The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSerica Energy Regulatory News (SQZ)

Share Price Information for Serica Energy (SQZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 185.60
Bid: 185.60
Ask: 186.00
Change: 3.50 (1.92%)
Spread: 0.40 (0.216%)
Open: 182.20
High: 187.20
Low: 181.30
Prev. Close: 182.10
SQZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

12 Oct 2020 07:00

RNS Number : 7093B
Serica Energy plc
12 October 2020
 

Serica Energy plc

("Serica" or the "Company") 

 

Operations Update

 

London, 12 October 2020 - Serica Energy plc (AIM: SQZ) is pleased to provide the following operations update.

 

 

Highlights

 

· Commencement of offshore operations to prepare the Rhum R3 well for production

· Successful installation of first Columbus subsea equipment

· Significantly improved gas prices

· No COVID-19 interruptions to operations or production

 

Rhum Field: R3 Intervention Project

 

Offshore operations on the R3 Intervention project have commenced. Awilco Drilling's WilPhoenix semi-submersible drilling rig, has arrived on location and is safely installed over the R3 well.

 

The Rhum field is situated some 380 km NE of Aberdeen in a water depth of 109 metres. Field development was sanctioned in 2003 and production started in December 2005. Rhum has subsea completions which are tied back to the Bruce platform complex which lies 44 km south of Rhum. The original development plan consisted of three wells but the third of these wells (R3) has never been put into production.

 

The current work programme will involve recovering equipment left in the well by the previous operator and removing an obstruction that is believed to be in place across parts of the downhole completion. The well will then be recompleted. Rig operations are planned to last approximately 70 days. R3 is already connected to the subsea production infrastructure and it is expected that operations to commence production from R3 will take place in early 2021.

 

Rhum wells produce predominantly gas with minor levels of condensate. Average Rhum production from the existing two wells in 2019 was 13,775 boe/d net to Serica's 50% field interest. A successful recompletion of R3 will increase the production capacity utilising the existing production facilities located on the Bruce platform and will, therefore, not lead to any significant additional CO2 emissions. This is in line with Serica's stated objective of reducing the carbon intensity of the operations associated with our production. Further details on Serica's commitment to ESG (Environment, Social & Governance) can be found at www.serica-energy.com/downloads/ESG-report-2019.pdf

 

A further update on the R3 Intervention project will be provided when rig operations are completed.

 

 

Columbus Development

 

In late September an important milestone was achieved in the Columbus development project with the successful installation of the seabed tie-in structure.

 

Columbus will be developed by a single subsea well, which will be connected to the Arran to Shearwater pipeline through which Columbus gas and condensate production will be exported co-mingled with Arran field production.

 

The Arran to Shearwater pipeline has been installed and the first Arran well has been spudded. The installation of the Shearwater to Columbus umbilical is complete and the Columbus tie-in structure has been placed on the seabed adjacent to the proposed wellhead location.

 

The jack-up rig Maersk Resilient has been contracted to drill the Columbus development well which is planned for the first half of 2021. First production is expected from Columbus in the second half of 2021 with expected production rates net to Serica of 3,500 - 4,000 boe/d to be achieved shortly thereafter.

 

 

Commodity Prices

 

Over 80% of Serica's production is gas and spot gas prices have continued to strengthen following the historically low prices encountered earlier this year. In January this year, average Heren NBP day-ahead spot prices were around 28p/therm but then fell significantly during the early stages of the COVID lock down reaching below 10p/therm on a number of days.

 

Subsequently, the recovery in gas prices has been strong and in September average spot prices were over 29.5p/therm, a substantial increase over the low point in the first half of the year. The average price in October to date has exceeded 35p/therm. Serica's gas price hedging programme yielded significant gains in the first half of the year and provides further support into 2022.

 

 

COVID-19

 

There have been no confirmed cases of COVID-19 on any of our installations nor, to date, any interruptions to production caused from COVID-19 infections on our or third-party facilities. Serica has not furloughed or laid off any staff during 2020 nor utilized any of the various government schemes that have been made available to support industry during the current pandemic.

 

Serica has assessed the risk of COVID-19 related matters impacting the availability of equipment and/or personnel for the R3 and Columbus projects and has determined that any such risk currently is insufficient to prevent the execution of these projects.

 

 

Mitch Flegg, Chief Executive of Serica Energy, commented:

 

"We are entering an exciting period of value-adding operations. The R3 Intervention project has the potential to add significant production volumes and can provide valuable optionality to the management of Rhum wells and reservoir. The Columbus development will add further production and diversity to our portfolio.

 

Serica's net production levels remain strong despite the added complexities associated with operating remote installations in a socially distanced manner. Gas prices have recovered significantly and the gas futures price outlook is good. Our balance sheet remains robust with significant cash reserves, no debt and limited decommissioning liabilities. This will enable us to execute these projects whilst simultaneously continuing to look to take advantage of current market conditions by pursuing opportunities to further expand our portfolio."

 

 

Additional Information

 

Rhum is a gas condensate field producing from two subsea wells, R1 and R2, tied into the Bruce facilities through a 44km pipeline. Rhum production is predominantly gas which is exported to St Fergus for delivery into the National Transmission System. Small quantities of associate condensate are exported onshore via the Forties Pipeline System. The field has produced at relatively constant rates through the past year.

 

The third well, R3, requires intervention work before it can be brought on production. In 1H 2019, investigative work to assess the condition of the well and associated control systems was successfully carried out and the data gathered was incorporated into planning for the R3 intervention. On 12 May 2020 Serica announced that it had entered into a contract for the provision of a drilling rig for the intervention work on R3 well on behalf of the Rhum partners.

