Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksShanta Gold Regulatory News (SHG)

Share Price Information for Shanta Gold (SHG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 14.75
Bid: 14.70
Ask: 14.80
Change: 0.00 (0.00%)
Spread: 0.10 (0.68%)
Open: 14.70
High: 14.75
Low: 14.70
Prev. Close: 14.75
SHG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

West Kenya Drilling Update

23 May 2022 07:00

RNS Number : 3976M
Shanta Gold Limited
23 May 2022
 

23 May 2022

Shanta Gold Limited

("Shanta Gold" or the "Company")

 

West Kenya Drilling Programme Identifies Exceptional High-Grade Areas

 

Shanta Gold (AIM: SHG), the East Africa-focused gold producer, developer and explorer, is pleased to provide an exploration update for the West Kenya Project ("West Kenya") in Kenya.

Eric Zurrin, Chief Executive Officer, commented:

"The latest phase of drilling at West Kenya has continued to deliver outstanding results, ensuring that this remains the most consistently high-grade drilling programme we've ever conducted at any asset in Shanta's history. With visible gold at three of the five holes reported today, and one showcasing grades of 46.7 g/t across a width of 14 metres at less than 150 metres vertical depth, these results are indicative of the vast potential with spectacular grades that West Kenya offers in the Shanta Gold growth story.

The primary focus during the 2021 drilling campaign was to upgrade the high-grade Mineral Resource at Isulu and Bushiangala, and I am pleased to report that we succeeded in achieving this, converting 348,000 oz grading 11.7 g/t to Indicated Resources earlier this year. The programme is at the second phase that targets all the zones to approximately 550 metres below surface and we expect to further increase the Indicated Resources in 2022 across the West Kenya project while expanding the total Mineral Resource size.

Having just started work on the feasibility study workstream earlier this month, this is a hugely exciting time for the Company and our stakeholders as the West Kenyan resource expands toward a multi-million ounce gold district comparable with other prolific greenstone belts in the world."

Highlights:

· Phase 2 drilling programme aimed at converting resources to Indicated at Isulu-Bushiangala; in addition, drilling has also now expanded to district targets at Ramula and adjacent anomalies;

· This update relates to 2,286 metres ("m") of drilling across 5 holes conducted in Q1 2022 at the Isulu and Bushiangala deposits;

· Drilling intersection highlights include:

Hole No.

Interval (m)

Au (g/t)

From (m)

To (m)

Bushiangala deposit

336

13.8

46.7

143.0

156.8

Incl

0.5

1,015.3

149.2

149.7

Incl

4.0

19.2

151.3

155.3

334

6.0

8.6

39.6

45.6

334

4.5

10.3

99.6

104.1

334

4.5

6.6

112.0

116.5

Isulu deposit

327

1.6

11.7

624.9

626.5

incl

0.5

35.9

625.4

625.9

328

3.9

7.1

545.2

549.1

329

10.8

4.8

590.2

601.0

incl

1.0

24.3

600.0

601.0

Note: true width estimated at 60-70% of the intercept core length and gold values uncapped

· Visible gold was identified in 3 intersections across 5 holes drilled. Visible gold, including spectacular occurrences, has been identified in 38 intersections across 107 holes drilled to date;

· Intersections reported today include the fourth set of results received from Phase 2 of the ongoing drilling campaign, which is targeting up to 550 vertical metres below surface.

Isulu and Bushiangala Drilling Campaign

This infill drilling is aimed at verifying the extent and geometry of the known mineralised zones developed for the current resource model. Shanta has now completed 51% of total planned drilling at West Kenya as at the end of April 2022. 40% of total planned drilling over three phases has now been reported.

 

Gold mineralisation at the Project is hosted by sheared pillowed to massive basalts, bounded between ultramafic volcanics and polymictic conglomerates on one side and carbonaceous mudstones and sandstones on the other side. The deposits occur within the Liranda Corridor area, a 12 km structural trend located on the eastern limb of a broad synclinal structure intruded in the centre by granitoids and diorites, termed the Kakamega Dome. Mineralisation is associated with quartz, quartz-carbonate veinlets within the mineralised shear zones ranging from 0.5 m to 10 m in true width. The mineralisation style is classified as orogenic, shear-zone-hosted quartz-carbonate vein subtype. The strike lengths of the steeply-dipping zones vary between 350 m and 650 m.

