The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSerabi Regulatory News (SRB)

Share Price Information for Serabi (SRB)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 62.00
Bid: 61.00
Ask: 62.00
Change: 0.00 (0.00%)
Spread: 1.00 (1.639%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 62.00
SRB Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Resource Update

14 Feb 2006 08:00

Serabi Mining plc14 February 2006 SERABI MINING PLC REPORTS 74% INCREASE IN GLOBAL RESOURCES TO 825,900 OUNCESGOLD EQUIVALENT • Total contained gold equivalent ounces at Palito increased by 74% to 825,900 ounces • Improved quality as Indicated Resources comprise 90% of total resources, up from 12% a year ago • Strike length and depth of mineralisation continue to increase and remain open in all directions • Improved mine economics as gold equivalent ounces per vertical metre increase by 50% • Low discovery cost of approximately US$4 per ounce Serabi Mining plc ("Serabi" or the "Company") reports the results of itsresource estimate review as at 31 December, 2005 for the Palito Main Zone.Resource modeling and grade estimation was recently completed to JORC (2004)guidelines by independent resource consultants Hellman & Schofield Pty Ltd. The Palito Main Zone resource has been estimated from 200 diamond drill holescompleted prior to the end of December 2005 (a total of 26,886 metres), as wellas from extensive channel sample data obtained from the underground workings.Full details of the drill results included in the resource estimation werereported in the Company's press releases dated 9 September, 2005 and 1 February,2006 and can be viewed at the Company's website www.serabimining.com. The resource estimate now extends to a maximum depth of 0 mRL, an increase ofapproximately 100 metres in depth compared to a year ago. In addition, thestrike length has increased from 900 metres to 1,050 metres. Due to thehigh-grade nature of the mineralisation, a top cut of 200 g/t gold and 10%copper was applied to the estimate. The resources at 0.0 g/t, 2.0 g/t and 5.0 g/t cut-off grades are reported belowand represent a 74%, 64% and 48% increase in contained gold equivalent ouncesover the December 2004 estimate, respectively: Table 1: Palito Main Zone Resources(1,2) (December 2005) Cut-off Category Tonnes Gold Grade Copper Grade Contained Au Contained Cu Contained AuEqGrade (g/t) (g/t) (%) (ozs) (tonnes) (ozs) 0.0 Indicated 3,857,000 5.27 0.25 653,100 9,560 739,200 Inferred 779,000 3.20 0.08 81,000 620 86,700 Total 4,636,000 4.93 0.22 734,100 10,180 825,900 2.0 Indicated 2,081,000 9.08 0.39 607,300 8,200 681,200 Inferred 187,000 12.00 0.16 72,300 290 74,900 Total 2,268,000 9.32 0.37 679,600 8,490 756,100 5.0 Indicated 1,089,000 14.41 0.59 504,700 6,400 562,400 Inferred 108,000 18.50 0.16 64,300 170 65,900 Total 1,197,000 14.79 0.55 569,000 6,570 628,300 (1) Gold equivalent ounces are based on US$550 per ounce gold and US$2.25 perpound copper; figures have been rounded (2) Resource has been depleted for mining activity from commencement, comprising81,053 tonnes for 21,843 ounces of gold and 693,600 pounds of copper With the significant amount of step-out drilling that took place along thePalito Main Zone during 2005, Serabi has continued to discover new, parallelorebodies. As a result, there are now a total of 54 individual veins which havebeen included in the resource, compared to 20 individual veins a year earlier.Taking into account relevant exploration expenditures, the revised globalresource estimate implies a discovery cost for 2005 of approximately US$4 perounce, which Serabi believes to be very competitive within the industry.Furthermore, as a result of the amount of infill drilling which was completed in2005, there has been a substantial improvement in the quality of the resources,with Indicated Resources now comprising 90% of the resource ounces (up from 12%a year ago). Importantly, the amount of gold equivalent ounces per vertical metre hasincreased substantially. Within the main section of the resource, between 150mRL and 240 mRL elevation, the number of gold equivalent ounces has increased50% over the December 2004 resource estimate to an average of 5,500 goldequivalent ounces per vertical metre over the strike length of the Palito MainZone. The potential economic impact of this increase is significant as more goldwill now be accessible from each level of mine development at the Palitooperation. While at a zero cut-off grade the overall grade of the resource has declined,this is a result of a combination of the inclusion of newly identified, butlower-grade mineralised zones and changes in core sampling procedures. Ratherthan sampling only the main, central area of mineralisation, the Company nowassays the entire mineralised and associated alteration zones, which ofteninclude lower-grade sections around the central higher-grade areas. This hasresulted in higher tonnage with a coincident reduction in grade. At the time of the Company's IPO in May 2005, initial production and mineplanning at Palito was based on a 5.0 g/t gold cut-off grade. This cut-off gradewas based on the projected cost profile for the relatively labour intensiveshrinkage stoping mining method. Following the introduction of mechanisedmining, longhole stoping and other cost and efficiency measures currentlyunderway, this cut-off grade should decline thus enabling a greater proportionof lower-grade material to be incorporated into the long-term mine plan. Commenting on the updated resource