Operations Update

17 Mar 2025 07:00

RNS Number : 8323A
Sound Energy PLC
17 March 2025
 

17 March 2025

 

 

Sound Energy plc

("Sound" or the "Company")

 

 

Transition progressing seamlessly, Change of contract with Italfluid GeoEnergy

 

Sound Energy plc, (AIM: SOU) the Transition Energy Company is pleased to provide an update in relation to the operations at Tendrara:

 

Name Change

 

The subsidiary of Sound Energy plc sold to Managem SA, previously named Sound Energy Morocco East Limited has formally changed its name to Mana Energy ltd ("Mana Energy" or the "Operator").

 

Exploration: Transition progressing well

 

The Operator is continuing to assemble its subsurface and operational team and is preparing to commence detailed planning alongside finalising the licence formalities with the relevant Government Authorities. A joint venture workshop is scheduled in March, with active participation of the Company, to review the exploration strategy, the planned exploration targets and to commence the technical, contractual and regulatory work required to initiate drilling operations.

 

Tendrara Concession: Seamless work progress & change of contractual scheme

 

The transition of Operatorship has not altered the pace of ongoing activities at Tendrara with construction of Phase 1 development facility for the TE-5 Horst continuing to move forward towards completion. The procurement and delivery to site of the gas gathering system equipment required to connect the two existing production wells, TE-6 and TE-7, to the mLNG facility is progressing. The subsurface well control barriers in the two production wells, whose work over operations were successfully completed last year by the Company, will be removed and the wells will be brought into production. The Operator has advised that the completion of the installation of the gas gathering system and connection to the wells is expected to occur by Q3 2025.

 

Italfluid GeoEnergy Srl ("Italfluid"), the main contractor tasked with designing, constructing, commissioning, operating and maintaining the mLNG facility and the Operator (on behalf of the Concession JV) have agreed to amend their contractual arrangement by terminating the vendor financed lease agreement announced on 23 December 2020 (the "Lease Agreement") and entering into an industry standard Engineering-Procurement-Construction contract (the "EPC Contract"). The past capital payments of approximately US$ 9.5 million made under the Lease Agreement were acknowledged by Italfluid as part payment received under the new EPC contract.

 

Under this new contractual scheme, Italfluid has committed to commission the gas processing and liquefaction plant in Q4 2025.

 

Under the EPC Contract, the Operator, the Company and Morocco's L'Office National des Hydrocarbures et des Mines ("ONHYM") have now agreed to pay, over a period of time, US$ 25 million in exchange for a substantial reduction in operating cost and the removal of the daily rental fees:

 

· US$ 18 million following a payment schedule in line with the actual work progress, with staged payments through gas processing plant commissioning,

· US$ 7 million paid once the plant is fully commissioned.,

· Removal of the daily rental fees of US$ 38,000 per day

 

In parallel, the parties are currently preparing an Operations and Maintenance Contract with Italfluid in order to ensure that the plant will continue to meet the required production targets in terms of plant availability, performance and LNG delivery.

 

The shift in contracting methodology from a Lease Agreement to an EPC Contract will result in an increase of the Net Present Value of the project and provides the Operator with greater control to achieve the goal of delivering LNG sales in Q4 2025. The Company will continue to provide support services to the Operator as required under the existing Technical Services Agreement between them.

 

Graham Lyon, Executive Chairman of Sound Energy, commented:

 

"Sound Energy is pleased that ManaEnergy has identified and executed improvements in project delivery and project economics. The transition is going well, and we look forward to drilling activities and gas sales later this year."