 

Phase 1 drilling at the Project, completed in June 2021, sought to infill two modelled zones at Isulu (IZ1.0 and IZ3.0) and three modelled zones at Bushiangala (BZ1, BZ2 and BZ3). This drilling was carried out to generate an average spacing of 40 m at Isulu and 30 m at Bushiangala, up to a depth of 150-200 m from surface, and targeted both oxides and sulphides within these zones. Following the completion of Phase 1 drilling, an updated mineral resource estimate was announced in September 2021.

 

Phase 2 of the ongoing diamond drilling campaign at the Project is seeking to infill 20 modelled zones at Isulu and 23 modelled zones at Bushiangala. This drilling phase amounts to 75,000 m of planned drilling and is due to be completed in Q4 2022. Phase 2 drilling is expected to generate an average spacing of 40 m at Isulu and 30 m at Bushiangala, up to a depth of 450-550 m from surface. Following the completion of 2021 drilling the Isulu and Bushiangala modelled zones were updated, and an updated mineral resource estimate was announced in March 2022.

 

Assay results shown below are those for 5 diamond drill holes, received since the Company's most recent exploration update in March 2022. To date this takes the total number of holes with assays returned to 107, for the current drilling campaign. The lengths shown are the down hole metres and it is estimated that the true widths of the mineralized zones are approximately 60-70% of the widths intersected in the drill holes. All assays are reported without application of a top cut. Composited assay results for these 5 drill holes are tabulated below. Samples were analysed at an accredited laboratory operated by MSALABS, an independent third party:

 

Drill Hole

Interval (m)

Au (g/t)

From (m)

To (m)

Prospect

LCD0327

1.6

11.71

624.9

626.5

Isulu

including:

0.5

35.91

625.4

625.9

2.3

1.15

631.7

634.0

LCD0328

1.0

1.47

364.3

365.3

Isulu

4.1

0.47

479.7

483.8

including:

0.9

1.17

482.9

483.8

1.7

2.50

493.7

495.4

3.9

7.06

545.2

549.1

including:

1.0

14.21

545.2

546.2

0.6

2.19

566.0

566.6

LCD0329

0.5

1.10

178.9

179.4

Isulu

0.5

8.00

385.7

386.2

0.5

16.36

391.0

391.5

1.7

5.59

449.2

450.9

10.8

4.76

590.2

601.0

including:

1.1

10.20

598.0

599.1

including:

 

 

 

1.0

24.30

600.0

601.0

LCD0334

6.0

8.56

39.6

45.6

Bushiangala

including:

1.5

25.69

44.1

45.6

4.5

0.87

89.1

93.6

4.5

10.28

99.6

104.1

including:

1.5

26.16

102.6

104.1

4.5

6.63

112.0

116.5

including:

1.5

11.30

113.0

114.5

1.0

1.05

120.0

121.0

LCD0336

1.5

1.54

0.7

2.2

Bushiangala

1.5

5.29

51.7

53.2

1.5

1.92

62.2

63.7

13.8

46.69

143.0

156.8

including:

0.5

1015.30

149.2

149.7

including:

 

 

 

4.0

19.21

151.3

155.3

 

 

Results reported today represents new information received since the Company's previous exploration update released 28 February 2022.

 

 

Shanta Gold Limited

 

Eric Zurrin (CEO)

 +44 (0) 14 8173 2153

Luke Leslie (CFO)

 

 

 

Nominated Adviser and Joint Broker

 

Liberum Capital Limited

 

Scott Mathieson / Ed Thomas / Nikhil Varghese

 +44 (0) 20 3100 2000

 

 

Joint Broker

 

Tamesis Partners LLP

 

Charlie Bendon / Richard Greenfield

 +44 (0) 20 3882 2868

 

 

Public Relations

 

FTI Consulting

 

Sara Powell / Nick Hennis

+44 (0) 20 3727 1426

 

 

The technical information contained in this announcement was reviewed Yuri Dobrotin, P.Geo. Membership No.0702 (Shanta's Group Exploration Manager), who is a practicing member of the Association of Professional Geoscientists of Ontario, Canada (PGO).

Mr Dobrotin has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined for the purposes of the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009, and National Instrument 43-101 (''NI 43-101").

