Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSound Energy Regulatory News (SOU)

Share Price Information for Sound Energy (SOU)

Share Price is delayed by 15 minutes
Get Live Data
1.80    0.00 (0.00%)
Bid:
1.70
Ask:
1.90
Spread: 0.20 (11.765%)
Market Cap: £4.11m
SOU Live PriceLast checked at - London Stock Exchange

Intraday Sound Energy Share Chart

Preliminary Volume Estimates and Work Programme

1 Feb 2017 14:54

RNS Number : 7789V
Sound Energy PLC
01 February 2017
 

1 February 2017

 

Sound Energy plc

("Sound Energy" or the "Company")

 

Preliminary Volume Estimates for Tendrara and Meridja and Moroccan Work Programme

 

Sound Energy, the African and European focused upstream gas company, notes the movement in the Company's share price and is pleased to provide an early stage estimate of the exploration potential of the Tendrara and Meridja permit areas (the "Basin") and confirm its 2017 Moroccan work programme.

 

The Company recently comissioned a preliminary basin modelling study from a leading independent consultancy (the "Basin Model"). Following receipt of the Basin Model, the Company is pleased to announce that Sound Energy's internally estimated volumes for the exploration potential of the entire Tendrara and Meridja permit areas are 17 Tcf mid case unrisked* original gas in place (gross). The Basin Model highlights the possibility for a range of estimated volumes across the entire Tendrara and Meridja permit areas, with a 9 Tcf low case for unrisked original gas in place (gross) and, if all the key elements of the petroleum system's model are present, an upside case of 31 Tcf of unrisked original gas in place (gross).

 

The Basin Model, from which the volume estimates above are derived, is supported by:

· the mapped inventory of discoveries, prospects and leads in the Triassic TAGI reservoir;

· the volume of hydrocarbons generated, and available to charge, from the Paleozoic source rocks post deposition of the thick salt seal; and

· a conceptual evaluation of the Paleozoic resource potential by analogue to neighbouring Algerian basins.

 

The Basin Model indicates that there is sufficient gas available to charge the existing Triassic TAGI prospects and leads and the yet to be explored Paleozoic.

 

The Company cautions that notwithstanding its internal estimates for the exploration potential of the Basin, it has so far only completed the first two wells on the structure which have established an estimated 300 to 500 Bscf of original gas in place (gross). Further exploration activity, including the acquisition of additional 2D and 3D seismic and the requirement for further drilling, will be required to substantiate the estimated exploration potential of the Basin. The Company's estimates will be subject to a Competent Person's Report to be commissioned following the drilling of TE-8 and before the Company takes Final Investment Decision on the development later in 2017.

 

The 2017 Tendrara / Meridja work programme will therefore be focused on accelerating the exploration activity to unlock the ultimate potential of the Basin and advancing preparations to early first gas. The Company's 2017 Moroccan work programme will include:

 

Tendrara / Meridja

(covering 14,857 square kilometres** and 8,873 square kilometres respectively)

 

· Ongoing reprocessing of the existing 3D seismic to further reduce the range of uncertainty over the Tendara-Lakbir horst.

 

 

· Drilling of a bold Tendrara step-out well, TE-8, in February 2017 (with a contingent sidetrack) to increase, in a success case, the estimated volumes for original gas in place at Tendrara from 300-500 Bscf (gross) to upto 1.5Tcf of original gas in place (as announced on 15 December 2016).

 

· Preparation of the field development plan, which includes the finalisation of the commercial agreements for gas sales and associated infrastructure, right-sizing of the facilities / pipeline and the optimization of the well design / spacing.

 

· Immediate acquisition of an airborne gradiometry survey to delineate the Basin geometry and enhance the understanding of the Paleozoic potential.

 

· Reprocessing of historical 2D seismic and acquisition of new 2D seismic to determine the extent and volume potential to the North East of the Tendrara discovery. The acquisition of new seismic and gradiometry, which are not a commitment on the Tendrara licence, are conditional on a Tendrara licence time extension which is currently under discussion with the Moroccan authorities.

 

· Re-entry of multiple older wells drilled by previous operators (including TE-1 and TE-2) to test the upside potential of the Triassic play and also explore potential disposal options for the associated CO2 expected from the reservoir. The re-entries are also conditional on the licence extension described immediately above.

 

· Preparations for further exploration wells on the Tendrara licence with a view to prove up the Company's early stage resource estimates.

 

Sidi Moktar

 

· Re-entering the existing wells at Sidi Moktar and conducting a well test of the prospective Lower Jurassic reservoir. Consideration is also being given to additional work programmes, including sidetrack and acquiring further 2 and 3D seismic to further evaluate the potential of the pre-salt Triassic.

 

* the term 'unrisked' refers to exploration resources where no subsurface CoS (chance of success) has been applied.

