Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSavannah Resources Regulatory News (SAV)

If you are a professional, HNW or sophisticated investor and want to learn more about the current investment opportunity in Peloton Minerals, please submit your details here.

Share Price Information for Savannah Resources (SAV)

Share Price is delayed by 15 minutes
Get Live Data
6.30    0.05 (0.80%)
Bid:
6.20
Ask:
6.40
Spread: 0.20 (3.226%)
Market Cap: £162.25m
SAV Live PriceLast checked at - London Stock Exchange

Intraday Savannah Resources Share Chart

Ravene Drill Programme Completed at Mutamba

1 Feb 2017 07:00

RNS Number : 6592V
Savannah Resources PLC
01 February 2017
 

 

Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining

 

1 February 2017

 

Savannah Resources Plc

Ravene Drilling Programme Completed at Mutamba Project, Mozambique

 

Savannah Resources plc (AIM: SAV) ('Savannah' or 'the Company'), announces that it has completed drilling at the Ravene deposit in Mozambique (Figures 1-3 - See PDF), which forms part of the Mutamba (mineral sands) Project, being developed by Savannah and Rio Tinto as part of a consortium agreement (the 'Consortium'). To view the press release with the illustrative maps and diagrams please use the following link:

 

http://www.rns-pdf.londonstockexchange.com/rns/6592V_-2017-1-31.pdf

 

 

HIGHLIGHTS:

· Completed a total of 107 drill holes for a total of 2,914m at the Ravene deposit over a 21km strike of potentially mineralised sand dunes

· Targeted high-grade zones where past drilling has returned results of up to 14.7% Total Heavy Minerals ('THM')

· Drilling was carried out on a 1,000m x 500m grid to infill existing drilling carried out by Rio Tinto previously

· Results will be used to estimate an initial inferred resource over the Ravene prospect to potentially increase the Mutamba Project's recently defined initial Indicated and Inferred Mineral Resource Estimate of 3.5 billion tonnes at 3.8% THM

· All samples from the drilling are currently being analysed for their heavy mineral concentration

· The analysis is expected to be completed in February with results available thereafter

· The results of the resource estimation will be fast tracked and included into the commissioned scoping study, which is currently underway

 

Savannah's CEO, David Archer said: "The completion of this fast-paced resource definition drilling programme highlights the capabilities of Savannah's in-country operations team. The programme was planned to more precisely define the high-grade zones of THM at the Ravene deposit, which we believe could increase the current global Indicated and Inferred Mineral Resource inventory of 3.5 billion tonnes at 3.8% THM at the Mutamba Project North. We look forward to receiving the drill results in the coming weeks, which we intend to include in our scoping study for the project, which is underway and continues to progress well."  

 

Introduction

 

The Ravene deposit is part of the Mutamba Project and is situated to the northeast of the Dongane deposit as outlined by previous drilling, and is located on the same system of sand dunes that host the high concentrations of heavy minerals at Dongane. The Ravene deposit is relatively under-evaluated and indications suggest that it has the potential to host significant zones of high-grade heavy minerals, with previous drilling by Rio Tinto highlighting specific zones of significant heavy minerals with values up to 14.7% THM, carried out on a 1,000m x 500m grid. This 1km spacing of the drill lines is considered too wide to provide enough confidence for an inferred resource estimation.

 

The aim of the drilling at Ravene was to infill the original grid on a 500m line spacing to provide drilling information at a concentration of 500m x 500m. The results from this programme will be used to as the basis for an anticipated maiden Mineral Resource Estimate at Ravene, which will feed into the scoping study that is currently underway.

 

The Mutamba Project is subject to a consortium agreement between Savannah and Rio Tinto and is operated by Savannah. The Mutamba Project includes the Mutamba Project North (consisting of Jangamo, Dongane and Ravene deposits) and the Chilubane deposit is located 180km to the southwest of the Mutamba Project North. The current resource statement includes only the Jangamo and Dongane deposits (Figure 1 - See PDF).

