Rainbow Rare Earths Phalaborwa project shaping up to be one of the lowest cost producers globally. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSerica Energy Regulatory News (SQZ)

Share Price Information for Serica Energy (SQZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 154.20
Bid: 154.00
Ask: 154.40
Change: 0.90 (0.59%)
Spread: 0.40 (0.26%)
Open: 152.80
High: 155.00
Low: 151.40
Prev. Close: 153.30
SQZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Columbus First Production

25 Nov 2021 07:00

RNS Number : 5224T
Serica Energy PLC
25 November 2021
 

 

Serica Energy plc

("Serica" or the "Company")

Columbus First Production

London, 25 November 2021 - Serica Energy plc (AIM: SQZ), a British independent upstream oil and gas company with operations centred on the UK North Sea and over 80% gas production, provides the following update on its Columbus field, located in the Central North Sea.

We are pleased to announce that first production has been achieved from Columbus. Hydrocarbons from the C1z development well started flowing into the Arran subsea system on 24 November. The comingled Arran and Columbus production streams are now being exported to the Shearwater platform for processing and onward export to the gas and liquid sales points. Columbus is expected to be producing at its potential by early December. Further information on flow rates will be issued as part of an Operations Update in mid-December.

 

 

Mitch Flegg, Chief Executive of Serica Energy, commented:

"I am delighted that first production has been achieved, as planned, during Q4 2021.

This marks a significant milestone for Serica as it reaches the successful conclusion of its first development project. The Company was involved in the original discovery of Columbus and has acted as Operator through the appraisal and development phases and now into operations. I look forward to updating the market in mid-December by which time we expect to have ramped up production to a stable level.

Serica's approach to increasing its production base and providing much needed energy to the UK while seeking lower carbon emission solutions, has been achieved by using shared existing infrastructure to progress the development of Columbus.

This has been a complex project and I would once again like to acknowledge the skill, hard-work and dedication of our project team, the Shearwater and Arran Operators and our joint venture partners Waldorf Production UK Ltd. and Tailwind Energy Ltd."

 

Regulatory 

This announcement contains inside information. 

The technical information contained in the announcement has been reviewed and approved by Fergus Jenkins, VP Technical at Serica Energy plc. Mr. Jenkins (MEng in Petroleum Engineering from Heriot-Watt University, Edinburgh) is a Chartered Engineer with over 25 years of experience in oil & gas exploration, development and production and is a member of the Institute of Materials, Minerals and Mining (IOM3) and the Society of Petroleum Engineers (SPE). 

 

 

 

Enquiries:

 

Serica Energy plc

+44 (0)20 7390 0230

Tony Craven Walker, Executive Chairman

Mitch Flegg, CEO

Peel Hunt (Nomad & Joint Broker)

+44 (0)20 7418 8900

Richard Crichton / David McKeown / Alexander Allen

Jefferies (Joint Broker)

+44 (0)20 7029 8000

Tony White / Will Soutar

Vigo Consulting

+44 (0)20 7390 0230 

Patrick d'Ancona / Chris McMahon / Claudia Cowan

serica@vigoconsulting.com

 

NOTES TO EDITORS 

Serica Energy is a British independent oil and gas exploration and production company with a portfolio of exploration, development and production assets. 

Columbus lies 35km north east of the Shearwater production facilities and is being produced by a single well tied into the existing Arran to Shearwater pipeline. A recent Competent Person's Report estimates the Columbus gross undeveloped 2P reserves to be in excess of 14 million barrels of oil equivalent ("boe"). Following the recent drilling of the development well, it was connected to the Arran pipeline, through which Columbus production will be exported along with Arran Field production.

When the production reaches the Shearwater platform, the gas and liquids will be separated, and the gas exported via the SEGAL line to St Fergus and the liquids through the Forties Pipeline System to Cruden Bay. Serica is Operator and has a 50% interest in the field; its partners are Waldorf Production UK Ltd (25%) and Tailwind Mistral Ltd. (25%).