 

About Shanta Gold

 

Shanta Gold is an East Africa-focused responsible gold producer, developer, and explorer. The company has an established operational track record, with defined ore resources on the New Luika and Singida projects in Tanzania, with reserves of 645 koz grading 3.0 g/t, and exploration licences covering approximately 1,100 km2 in the country. Alongside New Luika and Singida, Shanta also owns the high-grade West Kenya Project in Kenya and licences with resources of 1.6 million ounces including 378 koz in the Indicated category grading 11.70 g/t. With a strong balance sheet, a growing diversified portfolio and a maiden dividend paid in 2021, Shanta offers a resilient investment opportunity for the near and long-term. Shanta is quoted on London's AIM market (AIM: SHG) and has approximately 1,048 million shares in issue.

 

END

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLZXLBLLELLBBD
Date   Source Headline
17th Oct 20197:00 amRNSQ3 2019 Production & Operational Update
1st Oct 20197:00 amRNSNew Luika Gold Mine Exploration Update
25th Sep 20192:00 pmRNSPrice Monitoring Extension
30th Aug 20197:00 amRNSTotal Voting Rights
12th Aug 20197:00 amRNSInterim results
7th Aug 20197:00 amRNSSingida $10m Asset Level Financing & Update
23rd Jul 20197:00 amRNSIlunga Underground Achieves Commercial Production
18th Jul 20197:00 amRNSQ2 2019 Production & Operational Update
15th Jul 20197:00 amRNSNew Luika Gold Mine Resource Upgrade
20th Jun 20197:00 amRNSBauhinia Creek Phase 2 Drilling Update
18th Jun 20199:00 amRNSBlocklisting Six Monthly Return
16th May 201912:05 pmRNSCompletion of buyback of convertible loan notes
7th May 20197:00 amRNSBauhinia Creek Central Drilling Update
24th Apr 20191:22 pmRNSResult of Annual General Meeting
18th Apr 20197:00 amRNSQ1 2019 Production & Operational Update
10th Apr 20192:28 pmRNSConfirmation of buyback $5m convertible loan notes
29th Mar 20197:00 amRNSSingida Financing Update
18th Mar 20193:43 pmRNSPosting of Annual Report and Notice of AGM
13th Mar 20194:40 pmRNSSecond Price Monitoring Extn
13th Mar 20194:35 pmRNSPrice Monitoring Extension
13th Mar 20199:05 amRNSSecond Price Monitoring Extn
13th Mar 20199:00 amRNSPrice Monitoring Extension
11th Mar 20197:00 amRNSIlunga Underground First Ore Intersected
8th Mar 20198:27 amRNSHolding(s) in Company
7th Mar 20198:56 amRNSHolding(s) in Company
28th Feb 20193:00 pmRNSDirector Dealing and Issue of Equity
28th Feb 20197:00 amRNSFinal Results for the year ended 31 December 2018
18th Jan 20197:00 amRNSPartial Buyback Of Convertible Loan Notes
17th Jan 20197:00 amRNSQ4 2018 Production & Operational Update
24th Dec 201812:40 pmRNSSecond Price Monitoring Extn
24th Dec 201812:35 pmRNSPrice Monitoring Extension
18th Dec 20187:00 amRNSBlocklisting Six Monthly Return
14th Dec 20183:00 pmRNSDirector/PDMR Shareholding
6th Dec 20189:13 amRNSHolding(s) in Company
5th Dec 20187:00 amRNSSingida NPV and Project Update
24th Oct 20187:00 amRNSDirector/PDMR Shareholding
18th Oct 20187:00 amRNSQ3 2018 Production & Operational Update
11th Oct 20187:00 amRNSNew Luika Gold Mine Exploration Update
3rd Sep 20187:00 amRNSOperations update
16th Aug 20187:00 amRNSInterim results
20th Jul 20182:11 pmRNSBlocklisting Six Monthly Return
19th Jul 20187:00 amRNSQ2 2018 Production & Operational Update
18th Jul 20187:00 amRNSPhase 1 Drilling Update - High Grade Intercepts
10th Jul 20187:00 amRNSTotal Annualised Cost Reductions Fully Executed
9th Jul 20187:00 amRNSDirector/PDMR Shareholding
27th Jun 20187:00 amRNSPassing of Written Resolutions
14th Jun 20187:00 amRNSPartial buyback & rollover of loan notes
13th Jun 201812:37 pmRNSResult of Annual General Meeting
4th Jun 20182:30 pmRNSHolding(s) in Company
4th Jun 20187:00 amRNSNew JORC Resource Estimate & Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.