Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSavannah Resources Regulatory News (SAV)

If you are a professional, HNW or sophisticated investor and want to learn more about the current investment opportunity in Peloton Minerals, please submit your details here.

Share Price Information for Savannah Resources (SAV)

Share Price is delayed by 15 minutes
Get Live Data
6.30    0.05 (0.80%)
Bid:
6.20
Ask:
6.40
Spread: 0.20 (3.226%)
Market Cap: £162.25m
SAV Live PriceLast checked at - London Stock Exchange

Intraday Savannah Resources Share Chart

Ravene Drill Programme Completed at Mutamba

1 Feb 2017 07:00

RNS Number : 6592V
Savannah Resources PLC
01 February 2017
 

 

Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining

 

1 February 2017

 

Savannah Resources Plc

Ravene Drilling Programme Completed at Mutamba Project, Mozambique

 

Savannah Resources plc (AIM: SAV) ('Savannah' or 'the Company'), announces that it has completed drilling at the Ravene deposit in Mozambique (Figures 1-3 - See PDF), which forms part of the Mutamba (mineral sands) Project, being developed by Savannah and Rio Tinto as part of a consortium agreement (the 'Consortium'). To view the press release with the illustrative maps and diagrams please use the following link:

 

http://www.rns-pdf.londonstockexchange.com/rns/6592V_-2017-1-31.pdf

 

 

HIGHLIGHTS:

· Completed a total of 107 drill holes for a total of 2,914m at the Ravene deposit over a 21km strike of potentially mineralised sand dunes

· Targeted high-grade zones where past drilling has returned results of up to 14.7% Total Heavy Minerals ('THM')

· Drilling was carried out on a 1,000m x 500m grid to infill existing drilling carried out by Rio Tinto previously

· Results will be used to estimate an initial inferred resource over the Ravene prospect to potentially increase the Mutamba Project's recently defined initial Indicated and Inferred Mineral Resource Estimate of 3.5 billion tonnes at 3.8% THM

· All samples from the drilling are currently being analysed for their heavy mineral concentration

· The analysis is expected to be completed in February with results available thereafter

· The results of the resource estimation will be fast tracked and included into the commissioned scoping study, which is currently underway

 

Savannah's CEO, David Archer said: "The completion of this fast-paced resource definition drilling programme highlights the capabilities of Savannah's in-country operations team. The programme was planned to more precisely define the high-grade zones of THM at the Ravene deposit, which we believe could increase the current global Indicated and Inferred Mineral Resource inventory of 3.5 billion tonnes at 3.8% THM at the Mutamba Project North. We look forward to receiving the drill results in the coming weeks, which we intend to include in our scoping study for the project, which is underway and continues to progress well."  

 

Introduction

 

The Ravene deposit is part of the Mutamba Project and is situated to the northeast of the Dongane deposit as outlined by previous drilling, and is located on the same system of sand dunes that host the high concentrations of heavy minerals at Dongane. The Ravene deposit is relatively under-evaluated and indications suggest that it has the potential to host significant zones of high-grade heavy minerals, with previous drilling by Rio Tinto highlighting specific zones of significant heavy minerals with values up to 14.7% THM, carried out on a 1,000m x 500m grid. This 1km spacing of the drill lines is considered too wide to provide enough confidence for an inferred resource estimation.

 

The aim of the drilling at Ravene was to infill the original grid on a 500m line spacing to provide drilling information at a concentration of 500m x 500m. The results from this programme will be used to as the basis for an anticipated maiden Mineral Resource Estimate at Ravene, which will feed into the scoping study that is currently underway.

 

The Mutamba Project is subject to a consortium agreement between Savannah and Rio Tinto and is operated by Savannah. The Mutamba Project includes the Mutamba Project North (consisting of Jangamo, Dongane and Ravene deposits) and the Chilubane deposit is located 180km to the southwest of the Mutamba Project North. The current resource statement includes only the Jangamo and Dongane deposits (Figure 1 - See PDF).

