The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSavannah Resources Regulatory News (SAV)

Share Price Information for Savannah Resources (SAV)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.45
Bid: 3.30
Ask: 3.60
Change: -0.15 (-4.35%)
Spread: 0.30 (9.091%)
Open: 3.45
High: 3.50
Low: 3.30
Prev. Close: 3.45
SAV Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

High Priority VMS Drill Targets - Block 4 Oman

7 Sep 2015 07:00

RNS Number : 2048Y
Savannah Resources PLC
07 September 2015
 



 

Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining

7 September 2015

Savannah Resources Plc

High Priority Potential VMS Drill Targets Identified - Block 4 Oman Project

 

Savannah Resources plc (AIM: SAV) ('Savannah' or 'the Company') advises that it has received positive modelling results from the Versatile Time Domain Electromagnetic ('VTEM') survey conducted at its 408km² Block 4 Copper Project, located in the strongly mineralised Semail Ophiolite in northern Oman, which highlights the potential for Volcanic Massive Sulphide ('VMS') clusters. As a result of these findings, the Company has finalised new drill targets. Savannah is earning a 65% shareholding in the Omani company, Al Thuraya LLC, the owner of the Block 4 licence project ('the Project'). To view the release with the illustrative map please use the following link:

 

http://www.rns-pdf.londonstockexchange.com/rns/2048Y_-2015-9-6.pdf

 

Highlights:

 

· Identified multiple high priority drill targets proximal to previously producing copper mines which collectively produced over 190,000t copper

· Seven areas (Figure 1) with high concentrations of Priority 1 and 2 VTEM anomalies or potential VMS clusters were modelled

· A total of 29 VTEM targets were modelled, including seven Priority 1, 19 Priority 2 and three Priority 3 anomalies

· Modelling has identified a series of strong, near surface conductors up to 350m in strike length and extending at least 200m down dip, with strong potential to be the result of VMS mineralisation

· VTEM anomalies are in the vicinity of known VMS deposits and mineralisation indicating excellent potential for the newly identified VTEM anomalies to be part of a VMS cluster

· Field operations underway to fast track towards drilling, which is expected to commence towards the end of September 2015

 

Savannah's CEO, David Archer said, "We and our Joint Venture partners are particularly pleased with these highly encouraging new results from our recent VTEM survey over Block 4. Detailed modelling has highlighted a series of high priority VTEM anomalies in favourable geological settings in the vicinity of the old copper mines of Lasail, Aarja and Bayda and the Zuha prospect area. We are particularly encouraged by the fact that VMS deposits very rarely occur by themselves and these new results point towards the real possibility that a new VMS cluster may be present at Zuha.

 

"These early results continue to underscore the Joint Venture's strategy that through the application of systematic exploration an excellent opportunity exists in Oman to build a significant mid-tier copper producer around the development of a set of satellite deposits utilising a central processing facility."

 

VTEM (Versatile Time Domain Electromagnetics) Survey

 

The VTEM survey system operates on the same principal as a metal detector and has the ability to detect massive to semi-massive sulphide mineralisation from near surface to depths of up to 300m. Following receipt of the preliminary VTEM results (as announced on 29 June 2015), the identified VTEM target areas were modelled. Modelling targets were chosen based on their proximity to existing VMS mineralisation, geology, geochemistry, structure and geophysical signatures. The VTEM modelling process generates a 3D model of the conductive body identified from the VTEM survey to enable its prospectivity to be accessed.

 

Modelling of seven high priority VTEM target areas was completed to generate potential drill targets for follow up work. Priority targets have now been field checked to confirm that the anomalies were not as a result of cultural features and will now be followed up with further geological mapping, geochemistry, ground geophysical surveys to prioritise the targets for drill testing. Drilling is expected to commence towards the end of September 2015.

 

Initial assessment of the priority targets has identified a series of significant conductive anomalies around the existing VMS deposits at Lasail, Aarja, Bayda and new cluster of high priority anomalies around the Zuha project area. Modelling has identified a series of targets with the tops of the anomalies between 20-100m from surface, up to 350m strike length and some extending at too least 200m down dip from the top of the anomaly. Detailed modelling of the Lasail anomaly suggests that the conductive anomaly could reach as far as 500m down dip and initial analysis suggest the conductive anomaly has a strong relationship to the VMS copper mineralisation identified and partly mined in the early 1990's.

 

Initial field reconnaissance suggests that many of the high priority anomalies are associated with the very favourable Geotimes/Lasail contact zone highlighted by a fine grained sedimentary unit (umber). It is this same contact zone which hosts many of the historical deposits in the area such as Lasail, Aarja and Bayda. A good example of this setting is at VTEM Anomaly 13 (Zuha prospect, Figure 6) where the anomaly sits on the highly prospective contact on top of a heavily altered and bleached zone which shows strong signs of potentially being a feeder zone below a VMS system.

