Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSound Energy Regulatory News (SOU)

Share Price Information for Sound Energy (SOU)

Share Price is delayed by 15 minutes
Get Live Data
1.80    0.00 (0.00%)
Bid:
1.70
Ask:
1.90
Spread: 0.20 (11.765%)
Market Cap: £4.11m
SOU Live PriceLast checked at - London Stock Exchange

Intraday Sound Energy Share Chart

Operations Update

10 Jul 2012 07:00

RNS Number : 2684H
Sound Oil PLC
10 July 2012
 



10 July 2012

 

Sound Oil plc

("Sound Oil" or "the Company")

 

Operations Update - Indonesia

 

Sound Oil, the upstream oil and gas company with assets in Italy and Indonesia, is pleased to announce the following update on its operations in Indonesia.

 

Citarum PSC, Java (Sound Oil 20%)

 

The Operator of the Citarum block has released a detailed update on the Jatayu-1 exploration well. A 7" casing has been successfully installed in the present sidetrack immediately above the gas-bearing section encountered in a previous sidetrack where some 390 feet of gross gas-bearing section has been recognized below 5530 ft TVD (true vertical depth). This interval displayed extremely high mud log gas readings and approximately 600 psi overpressure. Gas shows were still present at the bottom of the previous sidetrack at approximately 5920 ft TVD, when the drill-pipe stuck. This required the present sidetrack to be drilled. It is the intention now to drill ahead below the casing to approximately 6000 ft TVD and obtain wireline logs over the section of interest. Dependent on logging results a decision will be taken as to whether to target the Parigi objective, some 1700 feet deeper, or to stop drilling and test the well.

 

Bangkanai PSC, Java (Sound Oil 5%)

 

The Operator has reported to partners that mobilization of the drilling rig for the Kerendan field development and West Kerendan exploration well is ongoing following some minor delays in shipping the equipment along the Barito River to the Luwe Hulu staging area in Kalimantan. The rig is now 40% rigged-up and operations are expected to start in August.

 

 

Gerry Orbell, Sound Oil's Chairman and Chief Executive commented:

 

"The Jatayu prospect is proving a significant exploration project for Sound. Already we have encountered a gross gas column comparable with some of the larger surrounding fields in a secondary objective above the main target zone. The successful installation of the liner has isolated the problematic section which necessitated the previous sidetrack operations. The Jatayu well will be followed by exploration wells at Geulis and Cataka on the Citarum permit, all of which will be drilled by the same rig.

 

We are pleased that the Kerendan project is now progressing satisfactorily. The operations in central Kalimantan present some challenging logistics and we are very pleased that our Operator is now bringing this project to the execution phase".

 

 

For further information please contact:

 

Sound Oil

Gerry Orbell, Chairman & Chief Executive

Michael Cope, Chief Operating Officer

 

Tel: +44 (0)1372 365745

 

Smith & Williamson - Nominated Adviser

Azhic Basirov

David Jones

 

Tel: +44 (0)20 7131 4000

Investec - Broker

David Flin

 

Tel: +44 (0)20 7597 4000

Buchanan - Financial PR

Tim Thompson

Ben Romney

Helen Chan

 

Tel: +44 (0)20 7466 5000

 

 

Notes:

 

1. The full text of the Citarum section of the Pan Orient operations update released on 9 July 2012 stated:

 

"Since the last operations update, the Jatuyu-1 well was drilled to a depth of approximately 5,920 feet true vertical depth ("TVD"). Strong over pressure estimated at approximately 600 psi and extremely high mud gas readings of up to 80% were observed between approximately 5,530 and 5,920 feet TVD with difficulty maintaining adequate mud weight from 5,631 feet due to the influx of gas. This section drilled was inter bedded sandstone and shale with an inferred gas column based on the mud log data of approximately 390 feet. Some of the best gas shows were encountered at the bottom of the drilled section. While conducting a wiper trip from 5,920 feet the drill string became stuck and was backed off to 5,300 feet TVD.

 

After sidetracking, the well was drilled to a depth of approximately 5,500 feet TVD and 7" casing was set just above the interval where high mud gas and overpressure was encountered in the previous well bore. We will be drilling ahead through the zone of high mud gas readings starting within the next 24 hours and stop drilling at approximately 6,000 feet TVD to log the well. A decision to continue drilling an additional 1,700 feet down to the main Parigi reservoir target will be made after the analysis of the wireline logs. The possibility exists that we may decide to stop drilling and immediately test the well.

