Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSound Energy Regulatory News (SOU)

Share Price Information for Sound Energy (SOU)

Share Price is delayed by 15 minutes
Get Live Data
1.80    0.00 (0.00%)
Bid:
1.70
Ask:
1.90
Spread: 0.20 (11.765%)
Market Cap: £4.11m
SOU Live PriceLast checked at - London Stock Exchange

Intraday Sound Energy Share Chart

Operations Update

23 Jan 2012 15:32

RNS Number : 0272W
Sound Oil PLC
23 January 2012
 



23 January 2012

 

Sound Oil plc

("Sound Oil" or "the Company")

 

Operations Update - Casa Tiberi -1, Italy and Cataka -1, Indonesia

 

Sound Oil, the upstream oil and gas company with assets in Italy and Indonesia, announces the following update on its current operations.

 

Montemarciano Permit, Casa Tiberi -1, Ancona, Italy (Sound Oil 100%)

 

Sound Oil is pleased to confirm that, the Casa Tiberi-1 well has been re-entered and the planned test over the interval 571-581 metres successfully completed. The well flowed gas with a final rate of 37,850 scmd on a 5/16" choke (approximately 1.3 MMscfd). The data from the test will be studied in detail to assess the production potential of the well. The good gas quality and the nearby presence of a low pressure gas network provide an opportunity for a commercial fast-track development of this discovery. A further announcement will follow once the test results have been fully analysed and commercial alternatives explored. In the meantime, an application to extend the permit for a further three years has been submitted to the relevant authorities.

 

Citarum PSC, Java, Indonesia (Sound Oil 20%)

 

Sound Oil has been advised by the Operator that the Cataka-1 exploration well on the Citarum PSC, Java, Indonesia has encountered unstable formation in the top hole section, necessitating a sidetrack. The sidetrack hole has already been drilled to the casing depth at 1,397 feet and the 13 3/8ths casing set and cemented. Now that this part of the unstable formation has been cased off, the well will drill ahead to the objective at 6,995 feet as originally planned. It is estimated that at least two additional weeks will be needed to complete operations beyond the planned 21 day programme.

 

Gerry Orbell, Sound Oil's Chairman and Chief Executive, commented:

"The planned gas test at Casa Tiberi is part of our evaluation to determine the commercial viability of this discovery. The results so far are encouraging and we will know more in the coming weeks as they are fully integrated with our other work.

 

In Java, Pan Orient has now set the casing over much of the problem interval that was encountered in the top hole. We expect the Operator will be able to drill ahead to test the hydrocarbon potential of this exciting exploration prospect".

 

For further information please contact:

 

Sound Oil

Gerry Orbell, Chairman and Chief Executive

Michael Cope, Chief Operating Officer

 

Tel: +44 (0)1372 365745

Smith & Williamson - Nominated Adviser

Azhic Basirov

David Jones

 

Tel: +44 (0)20 7131 4000

Investec - Broker

David Flin

 

Tel: +44 (0)20 7597 4000

Buchanan

Tim Thompson

Ben Romney

Helen Chan

 

Tel: +44 (0)20 7466 5000

 

 The information contained in this announcement has been reviewed by Sound Oil's Chief Operating Officer, Dr M. J. Cope BSc PhD CGeol FGS, a qualified petroleum geologist. "scmd" means standard cubic metres per day and "MMscfd" means million standard cubic feet per day.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBJMATMBTTBAT
Date   Source Headline
23rd May 20177:00 amRNSFinal TE-8 Results and Revised Estimates
17th May 20177:00 amRNSSidi Moktar: Rig Arrival and Work Programme
4th May 20177:00 amRNSBadile: Fourth Casing Point
2nd May 20173:00 pmRNSTotal Voting Rights
25th Apr 20177:00 amRNSMeridja : Schlumberger Investment
18th Apr 20177:00 amRNSMobilisation of Rig to Sidi Moktar
12th Apr 20176:07 pmRNSAnnual Report and Notice of AGM
10th Apr 20177:00 amRNSBadile: Third Casing Point
3rd Apr 20173:00 pmRNSTotal Voting Rights
29th Mar 201712:16 pmRNSDirector/PDMR Shareholding
29th Mar 201712:15 pmRNSDirector/PDMR Shareholding
28th Mar 20177:00 amRNSTendrara: TE-8 Results
28th Mar 20177:00 amRNSPreliminary Results
23rd Mar 20177:00 amRNSBadile: Second Casing Point
23rd Mar 20177:00 amRNSTendrara: TE-8 - Completion of Drilling
15th Mar 20173:02 pmRNSResult of General Meeting
15th Mar 20177:00 amRNSGeneral Meeting Operational Update: TE8 and Badile
14th Mar 20177:00 amRNSBadile: First Casing Point
10th Mar 20177:00 amRNSTendrara: TE-8 Final Casing Point
8th Mar 20177:00 amRNSBadile: Drilling Commences
2nd Mar 20177:00 amRNSTendrara: TE-8 Second Casing Point
1st Mar 20172:30 pmRNSTotal Voting Rights
24th Feb 20177:00 amRNSTendrara: TE-8 First Casing Point
21st Feb 201710:25 amRNSPosting of Circular and Notice of General Meeting
21st Feb 20179:22 amRNSDirector/PDMR Shareholding
20th Feb 20177:00 amRNSTendrara: TE-8 Drilling Commences
20th Feb 20177:00 amRNSProposed Acquisition Update
13th Feb 20177:00 amRNSRedemption of Loan and Exercise of Warrants
7th Feb 20175:54 pmRNSBadile Rig Contract: Payment Using Equity
7th Feb 20173:55 pmRNSDirector/PDMR Shareholding
7th Feb 20177:00 amRNSTE-8 Rig Mobilisation
1st Feb 20175:20 pmRNSTotal Voting Rights
1st Feb 20173:50 pmRNSChange of Broker
1st Feb 20172:54 pmRNSPreliminary Volume Estimates and Work Programme
19th Jan 20177:20 amRNSProposed Acquisition of OGIF Interests
19th Jan 20177:00 amRNSSuccessful TE-7 Extended Well Test
19th Jan 20177:00 amRNSTE-8: Commencement of Civil Works
5th Jan 20177:00 amRNSBadile Update and Rig Mobilisation
30th Dec 20163:00 pmRNSTotal Voting Rights
23rd Dec 201612:33 pmRNSDirector/PDMR Shareholding
19th Dec 20167:00 amRNSDirector/PDMR Shareholding and Block Admission
16th Dec 20163:26 pmRNSDirector/PDMR Shareholding
16th Dec 201612:18 pmRNSDirector/PDMR Shareholding
15th Dec 20167:00 amRNSTendrara: TE7 Bottom Hole Pressure & TE8 Location
12th Dec 20167:00 amRNSSidi Moktar: Receipt of Regulatory Approvals
30th Nov 20163:00 pmRNSTotal Voting Rights
29th Nov 20167:00 amRNSBadile: Rig Contract Signature
25th Nov 20167:00 amRNSSuccessful £26.9 million Fundraising at Market
24th Nov 20164:30 pmRNSDirector/PDMR Shareholding
24th Nov 20167:13 amRNSUnderwritten Offers to Raise £24.1 million

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.