Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksShanta Gold Regulatory News (SHG)

Share Price Information for Shanta Gold (SHG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 14.75
Bid: 14.70
Ask: 14.80
Change: 0.00 (0.00%)
Spread: 0.10 (0.68%)
Open: 14.76
High: 14.76
Low: 14.74
Prev. Close: 14.75
SHG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Singida NPV and Project Update

5 Dec 2018 07:00

RNS Number : 4287J
Shanta Gold Limited
05 December 2018
 

5 December 2018

 

Shanta Gold Limited

 

("Shanta Gold", "Shanta" or the "Company")

 

Singida NPV and Project Update

 

Shanta Gold (AIM: SHG), the East Africa-focused gold producer, developer and explorer, is pleased to announce project economics for the Singida Gold Mining Project ("the Project") in central Tanzania.

 

Project highlights

 

· Average annual production from open pit mining of 26,000 oz for an initial six year period;

· Expected to increase Shanta Gold's total gold production to over 100,000 oz pa from first full year of production;

· Pre-production capex requirement of US$16 million ("m") and US$3 m for working capital;

· Net Present Value ("NPV") of US$31 m and IRR of 67%, at an 8% discount rate and using the current gold forward curve;

· Life of Project Cash Cost of US$794 /oz;

· Project economics are based on internally prepared management estimates using the Singida Internal Owners Team and have not been independently verified;

· Significant further upside potential through the inclusion of substantial resources currently sitting outside the project economics;

· Geophysics to test continuity between Corn Patch and Corn Patch West targets recently completed, results currently being interpreted;

· Most key infrastructure requirements in place including water, Tanesco grid power, resettlement and an operating camp;

· Singida ESIA expected by Q1 2019, completing the Project's permitting process; and,

· Financing expected to be completed at the Singida asset level with various options being considered.

 

Exploration and Future Potential at Singida

 

· Total inferred resources outside of the project economics amount to 6.57 Mt at 1.63 g/t for 344,000 oz;

· Inferred ounces have been prioritised for evaluation, with conversion potential through further drilling;

· All gold resources at Singida sit within Shanta's existing mining licenses; and,

· Ongoing resource exploration and optimisation work will target extension of the longevity of the project beyond six years and improvement of the Project's NPV.

 

Shanta Gold updates

 

· Production in October and November have been the strongest two months of 2018;

· November production included a daily record at New Luika Gold Mine of 2,631 tonnes ore mined at a grade of 6.9 g/t for 584 oz contained gold, from the underground;

· Shanta remains on track to achieve full year guidance for 2018 of approximately 80,000 oz at an AISC US$750 /oz; and

· Exploration drilling at Quartzberg, 45km east of NLGM, is underway.

 

Eric Zurrin, Chief Executive Officer, commented:

"Singida has always been an exciting project for the Company and has the potential to propel Shanta to a gold producer with over 100,000 oz per year by 2020. The development of Singida unlocks value for us, with very attractive economics including an IRR of 67%."

 

"We are making steady progress with the Singida funding plan, which as we have stated previously, will be completed at the asset level and not through Shanta Gold shareholders. I look forward to providing a more detailed update in Q1 2019, with a target to complete the funding during the course of 2019."

 

 

Enquiries:

 

Shanta Gold Limited

 

Eric Zurrin (CEO)

+255 (0) 22 292 5148

Luke Leslie (CFO)

 

 

 

Nominated Adviser and Broker

 

Numis Securities Limited

 

Paul Gillam / John Prior / James Black

+ 44 (0) 20 7260 0000

 

 

Financial Public Relations

 

Tavistock

 

Charles Vivian / Barnaby Hayward / Gareth Tredway

+44 (0) 20 7920 3150

 

 

About Shanta Gold Limited

Shanta Gold is an East Africa-focused gold producer. It currently has defined ore resources on the New Luika and Singida projects in Tanzania and holds exploration licenses covering approximately 1,500km2 in the country. Shanta's flagship New Luika Gold Mine commenced production in 2012 and produced 79,585 ounces in 2017. The Company has been admitted to trading on London's AIM and has approximately 779 million shares in issue. For further information please visit: www.shantagold.com.

 

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

 

 

Singida Project Economics

 

The strategy for Singida is to unlock value from existing resources within the Company's mining licenses. The project economics are based on internally prepared management estimates using the Singida Internal Owners Team, formed of professionals from New Luika Gold Mine across all disciplines. The project economics have not been independently verified.

 

Internally estimated project economics provide for the processing of 2.4 million tonnes of ore from surface mining at an average grade of 2.3 g/t for the production of 158,000 oz of recovered gold, over an initial six-year mine life.