 

** in accordance with the Moroccan Hydrocarbon code, and consistent with all licences in Morocco, the Company will be required to relinquish a proportion of the Tendrara licence area over time subject to a maximum relinquishment of 50 per cent. of the licence acreage. The area to be relinquished is at the election of the Company (subject to regulatory consents) and the accrued Tendrara relinquishment requirement to date is approximately 5,100 square kilometres. This does not affect the volume estimates referred to in this announcement. As announced by the Company on 19 January 2017, the Company has entered heads of agreement with Oil & Gas Investment Fund ("OGIF") for the proposed acquisition of, inter alia, an existing OGIF application for a 75% position in the to be relinquished areas of Tendrara. Subject to the completion of the proposed transaction, the Company would therefore hold an application for a 75% position in the areas of Tendrara proposed to be relinquished.

 

 

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

 

 

 

For further information please contact:

 

 

Vigo Communications - PR Adviser

Patrick d'Ancona

Chris McMahon

Alexandra Roper

 

Tel: +44 (0)20 7830 9700

Sound Energy

James Parsons, Chief Executive Officer

 

j.parsons@soundenergyplc.com

Smith & Williamson - Nominated Adviser

Azhic Basirov

David Jones

Ben Jeynes

  

Tel: +44 (0)20 7131 4000

Cantor Fitzgerald Europe - Broker

Sarah Wharry

David Porter

 

Tel: +44 (0)20 7894 8896

 

The information contained in this announcement has been reviewed by Sound Energy's Executive Vice President, Brian Mitchener, a chartered petroleum geologist. The Company's internal estimates are made in accordance with SPE standards.

 

Tcf means trillion cubic feet of gas; Bscf means billion cubic feet of gas.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSFFLFFWSEIE
Date   Source Headline
18th Apr 20185:45 pmRNSAnnual Report and Notice of Annual General Meeting
9th Apr 20188:06 amRNSCompletion of Italian Divestment
3rd Apr 20185:09 pmRNSTVR and Block Admission Interim Review
22nd Mar 20187:00 amRNSFinal Results
14th Mar 20187:00 amRNSUpdate re Sound Italy Divestment
7th Mar 20187:16 amRNSUpdate re Sound Italy Divestment
1st Mar 20183:00 pmRNSTotal Voting Rights
12th Feb 20187:00 amRNSSidi Moktar: Award of New Petroleum Agreement
8th Feb 201812:45 pmRNSResult of General Meeting
8th Feb 20187:00 amRNSEastern Morocco 2018 Work Programme
1st Feb 20185:36 pmRNSTotal Voting Rights
31st Jan 20187:00 amRNSAppointment of Joint Broker
24th Jan 20188:34 amRNSPosting of Circular and Notice of General Meeting
23rd Jan 20187:00 amRNSResources Certification and Directorate Change
22nd Jan 20187:00 amRNSDisposal of Italian Portfolio
2nd Jan 20183:30 pmRNSTotal Voting Rights
22nd Dec 20177:04 amRNSDirector Declaration
20th Dec 20177:00 amRNSTendrara Certification - Preliminary TE-5 Results
14th Dec 20177:00 amRNSEastern Morocco: 2D Seismic and MT Update
1st Dec 20173:01 pmRNSTotal Voting Rights
30th Nov 20177:00 amRNSExploration Volume Estimates for Sidi Moktar
20th Nov 20177:00 amRNSEastern Morocco: Aerial Gradiometry Results
1st Nov 20173:56 pmRNSTotal Voting Rights
5th Oct 20177:15 amRNSHeads of Terms: Disposal of Italian Interests
4th Oct 20177:00 amRNSEastern Morocco: Exploration Drilling Programme
2nd Oct 20173:09 pmRNSTotal Voting Rights
21st Sep 20174:55 pmRNSTotal Voting Rights
21st Sep 201712:48 pmRNSDirector/PDMR Shareholding and Issue of Equity
14th Sep 20177:00 amRNSHalf-year Report
12th Sep 20177:00 amRNSCompletion of OGIF Acquisition and Issue of Equity
5th Sep 20177:00 amRNSCFO Appointment
4th Sep 20172:54 pmRNSBlock Admission Interim Review and TVR
4th Sep 20177:00 amRNSEastern Morocco: Update re Development Funding
22nd Aug 20177:00 amRNSUpdate re Badile and Forthcoming Investor Event
3rd Aug 20177:00 amRNSEastern Morocco: Licence Award
1st Aug 20174:43 pmRNSIssue of Equity and Total Voting Rights
21st Jul 20177:00 amRNSEastern Morocco Update
19th Jul 20177:00 amRNSTendrara: TE-7 Pressure Build Up
7th Jul 20173:44 pmRNSDirector/PDMR Shareholding
6th Jul 201710:44 amRNSDirector/PDMR Shareholding
6th Jul 201710:43 amRNSDirector/PDMR Shareholding
5th Jul 20177:00 amRNSUpdate re Sidi Moktar
3rd Jul 20175:14 pmRNSTotal Voting Rights
3rd Jul 20177:00 amRNSBadile Update
21st Jun 20179:30 amRNSDirectorate Change
14th Jun 20177:00 amRNSUpdate re Badile
12th Jun 20177:00 amRNSOperational Update: Sidi Moktar and Badile
31st May 20175:15 pmRNSTotal Voting Rights
23rd May 201712:12 pmRNSResult of AGM
23rd May 20177:00 amRNSProposed Board Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.