 

Figure 1. Mutamba Project Location Map - See PDF

Figure 2. Mutamba North Project Location Map - See PDF

 

Ravene Drill Programme

 

The mineralisation at Ravene is found within an extensive set of dunes that NE-SW and are found along the entire extent of the Ravene tenement arm. The drilling at Ravene (Figure 3 - See PDF) was carried out over a 21km extent of these mineralised dunes, and is targeting specific zones of high-grade mineralisation to add to the significant resources already outlined at Dongane and Jangamo. Previous drilling intersected several zones with high concentrations of heavy minerals with grades of up to 14.7% THM. Other zones of greater than 10% THM were seen in 14 other drill holes.

 

Drilling at Ravene started during the middle of December 2016, targeting the mineralised dunes outlined by the previous drilling. The area drilled is split into two zones, consisting of a northern and southern zone, separated by a large blow-out of recent dune cover. The programme was completed in January 2017, with 107 holes drilled for a total of 2,914m. Samples from the drilling have been submitted for analysis to determine the concentration of heavy minerals in each sample interval. All of the samples are currently in the laboratory and it is expected that the final results will be available for the resource estimation in February 2017.

 

Figure 3. Map of the Ravene prospect area with Savannah's completed drilling (blue) and existing drilling (black) - See PDF

 

Competent Person

 

The information in this document that relates to exploration results is based upon information compiled by Mr Dale Ferguson, Technical Director of Savannah Resources Limited. Mr Ferguson is a Member of the Australian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Ferguson consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears.

 

The information in this document that relates to the resource estimation is based upon information compiled by Mr Colin Rothnie, an independent consultant. Mr Rothnie is a Member of the Australian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Rothnie consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears.

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

**ENDS**

 

For further information please visit www.savannahresources.com or contact:

 

David Archer

Savannah Resources plc

Tel: +44 20 7117 2489

David Hignell / Gerry Beaney (Nominated Adviser)

Northland Capital Partners Ltd

Tel: +44 20 3861 6625

Jon Belliss / Elliot Hance

(Corporate Broker)

Beaufort Securities Ltd

Tel: +44 20 7382 8300

Charlotte Page /

Lottie Brocklehurst

St Brides Partners Ltd

Tel: +44 20 7236 1177

 

Notes

Savannah Resources Plc (AIM: SAV) is a growth oriented, multi-commodity, mineral development company.

 

Mozambique

Savannah operates the Mutamba heavy mineral sands project in Mozambique in collaboration with Rio Tinto, and can earn a 51% interest in the related Consortium, which has an established initial Indicated and Inferred Mineral Resource Estimate of 3.5 billion tonnes at 3.8% THM over the Jangamo and Dongane deposits. Under the terms of the Consortium Agreement with Rio Tinto, upon delivery by Savannah of the following Savannah will earn the corresponding interest in the Mutamba Project: scoping study - 20%; pre-feasibility study - 35%; feasibility study - 51%. Additionally, the Consortium Agreement includes an offtake agreement on commercial terms for the sale of 100% of production to Rio Tinto (or an affiliate).

 

Oman

Savannah has interests in two copper blocks in the highly prospective Semail Ophiolite Belt in Oman. The projects, which have an Indicated and Inferred Mineral Resource of 1.7Mt @ 2.2% copper and high-grade intercepts of up to 56.35m at 6.21% Cu, with gold credits, provide Savannah with an excellent opportunity to potentially evolve into a mid-tier copper and gold producer in a relatively short time frame. Together with its Omani partners, Savannah aims to outline further mineral resources to provide the critical mass for a central operating plant to develop the deposits and in December 2015 outlined exploration targets of between 10,700,000 and 29,250,000 tonnes grading between 1.4% and 2.4% copper.