 

Figure 1. Mutamba Project Location Map - See PDF

Figure 2. Mutamba North Project Location Map - See PDF

 

Ravene Drill Programme

 

The mineralisation at Ravene is found within an extensive set of dunes that NE-SW and are found along the entire extent of the Ravene tenement arm. The drilling at Ravene (Figure 3 - See PDF) was carried out over a 21km extent of these mineralised dunes, and is targeting specific zones of high-grade mineralisation to add to the significant resources already outlined at Dongane and Jangamo. Previous drilling intersected several zones with high concentrations of heavy minerals with grades of up to 14.7% THM. Other zones of greater than 10% THM were seen in 14 other drill holes.

 

Drilling at Ravene started during the middle of December 2016, targeting the mineralised dunes outlined by the previous drilling. The area drilled is split into two zones, consisting of a northern and southern zone, separated by a large blow-out of recent dune cover. The programme was completed in January 2017, with 107 holes drilled for a total of 2,914m. Samples from the drilling have been submitted for analysis to determine the concentration of heavy minerals in each sample interval. All of the samples are currently in the laboratory and it is expected that the final results will be available for the resource estimation in February 2017.

 

Figure 3. Map of the Ravene prospect area with Savannah's completed drilling (blue) and existing drilling (black) - See PDF

 

Competent Person

 

The information in this document that relates to exploration results is based upon information compiled by Mr Dale Ferguson, Technical Director of Savannah Resources Limited. Mr Ferguson is a Member of the Australian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Ferguson consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears.

 

The information in this document that relates to the resource estimation is based upon information compiled by Mr Colin Rothnie, an independent consultant. Mr Rothnie is a Member of the Australian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Rothnie consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears.

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

**ENDS**

 

For further information please visit www.savannahresources.com or contact:

 

David Archer

Savannah Resources plc

Tel: +44 20 7117 2489

David Hignell / Gerry Beaney (Nominated Adviser)

Northland Capital Partners Ltd

Tel: +44 20 3861 6625

Jon Belliss / Elliot Hance

(Corporate Broker)

Beaufort Securities Ltd

Tel: +44 20 7382 8300

Charlotte Page /

Lottie Brocklehurst

St Brides Partners Ltd

Tel: +44 20 7236 1177

 

Notes

Savannah Resources Plc (AIM: SAV) is a growth oriented, multi-commodity, mineral development company.

 

Mozambique

Savannah operates the Mutamba heavy mineral sands project in Mozambique in collaboration with Rio Tinto, and can earn a 51% interest in the related Consortium, which has an established initial Indicated and Inferred Mineral Resource Estimate of 3.5 billion tonnes at 3.8% THM over the Jangamo and Dongane deposits. Under the terms of the Consortium Agreement with Rio Tinto, upon delivery by Savannah of the following Savannah will earn the corresponding interest in the Mutamba Project: scoping study - 20%; pre-feasibility study - 35%; feasibility study - 51%. Additionally, the Consortium Agreement includes an offtake agreement on commercial terms for the sale of 100% of production to Rio Tinto (or an affiliate).

 

Oman

Savannah has interests in two copper blocks in the highly prospective Semail Ophiolite Belt in Oman. The projects, which have an Indicated and Inferred Mineral Resource of 1.7Mt @ 2.2% copper and high-grade intercepts of up to 56.35m at 6.21% Cu, with gold credits, provide Savannah with an excellent opportunity to potentially evolve into a mid-tier copper and gold producer in a relatively short time frame. Together with its Omani partners, Savannah aims to outline further mineral resources to provide the critical mass for a central operating plant to develop the deposits and in December 2015 outlined exploration targets of between 10,700,000 and 29,250,000 tonnes grading between 1.4% and 2.4% copper.

 

Finland

Savannah has Reservation Permits over two new lithium projects, Somero and Erajarvi, covering an area of 159km² in Finland. Savannah holds a 100% interest in these projects through its Finnish subsidiary Finkallio Oy. Geological mapping has highlighted the presence of seven pegmatites across the licence areas - two on Somero and five on Erajarvi - with key lithium minerals petalite, spodumene and lepidolite all identified in hand specimens. Follow up work to further expand and define the pegmatites in readiness for drilling is being planned for the second quarter of 2017 (after winter).