Serica is the operator of the producing Bruce, Keith and Rhum fields in the UK Northern North Sea, holding interests of 98%, 100% and 50% respectively, and holds a 50% operated interest in the producing Columbus field in the UK Central North Sea. Serica also holds an 18% non-operated interest in the producing Erskine field in the UK Central North Sea.

Over 80% of Serica's production is natural gas, a key element in the UK's energy transition. 

Further information on the Company can be found at www.serica-energy.com

The Company's shares are traded on the AIM market of the London Stock Exchange under the ticker SQZ and the Company is a designated foreign issuer on the TSX. To receive Company news releases via email, please subscribe via the Company website.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLDKQBDDBDBPDB
Date   Source Headline
6th Nov 20141:06 pmRNSHolding(s) in Company
20th Oct 20147:00 amRNSUpdate on Sidi Moussa Operations
15th Oct 201411:13 amRNSShare purchase by Directors
16th Sep 20144:55 pmRNSShare purchase by Directors
14th Aug 201410:13 amRNSShare purchase by Directors
12th Aug 20147:00 amRNSInterim Results
5th Aug 20147:00 amRNSCompletion of Doyle farm-out agreement
31st Jul 20147:26 amRNSDrilling commences in Sidi Moussa licence
15th Jul 201412:06 pmRNSShare purchase by Directors
26th Jun 201411:54 amRNSResult of AGM
17th Jun 20147:00 amRNSACQUISITION OF INTEREST IN ERSKINE FIELD FROM BP
13th Jun 20144:20 pmRNSShare purchase by Directors
3rd Jun 201410:24 amRNSNotice of AGM
14th May 20141:38 pmRNSShare purchase by Directors
8th May 201412:07 pmRNSHolding(s) in Company
22nd Apr 20145:03 pmRNSShare purchase by Directors
10th Apr 20147:00 amRNSFinal Results
14th Mar 20147:00 amRNSShare purchase by Directors
14th Feb 20144:05 pmRNSShare purchase by Directors
3rd Feb 201411:08 amRNSOption Awards
14th Jan 201411:03 amRNSShare purchase by Directors
20th Dec 201312:02 pmRNSUpdate on Operations in Morocco
20th Dec 20137:00 amRNSUpdate on Operations in Namibia
16th Dec 20132:15 pmRNSShare purchase by Directors
2nd Dec 20133:35 pmRNSUK 27th Licensing Round Award
22nd Nov 201312:01 pmRNSHolding(s) in Company
15th Nov 20139:00 amRNSShare purchase by Directors
15th Nov 20138:01 amRNSAdmission of Shares and Directors' Dealings
14th Nov 20137:00 amRNSHolding(s) in Company
11th Nov 201312:01 pmRNSResult of General Meeting
11th Nov 20137:00 amRNSResult of Open Offer
28th Oct 201311:10 amRNSMorocco Update
24th Oct 20137:00 amRNSPosting of Placing and Open Offer Circular
22nd Oct 20137:00 amRNSPlacing and Open Offer
15th Oct 20139:35 amRNSShare purchase by Directors
26th Sep 20137:00 amRNSAppointment of Nominated Adviser
17th Sep 20137:00 amRNSInterim Results
16th Sep 201312:47 pmRNSShare purchase by Directors
16th Aug 20133:12 pmRNSShare purchase by Directors
16th Jul 20132:17 pmRNSShare purchase by Directors
27th Jun 201311:35 amRNSResult of AGM
27th Jun 201310:00 amRNSCentrica farm-in and AGM Statement
24th Jun 20135:23 pmRNSShare Purchase by Directors
6th Jun 20133:39 pmRNSAnnual General Meeting
30th May 20137:00 amRNSFinal Results
17th Apr 20133:55 pmRNSShare purchase by Directors
28th Mar 20131:54 pmRNSColumbus Export Route Update
22nd Mar 20137:15 amRNSHolding(s) in Company
18th Mar 201311:14 amRNSShare Purchase by Directors
6th Mar 20137:00 amRNSColumbus Field Development Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.