estimate, Graham Roberts, Chairman of Serabisaid, "This resource estimate illustrates the potential for the Palito Gold Mine togrow into a long-life, low cost gold producer in the Tapajos Region of Brazil.While we have now significantly extended the resource along strike and at depth,mineralisation continues to remain open in all directions. Furthermore,although the increase in the resource is impressive, the improvement in thequality of the resource is equally as important to the future economics of thePalito operation. Serabi will continue to test the extent of the deposit duringthe course of 2006 with the objective of further increasing total resourceounces. We also note that this resource estimate is based on the Palito Main Zone only,and does not take into consideration adjacent areas such as Palito West, Chicodo Santo and the newly discovered Bill's Pipe where drilling has alsoencountered high-grade gold-copper intersections. During the course of 2006, thecompany will work towards bringing these and other satellite orebodies withinthe Jardim do Ouro District into the resource base." Enquiries: Serabi Mining plc Graham Roberts Tel: 020 7220 9550Chairman Mobile: 07768 902 475 Clive Line Tel: 020 7220 9553Finance Director Mobile: 07710 151 692 Chris Sattler Tel: 020 7220 9552Investor Relation Mobile: 07717 748 275 E-mail: contact@serabimining.comWebsite: www.serabimining.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
26th Feb 20204:30 pmGNWResult of General Meeting
18th Feb 20207:00 amGNWCorporate Presentation and update
10th Feb 20207:00 amGNWCoringa Project Public Hearing and Palito ore sorter commissioning update
22nd Jan 20207:00 amGNWConditional subscription by Greenstone Resources II LP (“Greenstone”) for US$12 million Convertible Loan Notes, Approval of a waiver of an obligation under Rule 9 of the City Code on Takeovers and Mergers and Notice of General Meeting
14th Jan 20207:00 amGNWSerabi reports highest quarter gold production for 2019, and exceeds 40,000 ounces annual gold production for the first time
6th Jan 20202:05 pmRNSSecond Price Monitoring Extn
6th Jan 20202:00 pmRNSPrice Monitoring Extension
6th Jan 20207:00 amGNWStep out drilling at Sao Chico significantly extends resource beyond current mine limits
23rd Dec 20197:00 amGNWCorporate Update
16th Dec 20197:00 amGNWChange of Business Address
11th Nov 20197:00 amGNWUnaudited 3rd Quarter Results and Management Discussion and Analysis
21st Oct 20194:00 pmGNWSerabi Announces Filing of Technical Report for the Coringa Gold Project Preliminary Economic Assessment
14th Oct 20197:00 amGNWSerabi reports highest quarterly production for 2019
13th Sep 20197:00 amGNWPresentation to the Precious Metals Conference 12 September 2019
6th Sep 20197:00 amGNWCoringa PEA Confirms Positive Economics
14th Aug 20197:00 amGNWUnaudited Interim Financial Results for the three and six month periods to 30 June 2019 and Management’s Discussion and Analysis
5th Aug 20192:06 pmRNSSecond Price Monitoring Extn
5th Aug 20192:00 pmRNSPrice Monitoring Extension
5th Aug 20191:30 pmGNWUpdate on timing of Preliminary Economic Assessment for the Coringa Gold Project
23rd Jul 20192:35 pmGNWMike Hodgson, CEO of Serabi interviewed by BRR Media
22nd Jul 20197:00 amGNWSerabi maintains production guidance following successful second quarter
20th Jun 20197:00 amGNWFinal Exploration Results for Coringa ahead of Preliminary Economic Assessment
17th Jun 20197:00 amGNWAGM - Results of Shareholder Voting
14th Jun 20193:00 pmGNWChief Executive's AGM Statement to Shareholders
31st May 20197:00 amGNWDisclosure on Tailings Management Facilities
17th May 20197:00 amGNWNotice of Annual General Meeting
15th May 20197:00 amGNW1st Quarter Results
1st May 20197:00 amGNWTotal voting rights
1st May 20197:00 amGNWHolding(s) in Company
30th Apr 20192:45 pmGNWHolding(s) in Company
29th Apr 20199:15 amGNWHolding(s) in Company
18th Apr 20193:00 pmGNWFiling of NI 43-101 compliant Technical Report for the Coringa Gold Project
15th Apr 20197:00 amGNWA strong start with over 10,000 ounces produced in the first quarter of 2019
29th Mar 20197:00 amGNWAudited Results for the year ended 31 December 2018
28th Mar 20197:01 amGNWHolding(s) in Company - TR1 Notification
28th Mar 20197:00 amGNWHolding(s) in Company - TR1 Notification
4th Mar 20197:00 amGNWMiscellaneous
13th Feb 20197:00 amGNWOperational and Business Update
12th Feb 20197:00 amGNWAccident at Palito Mine
30th Jan 20197:00 amGNWSignificant increase in strike extensions with multiple high grade intersections into the Serra, Meio and Galena veins at Coringa
17th Jan 20197:00 amGNWRecord quarterly gold production for the fourth quarter of 2018 and significant potential highlighted by exploration activity.
28th Nov 20187:00 amGNWSao Chico upside enhanced with completion of Induced Polarization Survey
20th Nov 20187:00 amGNWSignificant new exploration targets revealed by regional airborne survey
14th Nov 20187:00 amGNWUnaudited Interim Financial Results for the three and nine month periods to 30 September 2018 and Management’s Discussion and Analysis
30th Oct 20187:00 amGNWSerabi Gold plc: Operational and Exploration Review of Third Quarter 2018
20th Sep 20187:00 amGNWSerabi Gold plc: Appointment of Chief Operating Officer
2nd Jul 20186:30 pmGNWSerabi Gold plc: Award of Share Options
2nd Jul 20187:00 amGNWSerabi Gold plc - Total Voting Rights
28th May 201011:44 amRNSForm 8.3 - Serabi Mining PLC
17th May 20103:57 pmRNSForm 8.3 Serabi Mining

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.