 

For further information please visit www.soundenergyplc.com, follow on X @soundenergy[plc, Linkedin or contact :

 

Sound Energy plc

Graham Lyon (Executive Chairman)

chairman@soundenergyplc.com

Flagstaff Strategic and Investor Communications

Tim Thompson, Mark Edwards, Alison Allfrey

sound@flagstaffcomms.com

+44 (0)20 129 1474

Zeus - Nominated Adviser and Broker

James Joyce, Alex Campbell-Harris, Gabriella Zwarts (Investment Banking)

Simon Johnson (Corporate Broking)

+44 (0)20 3829 5000

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSFDFMMEISELD
Date   Source Headline
22nd Dec 202212:30 pmRNSExploration Permit Update
12th Dec 20227:00 amRNSProject Financing Update
29th Nov 20227:00 amRNSMicro LNG Development Progress & Project Contract
2nd Nov 20227:00 amRNSUpdate re Moroccan Tax Administration Notification
31st Oct 20227:00 amRNSProject Financing Update
20th Oct 20221:20 pmRNSUpdate re Exploration Permits
14th Sep 20222:06 pmRNSSecond Price Monitoring Extn
14th Sep 20222:00 pmRNSPrice Monitoring Extension
14th Sep 20221:47 pmRNSUpdate re Moroccan Tax Administration Notification
7th Sep 20227:00 amRNSHalf-year Report
9th Aug 20227:00 amRNSFinancing Update, Farm-Out Process and Exploration
13th Jul 20227:00 amRNSUpdate re Sound Energy Morocco East Moroccan Tax
30th Jun 202212:33 pmRNSTotal Voting Rights
28th Jun 20222:51 pmRNSResult of AGM
23rd Jun 20227:00 amRNSAppointment re Tendrara Development Financing
8th Jun 20222:05 pmRNSSecond Price Monitoring Extn
8th Jun 20222:00 pmRNSPrice Monitoring Extension
8th Jun 202211:53 amRNSFundraise to raise £4 million
31st May 20223:00 pmRNSTotal Voting Rights
19th May 20229:06 amRNSSecond Price Monitoring Extn
19th May 20229:00 amRNSPrice Monitoring Extension
18th May 20224:41 pmRNSSecond Price Monitoring Extn
18th May 20224:36 pmRNSPrice Monitoring Extension
6th May 20221:27 pmRNSBlock Admission
5th May 20227:00 amRNSUpdated Corporate Presentation
3rd May 20224:42 pmRNSNew LTIP, Award of Options and Issue of Equity
19th Apr 20229:00 amRNSPublication of Annual Report and Notice of AGM
14th Apr 20229:05 amRNSSecond Price Monitoring Extn
14th Apr 20229:00 amRNSPrice Monitoring Extension
14th Apr 20227:00 amRNSOperational and Strategic Update
8th Apr 20221:25 pmRNSForm 8.5 (EPT/NON-RI)
8th Apr 20227:00 amRNSRe Sound and Termination of FSP
8th Apr 20227:00 amRNSRe: Possible Offer for Angus Energy
7th Apr 20229:50 amRNSForm 8.5 (EPT/NON-RI)
6th Apr 20229:17 amRNSForm 8.5 (EPT/NON-RI)
30th Mar 20229:45 amRNSForm 8.5 (EPT/NON-RI) - Sound Energy PLC
29th Mar 202211:22 amRNSForm 8.5 (EPT/NON-RI)
24th Mar 20227:00 amRNSFinal Results
18th Mar 20228:35 amRNSForm 8.5 (EPT/NON-RI)
17th Mar 202210:14 amRNSForm 8.5 (EPT/NON-RI)
16th Mar 20228:48 amRNSForm 8.5 (EPT/NON-RI)
14th Mar 20223:39 pmRNSPhase 2 - Pipeline Interconnection Agreement
14th Mar 20228:27 amRNSForm 8.5 (EPT/NON-RI)
11th Mar 20221:00 pmRNSOffer Update - Further Extension to PUSU Deadline
11th Mar 20228:33 amRNSForm 8.5 (EPT/NON-RI)
10th Mar 20229:23 amRNSForm 8.5 (EPT/NON-RI)
9th Mar 20227:00 amRNSUpdate re Phase 2 Tendrara Development GSA
8th Mar 20229:01 amRNSForm 8.5 (EPT/NON-RI)
16th Feb 20227:00 amRNSPhase 1 Development – Issue of Notice to Proceed
15th Feb 20228:40 amRNSForm 8.5 (EPT/NON-RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.