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUASBRBNAAOAR
Date   Source Headline
4th Oct 20237:00 amRNSBarroso Lithium Community Newspaper
29th Sep 20237:00 amRNSInterim Results for Six Months Ended 30 June 2023
28th Sep 202312:05 pmRNSParish Council legal action against APA/Ministry
19th Sep 202311:10 amRNSMr Manohar Pundalik Shenoy
18th Sep 20233:15 pmRNSStatement Re Media Speculation
18th Sep 20237:00 amRNSUpdated Corporate Presentation
12th Sep 20237:00 amRNSAppointment of CEO and Non-Executive Directors
6th Sep 20237:00 amRNSBarroso Lithium Project Update
31st Jul 202310:10 amRNSTotal Voting Rights
27th Jul 20237:00 amRNSUpdated Corporate Presentation
21st Jul 20234:13 pmRNSInterview with Savannah CEO
21st Jul 20232:30 pmRNSDirector/PDMR Shareholding
20th Jul 20237:00 amRNSInvestor Presentation
18th Jul 20237:00 amRNSPrimaryBid Offer increases Fundraise to £6.5m
14th Jul 20237:00 amRNSResult of £6.1 million Placing & Subscription
13th Jul 20234:39 pmRNSPrimaryBid Offer
13th Jul 20233:53 pmRNSProposed Fundraise
3rd Jul 20237:00 amRNSUpcoming Barroso Lithium Project Milestones
19th Jun 202310:40 amRNSResult of AGM
19th Jun 20237:00 amRNSChairman’s AGM Statement
13th Jun 202311:06 amRNSInterview with Savannah CEO on New Scoping Study
12th Jun 20237:01 amRNSNew Corporate Presentation
12th Jun 20237:00 amRNSBarroso Lithium Project: New Scoping Study
5th Jun 202311:11 amRNSPDMR Notification
31st May 20237:01 amRNSNew Corporate Presentation
31st May 20237:00 amRNSApproval of Environmental Impact Statement (DIA)
25th May 20237:00 amRNSNotice of AGM
21st Apr 20231:15 pmRNSDirector/PDMR Shareholding
20th Apr 20237:00 amRNSBarroso Lithium Project EIA Update
5th Apr 20231:35 pmRNSBarroso Lithium Project Update
5th Apr 20237:00 amRNSFinancial Results for Year Ended 31 December 2022
3rd Apr 20233:25 pmRNSBarroso Lithium Project EIA Update
27th Mar 20237:00 amRNSBarroso Lithium Project Update
24th Mar 20237:00 amRNSCorporate Video
23rd Mar 20237:00 amRNSBarroso Lithium Project EIA Update
17th Mar 202311:17 amRNSSavannah welcomes EU’s Critical Raw Materials Act
16th Mar 20237:00 amRNSBarroso Lithium Project EIA Submission
3rd Mar 20234:40 pmRNSSecond Price Monitoring Extn
3rd Mar 20234:35 pmRNSPrice Monitoring Extension
23rd Feb 20237:00 amRNSBarroso Lithium Project EIA Update
14th Feb 20232:15 pmRNSBarroso Lithium Project Update
6th Feb 20237:00 amRNSBarroso Lithium Project Decarbonisation Update
27th Jan 20239:08 amRNSLapse of Heads of Agreement with MRG Metals Ltd
18th Jan 20237:00 amRNSSocial Impact Assessment Update
30th Dec 20227:00 amRNSUpdate on Heads of Agreement with MRG Metals Ltd
22nd Dec 20227:00 amRNSNew Corporate Presentation
20th Dec 20227:00 amRNSEnvironmental Impact Assessment Review Update
19th Dec 20227:00 amRNSCorporate Video
16th Dec 20227:00 amRNSMembership of Euromines
28th Nov 20221:48 pmEQSSavannah Resources having 'useful and productive meetings' with Portuguese regulator

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.