 

The Singida project economics include the following key metrics:

 

 

Singida project economics summary

Projected mine life

Six years (excluding construction)

NPV (post-tax) at 8%

US$31 m

Pre-production working capital requirement

US$3 m

Pre-production capital requirement

US$16 m

Total capital expenditure over project life

US$27 m

Life of Project cash cost

US$794 /oz

Project IRR

67%

 

Key Assumptions

Gold price

Current gold forward curve1

Processing recovery - Gold

91%

Mill throughput capacity

438,000 tonnes pa

Plant availability

94%

Plant utilisation

98%

 

1

Gold Price (US$/oz) 

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

 

1,296

1,331

1,366

1,401

1,437

1,472

 

The current gold forward curve is based on a spot gold price of US$1,225 /oz and gold prices in future years reflecting the current interest rate differential. Year 1 in the above table represents the year 2020. Source: CME Group

 

Pre-production capital expenditure of US$16.0 m is comprised of US$7.2 m for construction and installation of a processing plant, US$4.4 m for key infrastructure, US$3.2 m for construction of a tailings storage facility and US$1.2 m for initial open pit development.

 

Quotations for capital expenditure have been procured and received in 2018, with a substantial planned input from local suppliers in line with Shanta's philosophy of local content. The pre-production capital estimate has significantly benefited from previous capital spend at the Project, including:

· Construction of the mine camp;

· Resettlement, including financial compensation and re-housing of families from the project site; and

· Drilling and testing of water supply boreholes.

 

Project economics are based on externally validated assumptions including metallurgical test work, mineral resource estimates, and capex and opex quotations.

 

The Project is expected to enter commercial production within 15 months of becoming fully funded. As a result, Project IRR stands at 67%.

 

There remains considerable scope to optimise the project economics through further review of operating parameters as well as through the definition of additional resources.

 

NPV (post-tax) sensitivity to Discount Rate (US$ m):

 

Gold price

Discount rates

5%

8%

10%

US$1,200 /oz

22

18

16

US$1,300 /oz

30

26

23

Forward Curve

36

31

28

US$1,400 /oz

38

33

31

 

It is anticipated that the first corporate tax charge for the Project under the newly-incorporated Singida Resources Plc will become payable in 2021. Payments are expected to be partially offset by accumulated tax losses until 2023.

 

IRR sensitivity to Gold Price (%):

 

Gold price

IRR (%)

US$1,200 /oz

47

US$1,300 /oz

62

Forward Curve

67

US$1,400 /oz

77

 

 

Annual production for the first six years is expected to average 26,000 oz. A cut-off grade of 0.7 g/t has been utilised for each of the deposits. There are lower grade areas that currently fall outside the mine plan, but which could be mined with no additional development, thereby providing gold price optionality. Engineered pit shell designs have been developed based on a long-term gold price of US$1,300 /oz.

 

 

PRODUCTION

 

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

TOTAL

 

 

 

 

 

 

 

 

 

 

Open Pits

 

 

 

 

 

 

 

 

 

Material Mined

Tonnes

5,767,726

4,594,025

3,182,814

7,418,607

3,475,293

1,353,799

-

25,792,264

Ore Mined

Tonnes

370,849

365,759

371,782

585,204

333,211

360,320

-

2,387,123

Strip Ratio

x

14.55

11.56

7.56

11.68

9.43

2.76

-

9.59

Grade

g/t

2.48

2.63

2.82

2.18

1.95

1.42

-

2.25

Contained Gold

oz

29,616

30,915

33,727

41,013

20,855

16,403

-

172,530

 

 

 

 

 

 

 

 

 

 

Processing

 

 

 

 

 

 

 

 

 

Tonnes Milled

Tonnes

370,849

365,759

371,782

403,486

403,486

403,486

68,277

2,387,123

Head Grade

 g/t

2.48

2.63

2.82

2.18

2.05

1.59

1.59

2.25 

Recovery

 %

91%

91%

91%

91%

91%

91%

91%

91%

Total Gold Produced

oz

26,950

28,133

30,692

25,732

24,220

18,788

3,179

157,695

 

 

A summary of operating costs is provided below.

 

COSTS

 

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

TOTAL

 

 

 

 

 

 

 

 

 

 

Open Pit Mining

$/oz

346

355

289

371

460

309

0

353

Processing

$/oz

225

213

198

257

273

352

352

248

G&A

$/oz

85

82

76

89

95

120

84

89

Royalty & Selling

$/oz

97

100

103

105

108

111

113

104

Cash Operating Cost

$/oz

754

750

666

822

935

892

549

794

 

Exploration and Future Potential at Singida

 

Total inferred resources that presently sit outside of the project economics amount to 6.57 Mt at 1.63 g/t for 344,000 oz.