 

Finland

Savannah has Reservation Permits over two new lithium projects, Somero and Erajarvi, covering an area of 159km² in Finland. Savannah holds a 100% interest in these projects through its Finnish subsidiary Finkallio Oy. Geological mapping has highlighted the presence of seven pegmatites across the licence areas - two on Somero and five on Erajarvi - with key lithium minerals petalite, spodumene and lepidolite all identified in hand specimens. Follow up work to further expand and define the pegmatites in readiness for drilling is being planned for the second quarter of 2017 (after winter).

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUASBRBNAAOAR
Date   Source Headline
17th Jun 20267:00 amRNSStakeholder engagement & bypass road update
9th Jun 20264:55 pmRNSLand Access Claim
26th May 20267:00 amRNSExercise of Share Options
21st May 202612:20 pmRNSResult of Annual General Meeting
21st May 20267:00 amRNSAGM Statement
18th May 20267:00 amRNSTechnical work update and first capex purchase
11th May 20267:00 amRNSNotification of Major Shareholding
6th May 202612:30 pmRNSSecond temporary land access granted
1st May 20267:00 amRNSEquity Incentive Plan Awards
21st Apr 20267:00 amRNSInvestor Presentation
17th Apr 20267:00 amRNSHolding(s) in Company
16th Apr 20267:00 amRNSFinancial Results & Notice of AGM
7th Apr 20267:00 amRNSInvestor Presentation
23rd Mar 20267:00 amRNSProject Timetable Update
20th Mar 20267:00 amRNSHolding(s) in Company
26th Feb 20267:00 amRNSProject Update
21st Jan 20267:00 amRNSOfficial signing of the Portuguese State Grant
15th Jan 20267:00 amRNSProject and Market Update
9th Jan 202611:08 amRNSApproval of up to €110m Portuguese State Grant
23rd Dec 20257:00 amRNSChanges To Technical Team
23rd Dec 20257:00 amRNSChanges To Technical Team
19th Dec 20257:00 amRNSAcquisition of Aldeia Mining Lease - Update
19th Dec 20257:00 amRNSAcquisition of Aldeia Mining Lease - Update
12th Dec 20257:00 amRNSRESourceEU Action Plan – Update
4th Dec 20257:00 amRNSReconfirmation of Strategic Project Status
1st Dec 202511:30 amRNS-RSavannah CEO interviewed on Vox Markets
26th Nov 20257:00 amRNSOperational and Sector Update
25th Nov 20257:00 amRNSPurchase of shares by CEO
21st Nov 20257:00 amRNSNotification of Major Shareholding
19th Nov 20257:00 amRNSNotification of Major Shareholding
11th Nov 20253:40 pmRNSResult of RetailBook Offer
11th Nov 20257:00 amRNSInvestor Presentation
7th Nov 20257:40 amRNSInvestor Presentation via Investor Meet Company
7th Nov 20257:26 amRNSResult of Accelerated Bookbuild and Subscription
6th Nov 20255:37 pmRNSRetail Offer
6th Nov 20255:11 pmRNSProposed Fundraise
27th Oct 20257:00 amRNS-RMoU with local healthcare group
23rd Oct 20257:00 amRNSParticipation in trade delegations to Japan
21st Oct 20257:00 amRNSDismissal of Legal Claim
7th Oct 20257:01 amRNSBoard Changes
7th Oct 20257:00 amRNSNotification of Major Shareholding
29th Sep 20257:00 amRNSEquity Incentive Plan – Update
29th Sep 20257:00 amRNSChange of Registered Office
24th Sep 20257:00 amRNSInterim Results for six months ending 30 June 2025
23rd Sep 20258:55 amRNS-RInvestor Presentation
15th Sep 20257:00 amRNSBarroso Lithium Project - JORC Resource Update
4th Sep 20257:04 amRNSProject Update
21st Aug 20257:00 amRNSFinal Assays for Updated Resource Estimates
28th Jul 20257:00 amRNSEquity Incentive Plan
28th Jul 20257:00 amRNSInvestor Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.