 

We are very encouraged by: 1) the indications of gas and reservoir we have observed in this well thus far, and 2) the fact we were still drilling within sands with high mud gas readings at 5,920 feet TVD when the drill pipe became stuck, suggesting a possible gas column of 390 feet that we appear yet to have encountered the base of.

 

A number of initiatives have been implemented with regard to personnel and present / future well design in order to best deal with the difficult drilling that has been experienced to date.

 

Total firm capital expenditures at the Citarum PSC are estimated at approximately US$16.6 million for the remainder of the three well program, excluding testing."

 

2. The information contained in this announcement has been reviewed by Sound Oil's Chief Operating Officer, Dr M. J. Cope BSc PhD CGeol FGS, a qualified petroleum geologist.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCRLMPTMBMMBPT
Date   Source Headline
25th Mar 20197:00 amRNSTendrara: Update on TE-7 Connected Gas Volume
21st Mar 20197:00 amRNSFinal Results
7th Mar 20197:00 amRNSUpdate re Gas Sales Agreement
28th Feb 20192:30 pmRNSTotal Voting Rights
18th Feb 20197:00 amRNSTE-10: Net Pay Upgrade and Volume Estimates
28th Jan 20197:00 amRNSEastern Morocco Operations Update
25th Jan 20194:40 pmRNSSecond Price Monitoring Extn
25th Jan 20194:35 pmRNSPrice Monitoring Extension
7th Jan 20197:00 amRNSEastern Morocco: Further TE-10 Update
2nd Jan 20193:00 pmRNSTotal Voting Rights
27th Dec 20187:00 amRNSEastern Morocco: TE-10 Drilling Update
12th Dec 20187:00 amRNSChange of Adviser following Acquisition
7th Dec 20187:00 amRNSEastern Morocco: Commencement of Drilling at TE-10
30th Nov 20181:44 pmRNSTotal Voting Rights
23rd Nov 20187:00 amRNSIssue of Equity
19th Nov 20187:00 amRNSEastern Morocco: TE-9 Results
14th Nov 20183:27 pmRNSTE-9 Total Depth (RNS Reach)
5th Nov 20187:00 amRNSTE-9 Second Casing Point (RNS Reach)
31st Oct 20183:00 pmRNSTotal Voting Rights
26th Oct 20187:00 amRNSTE-9 First Casing Point (RNS Reach)
17th Oct 20187:00 amRNSEastern Morocco: Commencement of Drilling at TE-9
16th Oct 20187:00 amRNSGreater Tendrara Petroleum Agreement
11th Oct 201811:14 amRNSShare Price Movement and Operational Update
1st Oct 20185:29 pmRNSTVR and Block Admission Interim Review
26th Sep 201810:17 amRNSDirector/PDMR Shareholding and Issue of Equity
13th Sep 20187:00 amRNSHalf-year Report
6th Sep 20187:00 amRNSEastern Morocco: Award of Production Concession
31st Aug 20182:25 pmRNSTotal Voting Rights
31st Aug 20187:00 amRNSEastern Morocco: New Petroleum Agreement
21st Aug 20187:00 amRNSEastern Morocco: Seismic completion
13th Aug 20187:00 amRNSTE-9: Rig Mobilisation
1st Aug 20184:42 pmRNSTotal Voting Rights
24th Jul 20187:00 amRNSTE-9: Commencement of Civil Works
23rd Jul 20187:00 amRNSUpdate re Eastern Morocco
11th Jul 20187:00 amRNSDirectorate Change
2nd Jul 20187:00 amRNSPlacing and TVR
29th Jun 20187:00 amRNSEastern Morocco: New Basin Model
15th Jun 20187:00 amRNSTE-9 Well Location
8th Jun 20187:00 amRNSEastern Morocco: Concession Application
7th Jun 20187:01 amRNSEastern Morocco: FEED Award
6th Jun 20187:00 amRNSTendrara: EIA Approval for TE-9 and TE-10
5th Jun 20187:00 amRNSSidi Moktar: Ministry Approval & Farm Out Process
4th Jun 20187:00 amRNSFinal CPR: A1 Prospect (TE-9)
31st May 20184:25 pmRNSTotal Voting Rights
24th May 20182:17 pmRNSResult of AGM
14th May 20187:00 amRNSDirectorate Change
30th Apr 20183:00 pmRNSTotal Voting Rights
30th Apr 20182:21 pmRNSDirector/PDMR Shareholding
26th Apr 20185:27 pmRNSIssue of Equity, LTIP and PDMR Shareholdings
26th Apr 20187:00 amRNSPreliminary Competent Person?s Report: A1 Prospect

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.