th Jul 20151:00 pmRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.