Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSLE.L Regulatory News (SLE)

  • There is currently no data for SLE

Barryroe update

10 Oct 2012 08:28

RNS Number : 3579O
San Leon Energy PLC
10 October 2012
 



10 October 2012

 

San Leon Energy Plc

("San Leon" or the "Company")

Barryroe Update

San Leon, the specialist oil and gas company with an extensive portfolio of assets across Europe and North Africa, notes this morning's announcement from Providence Resources plc ("Providence") of the technical update by Providence on the Barryroe oil discovery in the North Celtic Sea Basin, offshore Ireland. San Leon announced, on 23 December 2011, that the Company has assigned its 30% working interest in Standard Exploration Licence 1/11 to Providence in exchange for a 4.5% NPI on the full field. San Leon Energy will not pay any further appraisal or development costs on the Licence.

The full announcement by Providence stated the following:

TECHNICAL UPDATE

Barryroe Oil FieldReservoir Analysis Update

·; STATIC & DYNAMIC BASAL WEALDEN RESERVOIR ANALYSIS RESULTS

o MODELLED RECOVERY FACTORS OF 17-43% UTILISING HORIZONTAL PRODUCTION & WATER INJECTION WELLS

o MODELLED RECOVERY FACTOR OF 31% TO BE USED FOR DEVELOPMENT PLANNING

·; DEVELOPMENT CONCEPT ENGINEERING CONTRACT AWARDED

Providence Resources P.l.c., ("Providence") the Irish oil and gas exploration and development company, whose shares are quoted in London (AIM) and Dublin (ESM), is pleased to provide a further update on its Barryroe oil field in the North Celtic Sea Basin, offshore Ireland. Providence (80%) operates Barryroe on behalf of its partner Lansdowne Oil and Gas plc (20%). The area is located in Standard Exploration Licence (SEL) 1/11 and Licensing Option (LO) 12/4, situated in c. 100 m water depth and is c. 50 km off the south coast of Ireland.

Providence has recently undertaken static and dynamic modelling of the main Basal Wealden oil bearing reservoir interval. This work, carried out by RPS Energy on behalf of the Barryroe partners, incorporated the data from all five Basal Wealden reservoir penetrations, together with maps derived from the recent 3D seismic survey. This study has established oil recovery factors which range from 17% to 43%. Based on a development scenario involving 41 horizontal production and 22 horizontal water-injection wells over a 25 year field life, a recovery factor of 31% is modeled. These horizontal producer and injector wells are designed to be 600m in length, with the producers incorporating gas lift.

Providence is also pleased to announce that the Barryroe Concept Development Engineering Study contract has been awarded to Procyon Oil & Gas. This study will evaluate a number of preferred development options which were high-graded during the recently completed development screening study.

Speaking today, John O'Sullivan Technical Director of Providence said;

"These reservoir and dynamic modelling studies have identified significant productive potential in the Basal Wealden reservoir, which is consistent with the test and other data that we have previously announced. These results will now be factored into our ongoing field pre-development work where we have kicked off a key engineering study to identify and select the optimum development concept. As part of this study, we will obviously consult and solicit feedback from both regulatory and local stakeholders on an ongoing basis."

 For further information contact:

 

 

San Leon Energy plc

+353 1291 6292

Oisin Fanning, Executive Chairman

Westhouse Securities Limited

+44 (0) 20 7601 6100

Richard Johnson

Antonio Bossi

Macquarie Capital (Europe) Limited

+44 (0) 20 3037 2000

John Dwyer

Fox Davies Capital

+44 (0) 20 3463 5000

Daniel Fox-Davies

Richard Hail

FirstEnergy Capital LLP

+44 (0) 20 7448 0200

Hugh R. Sanderson

David Van Erp

College Hill Associates

+44 (0) 20 7457 2020

Nick Elwes

Alexandra Roper

 

 

www.sanleonenergy.com

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLIFFDISLILIF
Date   Source Headline
29th Nov 20113:21 pmRNSExercise of Options
17th Nov 20117:00 amRNSLewino 1G-2 Drilled
11th Nov 20115:47 pmRNSCompletion of acquisition
11th Nov 20119:52 amRNSCommencement of drilling
10th Nov 20115:10 pmRNSAdmission of new shares re Realm
2nd Nov 20119:10 amRNSRealm Energy shareholder approval
21st Oct 20113:15 pmRNSResults of Belvedere-1 Well
19th Oct 20117:44 amRNSBarryroe Update
18th Oct 20112:30 pmRNSNew Licencing Option
12th Oct 20113:48 pmRNSSpudding of Belvedere-1 Well
12th Oct 201110:11 amRNSRealm Energy Acquisition Update
5th Oct 201112:30 pmRNSHolding(s) in Company
3rd Oct 20115:10 pmRNSDirector/PDMR Shareholding
30th Sep 20117:00 amRNSInterim Results
29th Sep 20117:00 amRNSResults of Chopin-1 Well
26th Sep 20111:04 pmRNSCommencement of drilling
23rd Sep 201112:29 pmRNSResult of AGM
21st Sep 201111:34 amRNSRealm Energy Announcement
5th Sep 20113:17 pmRNSCommencement of drilling
1st Sep 201111:06 amRNSBelvedere -1 exploration well
31st Aug 20119:47 amRNSInvestor Presentation
26th Aug 20118:35 amRNSAcquisition of Realm Energy
12th Aug 20114:35 pmRNSPrice Monitoring Extension
2nd Aug 20117:00 amRNSCompletion of 3D Seismic
29th Jul 20117:00 amRNSDrilling Update
19th Jul 20112:09 pmRNSAdditional Listing
30th Jun 20117:00 amRNSFinal Results
23rd Jun 201110:12 amRNSOperational update
14th Jun 201110:13 amRNSHolding(s) in Company
3rd May 201111:14 amRNSCommencement of Seismic Survey
29th Mar 20117:00 amRNSOperational Update
23rd Mar 20112:28 pmRNSAdditional Listing
22nd Mar 20117:00 amRNSJoint Participation Agreement
18th Mar 20118:35 amRNSCommencement of Seismic Servey
10th Mar 20117:00 amRNSRockall Licence Update
2nd Mar 201110:18 amRNSHolding(s) in Company
8th Feb 20114:18 pmRNSAdditional Listing
4th Feb 20117:00 amRNS3D Seismic Survey Completed
3rd Feb 20117:28 amRNSReplacement: Durresi Licence Approval
3rd Feb 20117:00 amRNSDurresi Licence Approval
26th Jan 20119:50 amRNSAdditional Listing
18th Jan 20117:00 amRNSHolding(s) in Company
14th Jan 20117:00 amRNSApproval received
12th Jan 20114:44 pmRNSHolding(s) in Company
12th Jan 20117:00 amRNSRockall licence update
6th Jan 20112:14 pmRNSBoard Changes
5th Jan 201112:11 pmRNSHolding(s) in Company
31st Dec 20108:12 amRNSCompletion of Placing
30th Dec 201012:40 pmRNSResult of EGM
22nd Dec 20104:49 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.