Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSan Leon Regulatory News (SLE)

  • This share is currently suspended. It was suspended at a price of 16.14

Share Price Information for San Leon (SLE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 16.14
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 16.14
SLE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

16 Sep 2013 07:00

RNS Number : 0221O
San Leon Energy PLC
16 September 2013
 

16 September 2013

San Leon Energy Plc

("San Leon" or the "Company")

Lewino-1G2 Initial Vertical Frac and Test Results

San Leon is pleased to announce it has completed the flow back, testing and initial analysis of its first vertical hydraulic fracture stimulation ("frac") of the Lewino-1G2 well on its 221,000 acre (894 km2) Gdansk W Concession in Poland's northern Baltic Basin. This initial vertical frac was performed to test frackability and the flow potential of the lower Ordovician shale and to gather critical data necessary for future horizontal drilling and multi-staged hydraulic fracture stimulation, targeted on obtaining commercial flow rates from the Ordovician and Lower Silurian shales.

The frac was performed through a 4.5-meter perforated interval, at a depth of 3,545.5 to 3,550 meters, in the highly prospective Ordovician Caradocian shale. The frac pumped over 11,000 barrels of fluid and 95 tons of sand propant at an average of 120 barrels per minute with a maximum pressure of 12,200 psi. This is the highest frac pump rate at pressure ever performed outside the US.

Approximately 25% of the frac fluid was recovered along with a small, consistent flow of burnable gas. The well flared gas on several occasions including initial opening of the well after the frac and following a shut-in period after approximately 20% of the frac fluid was recovered.

Results/Conclusions:

· The Gdansk W Concession is located in the gas/condensate window with excellent gas quality estimated to be 98% burnable gas, including 75% methane (C1), 15% ethane (C2), and 8% C3-C10. Based upon initial results the company expects a modest condensate yield from the formation.

· Due to the depth and other rock properties encountered, the use of larger, high-strength propant will be required in future fracs. The Company believes this, and increased propant concentration in the fracs, will significantly increase fracture conductivity and ultimately provide a significant improvement in flow rates.

· The frac fluid chemistry is being redesigned with the benefit of data received from this first frac, and is expected further to improve productivity.

Based upon the significant amount of data collected in this first frac the Company is planning additional vertical fracs in Lewino-1G2 in the Ordovician, to include a re-fracing at the existing fractured zone. Design peer review work is on-going with several other experienced engineering firms in support of UOS' redesign, including APEX Engineering in the USA and Fenix in The Netherlands.

The Company is also in talks with UOS to design, and execute immediately thereafter, fracs in a 1500-metre horizontal section, which the Company expects to unlock the potential of this play.

The Company estimates ongoing operations to take place in early Q4 2013 subject to final design work and regulatory approvals. The Company has already contracted UOS for the additional work at Lewino as part of its on-going services agreement.

Executive Chairman, Oisin Fanning commented:

"The initial results and data collected at Lewino-1G2 are very encouraging and easily justify continued operations on this concession. The amount of data collected along with the flow of burnable gas from the well is an excellent result for this initial frac and test at Lewino and exceeded our expectations for San Leon's first frac in the basin and further underpins our belief that we are in one of the highest potential blocks in the basin. As is seen throughout North America, each working shale is different, and in fact the same shale formations can vary significantly in the same basin. We are at a critical stage in our shale gas exploration in Poland and we are excited to have flowed gas to surface and to have recovered the necessary information to continue to prove this play. Our knowledge of this system has increased exponentially and we believe has accelerated our understanding of the commercial potential of shale gas production in Poland."

Qualified person

Joel Price, who has reviewed this update, has 19 years' experience in the oil & gas industry and is a member of the Society of Petroleum Engineers. He holds a BA in Natural Sciences from Cambridge University, an MEng from Heriot-Watt University, and an MBA from Durham University. Joel is currently the Head of Engineering for San Leon Energy and is based in San Leon's London office.