 

 

Regulatory

 

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

 

The technical information contained in the announcement has been reviewed and approved by Fergus Jenkins, VP Technical at Serica Energy plc. Mr. Jenkins (MEng in Petroleum Engineering from Heriot-Watt University, Edinburgh) is a Chartered Engineer with over 25 years of experience in oil & gas exploration, development and production and is a member of the Institute of Materials, Minerals and Mining (IOM3) and the Society of Petroleum Engineers (SPE).

 

Enquiries:

 

 

 

 

Serica Energy plc

+44 (0)20 7457 2020

Tony Craven Walker, Executive Chairman

 

Mitch Flegg, CEO

 

 

 

Peel Hunt (Nomad & Joint Broker)

+44 (0)20 7418 8900

Richard Crichton / David McKeown / Alexander Allen

 

 

 

Jefferies (Joint Broker)

+44 (0)20 7029 8000

Tony White / Will Soutar

 

 

 

Instinctif Partners

+44 (0)20 7457 2020

Mark Garraway / Sarah Hourahane / Dinara Shikhametova

+44 (0)7493 867 435

+44 (0)7580 817 276

serica@instinctif.com

 

 

 

 

 

 

 

NOTES TO EDITORS

 

Serica Energy is a British independent oil and gas exploration and production company with a portfolio of exploration, development and production assets.

 

Serica is the operator of the producing Bruce, Keith and Rhum fields in the UK Northern North Sea, holding interests of 98%, 100% and 50% respectively. Serica also holds an 18% non-operated interest in the producing Erskine field in the UK Central North Sea and a 50% operated interest in the Columbus Development.

 

Further information on the Company can be found at www.serica-energy.com.

 

The Company's shares are traded on the AIM market of the London Stock Exchange under the ticker SQZ and the Company is a designated foreign issuer on the TSX. To receive Company news releases via email, please subscribe via the Company website.

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFLFFTIDLLLII
Date   Source Headline
3rd May 20247:00 amRNSTransaction in Own Shares
2nd May 20247:00 amRNSTransaction in Own Shares
1st May 20247:00 amRNSTransaction in Own Shares
30th Apr 20245:09 pmRNSTotal Voting Rights
30th Apr 20247:00 amRNSTransaction in Own Shares
29th Apr 20247:00 amRNSTransaction in Own Shares
26th Apr 20247:00 amRNSTransaction in Own Shares
25th Apr 20247:00 amRNSTransaction in Own Shares
24th Apr 20247:01 amRNSInitiation of share buyback programme
24th Apr 20247:00 amRNSFinal Results
16th Apr 20242:00 pmRNSResults Date/Investor Presentation/CEO Change Date
26th Mar 202411:08 amRNSIssue of Shares and Total Voting Rights
7th Mar 20245:06 pmRNSPDMR Dealings
7th Mar 202411:35 amRNSPDMR Dealings
7th Mar 20247:00 amRNS2023 Year End Reserves and 2024 Production Update
29th Feb 20244:30 pmRNSTotal Voting Rights
26th Feb 20247:00 amRNSAcquisition of Interest in Greater Buchan Area
8th Feb 202411:32 amRNSPDMR Dealings
8th Feb 20247:00 amRNSPresentation to Sell-Side Analysts
7th Feb 20246:09 pmRNSPDMR Dealings
6th Feb 20246:17 pmRNSPDMR Dealings
5th Feb 20247:00 amRNSOperations Update
1st Feb 20242:25 pmRNSTotal Voting Rights
1st Feb 20247:00 amRNSChief Executive Officer change and Succession Plan
23rd Jan 20247:00 amRNSCompletion of New 6-year Borrowing Facility
29th Dec 20237:00 amRNSTotal Voting Rights
20th Dec 20231:25 pmRNSBLOCK LISTING SIX MONTHLY RETURN
20th Dec 20231:20 pmRNSBLOCK LISTING SIX MONTHLY RETURN
20th Dec 20231:15 pmRNSBLOCK LISTING SIX MONTHLY RETURN
20th Dec 20231:10 pmRNSBLOCK LISTING SIX MONTHLY RETURN
18th Dec 20237:00 amRNSNew US$525 million 6-year Borrowing Facility
6th Dec 20237:00 amRNSOperations and Organisation Update
30th Nov 20234:15 pmRNSTotal Voting Rights
23rd Nov 20237:00 amRNSAcquisition of Interest in Greater Buchan Area
21st Nov 20237:00 amRNSBoard Changes
31st Oct 20233:40 pmRNSTotal Voting Rights
31st Oct 20237:00 amRNSUKCS 33rd Round Licence Award
28th Sep 20232:10 pmRNSHolding(s) in Company
27th Sep 20234:30 pmRNSHolding(s) in Company
26th Sep 20232:50 pmRNSHolding(s) in Company
25th Sep 20234:32 pmRNSHolding(s) in Company
22nd Sep 20232:16 pmRNSIssue of Shares and Total Voting Rights
20th Sep 20237:00 amRNSHolding(s) in Company
19th Sep 20237:00 amRNSInterim Results
8th Sep 202311:25 amRNSNotice of Results and Investor Presentation
31st Aug 202311:56 amRNSTotal Voting Rights
25th Aug 20237:00 amRNSBlock Listing Six Monthly Return
18th Aug 20239:05 amRNSBlock Listing Six Monthly Return
16th Aug 20237:06 amRNSBLOCK LISTING SIX MONTHLY RETURN
11th Aug 20234:10 pmRNSBlock Listing Six Monthly Return

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.