 

These resources can potentially benefit from further exploration, have been prioritised for further evaluation and have the advantage of sitting within the current mining license areas with close proximity to the proposed processing plant.

 

The project economics are currently designed to maximize mill throughput during the first five years of production and as such any resource conversion has the potential to extend the mine life beyond the initially anticipated six-year period.

 

 

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCEASALEDEPFFF
Date   Source Headline
24th Apr 20237:00 amRNSQ1 2023 Production and Operational Update
12th Apr 20237:00 amRNSPublication of 2022 Sustainability Report
4th Apr 20237:00 amRNSDividend Timetable Confirmation
31st Mar 20237:00 amRNSFirst Gold Pour at Singida Gold Mine
29th Mar 20237:00 amRNSAnnual Results for the year ended 31 December 2022
14th Mar 20233:52 pmRNSTR-1: Notification of major holdings
27th Feb 20237:00 amRNSGroup Reserves and Resources Statement
22nd Feb 20237:00 amRNSWest Kenya Project Resource Update
13th Feb 20237:00 amRNSSingida Project Update
7th Feb 202310:17 amRNSDirector Dealing and Issue of Equity
6th Feb 20237:00 amRNSDirectorate and Executive Management Changes
26th Jan 20237:00 amRNSWest Kenya Resource Announcement
18th Jan 20237:00 amRNSQ4 2022 Production and Operational Update
16th Dec 202211:15 amRNSBlocklisting Six Monthly Return
28th Nov 20227:00 amRNSWest Kenya Drilling Results at Ramula Camp
17th Nov 20227:00 amRNSWest Kenya Phase 2 High Grade Drilling Update
15th Nov 202212:39 pmEQSShanta Gold said rejected bids did not reflect value of the business
14th Nov 202211:05 amRNSSecond Price Monitoring Extn
14th Nov 202211:00 amRNSPrice Monitoring Extension
14th Nov 20227:49 amRNSStatement regarding Shandong Gold Group, Limited
14th Nov 20227:41 amRNSUpdate on Recent Approaches and Outlook
14th Nov 20227:00 amRNSRule 2.8 Announcement
10th Nov 20228:36 amRNSForm 8.5 (EPT/RI)
8th Nov 20222:39 pmRNSForm 8.3 - Shanta Gold Limited
7th Nov 20226:29 pmRNSForm 8.3 - Shanta Gold
7th Nov 20228:55 amRNSForm 8.5 (EPT/RI)
7th Nov 20227:00 amRNSWest Kenya Phase 2 High Grade Drilling Update
4th Nov 20228:32 amRNSForm 8.5 (EPT/RI)
3rd Nov 20229:25 amRNSForm 8.3 - Shanta Gold Limited
3rd Nov 20228:38 amRNSForm 8.5 (EPT/RI)
2nd Nov 20229:01 amRNSForm 8.5 (EPT/RI)
2nd Nov 20227:00 amRNSStatement regarding Yintai Gold Co., Ltd
2nd Nov 20227:00 amRNSNew Luika Gold Mine Exploration Drilling Update
1st Nov 20228:22 amRNSForm 8.5 (EPT/RI)
31st Oct 20222:42 pmRNSForm 8.3 - Shanta Gold Limited
31st Oct 202212:49 pmRNSForm 8.3 - Shanta Gold
31st Oct 20228:37 amRNSForm 8.5 (EPT/RI)
28th Oct 20223:12 pmRNSForm 8.3 - Shanta Gold Limited
28th Oct 20229:02 amRNSForm 8.5 (EPT/RI)
27th Oct 20226:49 pmRNSForm 8 (OPD) Shanta Gold Limited
27th Oct 20228:53 amRNSForm 8.5 (EPT/RI)
26th Oct 20221:59 pmRNSForm 8.3 - Shanta Gold Limited
26th Oct 20221:58 pmRNSForm 8.3 - Shanta Gold Limited
26th Oct 20221:56 pmRNSForm 8.3 - [Shanta Gold Limited]
26th Oct 20221:56 pmRNSForm 8.3 - [Shanta Gold Limited]
26th Oct 20228:45 amRNSForm 8.5 (EPT/RI)
26th Oct 20227:00 amRNSQ3 2022 Production and Operational Update
25th Oct 20226:21 pmRNSForm 8.3 - Shanta Gold Limited
25th Oct 20223:55 pmRNSNotice of Results
25th Oct 20229:12 amRNSForm 8.5 (EPT/RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.