Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSound Energy Regulatory News (SOU)

Share Price Information for Sound Energy (SOU)

Share Price is delayed by 15 minutes
Get Live Data
2.15    0.15 (7.50%)
Bid:
2.00
Ask:
2.30
Spread: 0.30 (15.00%)
Market Cap: £4.91m
SOU Live PriceLast checked at - London Stock Exchange

Intraday Sound Energy Share Chart

JV for Solar

17 Jun 2025 07:00

RNS Number : 0674N
Sound Energy PLC
17 June 2025
 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulation ("MAR") (EU) No. 596/2014, as incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

17 June 2025

Sound Energy plc

 

("Sound Energy", the "Company" and together with its subsidiary undertakings the "Group")

 

Proposed Joint Venture to Evaluate and Develop, 200 MW Photovoltaic ("PV") Solar Power Projects in Morocco

 

Sound Energy, the transition energy company, is pleased to announce that it has signed an exclusive term sheet with Gaia Energy Ltd. ("Gaia"), a specialist in renewable energy, for the development of up to 270 MW of installed capacity of PV solar power at various locations in Morocco.

 

Taking advantage of the liberalised medium voltage ("MV") grid in Morocco, the Company and Gaia propose to enter into a Joint Venture and aim to construct solar power sites at ten or more locations close to MV substations and therefore customers. Gaia has commenced feasibility studies at a number of sites. Such studies include measurement and modelling of solar irradiation, land access studies, grid connection and capacity assessments. The next steps, upon formalisation of the JV, are to carry out the formal applications for grid capacity, other regulatory requirements, and negotiation of power purchase agreements ("PPAs").

 

Further announcements will be made, as appropriate, in due course.

For further information visit www.soundenergyplc.com follow on X @soundenergyplc, LinkedIn, or contact:

 

Sound Energy

Graham Lyon, Executive Chairman

 

chairman@soundenergyplc.com

Flagstaff Strategic and Investor Communications

Tim Thompson

Mark Edwards

Alison Allfrey

Tel: 44 (0)20 129 1474

sound@flagstaffcomms.com

Zeus - Nominated Adviser and Broker

James Joyce, Alex Campbell-Harris, Gabriella Zwarts (Investment Banking)

Simon Johnson (Corporate Broking)

 

Tel: 44 (0)20 3829 5000

 

Background

It is well documented that Morocco has aggressive aspirations to displace its fossil fuel consumption with cleaner energy, and to reduce its dependency on imports. Morocco remains connected to the European grid via Spain and just earlier this year there was a reported surge in electricity imports. In numbers[1], over 90% of Morocco's Primary Energy consumption in 2023 was fossil fuels (coal, natural gas, and liquids), and of Morocco's approx. 11.5 GW of installed power generation capacity, 60% of this is fuelled by fossil fuels. Surprisingly, just 7% of this installed capacity comes from solar power despite excellent climatic conditions with over 3,100 out of a possible 4,383 hours of sunlight annually (cf, Spain has less than 3,000 hours of sunshine, and the UK has less than 1,500).

 

Add to this, Morocco's infrastructure is being rapidly expanded as it looks forward to hosting two major sporting events, the first later this year, and then in 2030 it will jointly host the FIFA World Cup at six locations including two new-build stadiums in Casablanca and Fez.

 

About Gaia

 

Gaia Energy ltd, is a leading renewable energy international developer and investor with a mission to accelerate the global energy transition in emerging markets. Present in 15 countries, with an extensive pipeline of 10 GW of projects at different stages of development

 

 

 


[1] The Energy Institute's 2023 Statistical Review of World Energy; L'Autorité Nationale de Régulation de l'Electricité (ANRE), National Electricity National Authority, 2023 Annual Report (published December 2024)

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
JVEFFMFTMTABBMA
Date   Source Headline
17th Jul 20155:10 pmRNSWarrantholders Letter
17th Jul 20154:10 pmRNSIssue of Equity & Director's Dealings
16th Jul 20157:00 amRNSProduction Concession Award
3rd Jul 20155:38 pmRNSCompletion of Placing and Director Shareholding
30th Jun 20153:35 pmRNSResult of AGM, TVR and Update re Funding
25th Jun 20152:19 pmRNSShareholdings of Directors
24th Jun 20157:00 amRNSResult of Open Offer
19th Jun 20157:00 amRNSManagement Changes
17th Jun 201510:00 amRNSPosting of Supplementary Circular
16th Jun 20157:00 amRNSDora / Dalla - EIA Approval
16th Jun 20157:00 amRNSNervesa Update & Open Offer Supplementary Circular
8th Jun 20153:00 pmRNSResult of General Meeting
8th Jun 20157:00 amRNSNervesa and Open Offer Update
8th Jun 20157:00 amRNSMoroccan Country Entry - Signature of Farm In
2nd Jun 20157:00 amRNSPosting of Annual Report and Notice of AGM
29th May 20151:00 pmRNSTotal Voting Rights
21st May 20151:00 pmRNSOpen Offer and Notice of General Meeting
20th May 20157:00 amRNSIssue of Equity
20th May 20157:00 amRNSDrilling Update - Nervesa Second Well
18th May 20157:00 amRNSOpen Offer Timetable
11th May 20157:00 amRNSDrilling Update - Nervesa Second Well
11th May 20157:00 amRNSMorocco - Tendrara Licence
29th Apr 201511:00 amRNSDrilling Update - Nervesa Second Well
28th Apr 20151:30 pmRNSPlacing, Issue of Warrants and Intended Open Offer
28th Apr 20157:00 amRNSPreliminary Results
24th Apr 20157:00 amRNSNervesa Second Well - Drilling Commences
17th Apr 20157:00 amRNSNervesa Field - Production Concession
2nd Apr 20157:00 amRNSNew CPR
17th Mar 20157:00 amRNSBadile EIA Approval
17th Feb 20157:00 amRNSNervesa Drilling Authorisation
10th Feb 20157:00 amRNSNervesa Production Concession
22nd Jan 20157:00 amRNSIssue of Equity re RBL Facility
13th Jan 20157:00 amRNSWithdrawal of Intended Offer for Antrim Energy Inc
12th Jan 20157:00 amRNS2014 Production Update
12th Dec 20147:00 amRNSNervesa EIA Final Approval
24th Nov 20147:00 amRNSIntended offer for Antrim Energy Inc.
13th Nov 20147:00 amRNSNervesa Reserve Based Lending - Signature
15th Oct 20144:45 pmRNSHolding(s) in Company
13th Oct 20147:00 amRNSGas Sales Contracts and Badile Land Purchase
23rd Sep 20147:00 amRNSNervesa Reserve Based Lending - Heads of Terms
17th Sep 20147:00 amRNSHalf Yearly Report
8th Sep 20147:00 amRNSDirectorate Change
2nd Sep 20147:00 amRNSNervesa EIA Approval
8th Aug 20143:00 pmRNSLaura and SMG Rig
7th Aug 20147:00 amRNSBadile Land Purchase and Long Lead Items
1st Aug 20147:00 amRNSNervesa Long Lead Items
31st Jul 20143:00 pmRNSTotal Voting Rights
29th Jul 20147:00 amRNSInstitutional Investment
29th Jul 20147:00 amRNSCasa Tiberi First Gas
23rd Jul 20147:00 amRNSInstitutional Investment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.