Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSunrise Resources PLC Regulatory News (SRES)

Share Price Information for Sunrise Resources PLC (SRES)

Share Price is delayed by 15 minutes
Get Live Data
0.0175    0.00 (0.00%)
Bid:
0.015
Ask:
0.02
Spread: 0.005 (33.333%)
Market Cap: £1.64m
SRES Live PriceLast checked at - London Stock Exchange

Intraday Sunrise Resources PLC Share Chart

Derryginagh Drill Update

11 Aug 2011 11:42

RNS Number : 1997M
Sunrise Resources Plc
11 August 2011
Β 

ο»Ώ

Β 

Β 

11 August 2011

Β 

Β 

DRILLING UPDATE - DERRYGINAGH BARITE PROJECT

Β 

Sunrise Resources plc ("the Company"), the AIM-quoted diversified mineral exploration and development specialist, wishes to advise that drilling progress at its Derryginagh Barite Project in south-west Ireland has been unacceptably slow and that, consequently, it has today terminated the current drilling contract.

Β 

Details of the programme were advised in a news release dated 6 July when drilling commenced. The Company hopes to secure an alternative contractor shortly to complete the drilling and will make a further announcement when drilling is scheduled to recommence. The Board of the Company strives to manage costs very carefully and whilst there will be a few weeks delay to the programme the cost implications of this are nominal.

Β 

Β 

Β 

Further information:

Β 

Sunrise Resources plc Tel: +44 (0) 845 868 4590

Patrick Cheetham, Executive Chairman Mobile: +44 (0)7767 458751

Β 

Northland Capital Partners Limited Tel: +44 (0)20 7796 8800

Gavin Burnell / Rod Venables

Charles Vaughan (Sales)

Β 

Yellow Jersey PR Limited Mobile: +44 (0)7768 537 739

Dominic Barretto

Β 

Β 

Notes to Editors:

Β 

About Derryginagh Barite Project

The concept for Derryginagh is for a modest-sized underground mining operation feeding a low cost gravity separation plant producing high-value filler grade barite.

Β 

Barite is the mineral form of the chemical barium sulphate. It is an environmentally friendly, non-toxic natural product. It is chemically and physically unreactive, has a high specific gravity, and low oil adsorption. It also has good sound-deadening and radiation-shielding properties. These properties make barite suitable for use as a weighting agent in oil industry drilling muds and as higher value industrial filler in, for example, paint plastics, brake linings and acoustic panels.

Β 

The Derryginagh mine was worked in the period 1864-1922, supplying white barite to the local paint industry. The mine workings extend over a strike length of 200m and to a maximum depth of 60m. In the 1980s four holes drilled by Dresser Minerals International Inc. intersected the barite vein over an average true width of 2.4m at about 100m below surface and over a total strike length of 200m, with the vein being open along strike and at depth.

Β 

There is a significant demand for white paint-grade barite in Europe but no major mine supply outside of China and India. Consequently there is a niche opportunity for a new European supplier as China's own internal demand limits traditional exports. The price currently quoted for white paint grade barite is Β£195-220/tonne delivered in the UK.

Β 

About Sunrise Resources

Sunrise Resources plc was formed to acquire the diamond exploration interests of Tertiary Minerals plc in 2005. Since then the Company has made a number of new kimberlite discoveries in Finland and expanded its portfolio of diamond exploration interests to include a new project near Cue in Western Australia.

Β 

In 2009 the Company made a strategic decision to diversify its project interests. It believes that the Derryginagh Project has the potential for a modest scale mining operating that could, in time, produce a valuable cash flow for the Company.

Β 

In May 2010, the Company secured an option agreement for the Long Lake Gold-Nickel-Copper-PGM project 20km south-west of the City of Sudbury, Ontario (Canada). The Long Lake Gold Mine produced 57,000 ounces of gold from over 200,000 tonnes of ore mined in the periods 1910-1916 and 1932-1939 and has considerable untested gold potential. The claims also cover potential extensions to the currently producing Copper Cliff dyke system at the heart of the world's most productive nickel-copper mining complex.

Β 

Various maps and images illustrating some of the features discussed in this release are available on the Company's website at:

Β 

http://www.sunriseresourcesplc.com

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLUASRRARAWAAR
Date   Source Headline
30th Aug 20137:00 amRNSTotal Voting Rights
7th Aug 20138:00 amRNSAdmission to trading and Total Voting Rights
1st Aug 201312:14 pmRNSIssue of Equity
25th Jul 20137:00 amRNSNew gold projects and Cue Diamond project update
15th May 201311:53 amRNSHalf Yearly Report
25th Mar 20137:00 amRNSPositive Diamond Results
19th Feb 20133:39 pmRNSResult of AGM
18th Feb 20137:00 amRNSCue Diamond Project Update
29th Jan 20131:13 pmRNSUpdate re drilling results
22nd Jan 20137:00 amRNSCue Diamond Sampling Results
4th Jan 20137:00 amRNSDirector Share Purchase & Issue of Equity
20th Dec 20127:00 amRNSGrant of warrants
12th Dec 20121:30 pmRNSFinal Results
3rd Dec 20127:00 amRNSCue Diamond Project - new Kimberlite Occurrences
12th Nov 20127:00 amRNSEquity Finance Facility Warrants Pricing
1st Nov 20127:00 amRNSStudy Update - Derryginagh Barite Project
25th Oct 20127:00 amRNS£3m Equity Finance Facility Secured
23rd Oct 20127:00 amRNSCue 1 Kimberlite confirmed diamondiferous
22nd Oct 20127:00 amRNSResponse to Press Comment & Market Update
25th Sep 20127:00 amRNSDerryginagh Project Update
6th Sep 20127:00 amRNSCue Project Update
31st Aug 20129:15 amRNSHolding(s) in Company
21st Aug 20127:00 amRNSProject Update
30th Jul 20124:48 pmRNSIssue of Equity
31st May 20127:00 amRNSDirectorate Change
30th May 20127:00 amRNSDerryginagh Project Update
18th May 20127:00 amRNSHalf Yearly Report
26th Apr 20127:00 amRNSProject Updates
27th Feb 201212:20 pmRNSIssue of Shares and Warrants
24th Feb 20123:29 pmRNSResult of AGM
16th Feb 20127:00 amRNSPlacing to raise £600,000
6th Feb 20127:00 amRNSDrilling Results, Derryginagh Drilling Project
16th Jan 20127:00 amRNSAnnual Report & Accounts
12th Jan 20127:00 amRNSDrilling Program Completed
15th Dec 20117:00 amRNSFinal Results
19th Sep 20117:00 amRNSNew Derryginagh Drill Contract
13th Sep 201110:29 amRNSDrill & Sampling Results - Long Lake Gold Project
31st Aug 20115:04 pmRNSTotal Voting Rights
11th Aug 201111:42 amRNSDerryginagh Drill Update
5th Aug 20113:09 pmRNSCorrection - Directors Share Issue
4th Aug 20119:58 amRNSDirectors Share Issue
6th Jul 20117:00 amRNSDerryginagh Barite Drill Start
5th Jul 20117:00 amRNSLong Lake Drill Start 5 July 2011
14th Jun 20117:00 amRNSDrill Contract, Long Lake Gold Project
3rd Jun 20117:00 amRNSIssue of Equity
23rd May 20117:00 amRNSHalf Yearly Report
19th May 20117:00 amRNSPositive Concept Study
27th Apr 20117:00 amRNSLong Lake Option
21st Mar 20117:00 amRNSExploration Update
3rd Mar 20119:02 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.