For further information contact:

San Leon Energy Plc

Tel: +353 1291 6292

Oisin Fanning, Executive Chairman

Macquarie Capital (Europe) Limited

Tel: +44 (0) 20 3037 2000

John Dwyer

Fox Davies Capital

Tel: +44 (0) 20 3463 5000

Daniel Fox-Davies

Susan Walker

FirstEnergy Capital LLP

Tel: +44 (0) 20 7448 0200

Hugh R. Sanderson

David van Erp

Westhouse Securities (Nominated Advisor)

Tel: +44 (0) 20 7601 6100

Richard JohnsonAntonio Bossi

College Hill Associates

Tel: +44 (0) 20 7457 2020

David SimonsonAlexandra Roper

Plunkett Public Relations

Tel: +353 (0) 1 284 4414 / +353 (0) 87 826 0833

Sharon Plunkett

Jennie Cotter

 

www.sanleonenergy.com 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFVLAAIELIV
Date   Source Headline
19th Apr 201711:15 amRNSMorocco Update
19th Apr 20177:00 amRNSOperating and Corporate Update
4th Apr 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
3rd Apr 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
31st Mar 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
30th Mar 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
29th Mar 20173:38 pmRNSForm 8.3 - San Leon Energy PLC
28th Mar 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
27th Mar 20173:15 pmRNSForm 8.3 - San Leon Energy plc
24th Mar 20173:15 pmRNSForm 8.3 - San Leon Energy plc
23rd Mar 20173:15 pmRNSForm 8.3 - San Leon Energy plc
21st Mar 20174:09 pmRNSForm 8.3 - San Leon Energy plc
20th Mar 20173:15 pmRNSForm 8.3 - San Leon Energy plc
17th Mar 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
15th Mar 20173:00 pmRNSForm 8.3 - San Leon
14th Mar 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
13th Mar 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
10th Mar 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
9th Mar 20174:35 pmRNSPrice Monitoring Extension
7th Mar 20172:23 pmRNSForm 8.3 - San Leon Energy plc
7th Mar 20172:22 pmRNSForm 8.3 - San Leon Energy plc
3rd Mar 20175:36 pmRNSHolding(s) in Company
3rd Mar 20177:00 amRNSHolding(s) in Company
2nd Mar 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
24th Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
23rd Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
22nd Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
22nd Feb 201711:55 amRNSForm 8.3 - San Leon Energy plc
21st Feb 20173:49 pmRNSHolding(s) in Company
21st Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
20th Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
16th Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
15th Feb 20173:15 pmRNSForm 8.3 - San Leon Energy PLC
13th Feb 20173:15 pmRNSForm 8.3 - San Leon Energy PLC
10th Feb 20173:15 pmRNSForm 8.3 - San Leon Energy PLC
10th Feb 20177:00 amRNSHolding(s) in Company
9th Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
8th Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
6th Feb 20173:15 pmRNSForm 8.3 - San Leon Energy PLC
3rd Feb 20173:00 pmRNSForm 8.3 - San Leon Energy PLC
1st Feb 20173:00 pmRNSToscafund Asset Management LLP Form 8.3- San Leon
27th Jan 20173:15 pmRNSToscafund Asset Management LLP Form 8.3- San Leon
26th Jan 20173:15 pmRNSToscafund Asset Management LLP Form 8.3- San Leon
20th Jan 20172:50 pmRNSToscafund Asset Management Form 8.3- San Leon
17th Jan 20172:37 pmRNSExercise of options and issue of shares
10th Jan 20173:20 pmRNSToscafund Asset Management Form 8.3- San Leon
9th Jan 20173:20 pmRNSToscafund Asset Manangement Form 8.3- San Leon
4th Jan 20173:24 pmRNSToscafund Asset Manangement Form 8.3- San Leon
3rd Jan 20173:20 pmRNSToscafund Asset Management Form 8.3 - San Leon
30th Dec 20167:15 amRNSForm 8.3 - San Leon Energy PLC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.