Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSound Energy Regulatory News (SOU)

Share Price Information for Sound Energy (SOU)

Share Price is delayed by 15 minutes
Get Live Data
1.80    0.00 (0.00%)
Bid:
1.70
Ask:
1.90
Spread: 0.20 (11.765%)
Market Cap: £4.11m
SOU Live PriceLast checked at - London Stock Exchange

Intraday Sound Energy Share Chart

Project Update

24 Apr 2013 07:00

RNS Number : 0581D
Sound Oil PLC
24 April 2013
 



 

24 April 2013

 

Sound Oil plc

("Sound Oil" or "the Company")

 

Badile Project Update

 

Sound Oil, the Italian focused upstream oil and gas company, is pleased to update investors on its Badile project, located onshore in the Po Valley in Northern Italy.

 

Badile is an exploration prospect some 45 km south-west from the geologically analogous Malossa gas field (with a cumulative production prior to 1992 of 177 Bscf with associated light condensate). The prospect has independently assessed Low-Best-High prospective resources of 47-175-938 Bscf respectively in Upper Triassic reservoirs.

 

Following the decision to retain Sound Oil's 100% operated position (and therefore the significant upside of this prospect), the Company has completed the technical work required for the drilling application and Environmental Impact Assessment.

 

As a result of this technical work the Company has made the following enhancements to the detailed Badile drilling programme:

 

- Reduction in target depth from 5,300 metres to 4,200 metres targeting only the Upper Triassic "Dolomia Conchodon" reservoir without significantly reducing the likelihood of encountering hydrocarbons.

- Shorter period required for drilling (down from an estimated 164 days to 143 days) resulting in significantly lower costs (from €20 million to €18 million).

- Associated reduction in drilling complexity due to lower expected pressures and temperatures.

- Increased likelihood of gas-condensate occurrence in the target section.

The Company is also pleased to confirm that a dedicated team of highly qualified and experienced professionals has been secured for the Badile project including the appointment of a high profile ex ENI industry professional as Badile Project Director. This Milan based role will commence in September 2013 and will form part of Sound Oil's Executive Team.

 

 

James Parsons, Sound Oil's Chief Executive Officer, commented:

 

"This positive re-framing of the Badile drilling programme is an important step forward for the Company which will lower the technical complexity of the well, shorten its drilling time, lower costs and increase well deliverability in the case of success. In addition, we expect that the revised programme objectives will accelerate the approval of the well by the various permitting authorities without compromising on the economic proposition for shareholders.

 

The drilling request and EIA will be submitted shortly in anticipation of spud in 2014. The Company will also sign a Letter of Intent on a suitable rig in the near future."

 

 

 

For further information please contact:

 

Sound Oil

James Parsons, Chief Executive Officer

 

j.parsons@soundoil.co.uk

 

Smith & Williamson - Nominated Adviser

Azhic Basirov

David Jones

 

Tel: +44 (0)20 7131 4000

Peel Hunt - Broker

Richard Crichton

Charles Batten

 

Tel: +44 (0)20 7418 8900

 

Notes:

 

"Low-Best-High" refers to 90%-50%-10% chances respectively of finding a given volume and is consistent with SPE (The Society of Petroleum Engineers) guidelines. The figures quoted here are based on an evaluation of the Badile prospect by ERC-Equipoise prepared for the Company in December 2011. The "Best" estimate of 175 Bscf shown above is broadly consistent with the single case best estimate of 185 Bscf given in the Fugro Robinson CPR of July 2011. Bscf means billion standard cubic feet of gas. The information contained in this announcement has been reviewed by Sound Oil's Chief Operating Officer, Dr M. J. Cope BSc PhD CGeol FGS, a qualified petroleum geologist.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCMMGZDNFNGFZM
Date   Source Headline
23rd May 20177:00 amRNSFinal TE-8 Results and Revised Estimates
17th May 20177:00 amRNSSidi Moktar: Rig Arrival and Work Programme
4th May 20177:00 amRNSBadile: Fourth Casing Point
2nd May 20173:00 pmRNSTotal Voting Rights
25th Apr 20177:00 amRNSMeridja : Schlumberger Investment
18th Apr 20177:00 amRNSMobilisation of Rig to Sidi Moktar
12th Apr 20176:07 pmRNSAnnual Report and Notice of AGM
10th Apr 20177:00 amRNSBadile: Third Casing Point
3rd Apr 20173:00 pmRNSTotal Voting Rights
29th Mar 201712:16 pmRNSDirector/PDMR Shareholding
29th Mar 201712:15 pmRNSDirector/PDMR Shareholding
28th Mar 20177:00 amRNSTendrara: TE-8 Results
28th Mar 20177:00 amRNSPreliminary Results
23rd Mar 20177:00 amRNSBadile: Second Casing Point
23rd Mar 20177:00 amRNSTendrara: TE-8 - Completion of Drilling
15th Mar 20173:02 pmRNSResult of General Meeting
15th Mar 20177:00 amRNSGeneral Meeting Operational Update: TE8 and Badile
14th Mar 20177:00 amRNSBadile: First Casing Point
10th Mar 20177:00 amRNSTendrara: TE-8 Final Casing Point
8th Mar 20177:00 amRNSBadile: Drilling Commences
2nd Mar 20177:00 amRNSTendrara: TE-8 Second Casing Point
1st Mar 20172:30 pmRNSTotal Voting Rights
24th Feb 20177:00 amRNSTendrara: TE-8 First Casing Point
21st Feb 201710:25 amRNSPosting of Circular and Notice of General Meeting
21st Feb 20179:22 amRNSDirector/PDMR Shareholding
20th Feb 20177:00 amRNSTendrara: TE-8 Drilling Commences
20th Feb 20177:00 amRNSProposed Acquisition Update
13th Feb 20177:00 amRNSRedemption of Loan and Exercise of Warrants
7th Feb 20175:54 pmRNSBadile Rig Contract: Payment Using Equity
7th Feb 20173:55 pmRNSDirector/PDMR Shareholding
7th Feb 20177:00 amRNSTE-8 Rig Mobilisation
1st Feb 20175:20 pmRNSTotal Voting Rights
1st Feb 20173:50 pmRNSChange of Broker
1st Feb 20172:54 pmRNSPreliminary Volume Estimates and Work Programme
19th Jan 20177:20 amRNSProposed Acquisition of OGIF Interests
19th Jan 20177:00 amRNSSuccessful TE-7 Extended Well Test
19th Jan 20177:00 amRNSTE-8: Commencement of Civil Works
5th Jan 20177:00 amRNSBadile Update and Rig Mobilisation
30th Dec 20163:00 pmRNSTotal Voting Rights
23rd Dec 201612:33 pmRNSDirector/PDMR Shareholding
19th Dec 20167:00 amRNSDirector/PDMR Shareholding and Block Admission
16th Dec 20163:26 pmRNSDirector/PDMR Shareholding
16th Dec 201612:18 pmRNSDirector/PDMR Shareholding
15th Dec 20167:00 amRNSTendrara: TE7 Bottom Hole Pressure & TE8 Location
12th Dec 20167:00 amRNSSidi Moktar: Receipt of Regulatory Approvals
30th Nov 20163:00 pmRNSTotal Voting Rights
29th Nov 20167:00 amRNSBadile: Rig Contract Signature
25th Nov 20167:00 amRNSSuccessful £26.9 million Fundraising at Market
24th Nov 20164:30 pmRNSDirector/PDMR Shareholding
24th Nov 20167:13 amRNSUnderwritten Offers to Raise £24.1 million

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.