 

Competent Person

The information in this announcement that relates to exploration results is based upon information compiled by Mr Dale Ferguson, Technical Director of Savannah Resources Limited. Mr Ferguson is a Member of the Australian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (JORC Code). Mr Ferguson consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears.

 

**ENDS**

For further information please visit www.savannahresources.com or contact:

 

David Archer

Savannah Resources plc

Tel: +44 20 7389 5019

Samantha Harrison (Nominated Adviser)

Charlie Cryer (Corporate Broker)

RFC Ambrian Limited

Tel: +44 20 3440 6800

Felicity Winkles/ Charlotte Heap

St Brides Partners Ltd

Tel: +44 20 7236 1177

 

**ENDS**

Notes

Savannah Resources Plc (AIM: SAV) is a growth oriented, multi-commodity, exploration and development company.

 

Savannah has agreed to acquire 100% of Matilda Minerals Limitada which currently operates the Jangamo exploration project, and has agreed with Rio Tinto to form a joint venture in Mozambique to develop the combined Mutamba/Jangamo Project. On 31 December 2014 Savannah announced maiden, 65Mt Inferred Mineral Resource @4.2% total heavy minerals ("THM") at a 2.5% cut-off grade for Jangamo. The Mutamba, Dongane and Chilubane deposits have a combined exploration target of 7-12Bn tonnes at 3-4.5% THM (published in 2008).

 

Savannah has interests in three copper blocks in the highly prospective Semail Ophiolite Belt in Oman. The projects, which have an Indicated and Inferred Mineral Resource of 1.7Mt @ 2.2% copper and high grade intercepts of up to 56.35m at 6.21% Cu, with additional gold upside potential, provide Savannah with an excellent opportunity to potentially evolve into a mid-tier copper and gold producer in a relatively short time frame. Together with its Omani partners, Savannah aims to outline further mineral resources to provide the critical mass for a central operating plant to develop the deposits.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFIIAAIRIIE
Date   Source Headline
2nd May 20247:14 amRNSNOA Resource update and latest drilling results
30th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:03 amRNSAppointment of CEO to Board and PDMR Notification
15th Apr 20247:00 amRNSFinancial Results for Year Ended 31 December 2023
9th Apr 20247:00 amRNSUpdate on Key Project Workstreams
25th Mar 20243:16 pmRNSSavannah wins Overseas Direct Investment Award
18th Mar 20243:07 pmRNSInvestor Presentation
15th Mar 20247:00 amRNSNotification of Major Shareholding
12th Mar 20247:00 amRNSPinheiro Drilling Results Update
5th Mar 20247:00 amRNSNotification of Major Shareholding
4th Mar 20247:00 amRNSUpdate on Strategic Partnering Process
26th Feb 20248:10 amRNSPhase 1 Resource Drilling Completed
22nd Feb 20247:00 amRNSMarch 2024 Conference Participation
9th Feb 202411:09 amRNSUpdate on Lawsuit involving APA/Ministry
8th Feb 20245:02 pmRNSUpdate on Lawsuit involving APA/Ministry
2nd Feb 20245:01 pmRNSInvestor Presentation Video
30th Jan 20247:01 amRNSContinued Progress on Key Project Workstreams
30th Jan 20247:00 amRNSSavannah receives reassuring legal reviews
17th Jan 20247:00 amRNSInvestor Event
10th Jan 20247:00 amRNSBarroso Lithium Community Newspaper
5th Dec 20237:00 amRNSUpdate on Fieldwork and Other Activities
23rd Nov 20237:00 amRNSDirector Dealings
21st Nov 20237:00 amRNSDirector and PDMR Dealings
7th Nov 20235:37 pmRNSStatement on Portuguese Public Prosecutor Actions
6th Nov 20237:00 amRNSPartnering Process and Appointment of Advisers
31st Oct 20237:00 amRNSAppointment of Joint Corporate Broker
23rd Oct 20237:00 amRNSCommencement of 2023/24 Drilling Programme
17th Oct 20237:00 amRNSNon-Executive Director Dealings
16th Oct 20237:00 amRNSChief Executive Officer Dealing
4th Oct 20237:00 amRNSBarroso Lithium Community Newspaper
29th Sep 20237:00 amRNSInterim Results for Six Months Ended 30 June 2023
28th Sep 202312:05 pmRNSParish Council legal action against APA/Ministry
19th Sep 202311:10 amRNSMr Manohar Pundalik Shenoy
18th Sep 20233:15 pmRNSStatement Re Media Speculation
18th Sep 20237:00 amRNSUpdated Corporate Presentation
12th Sep 20237:00 amRNSAppointment of CEO and Non-Executive Directors
6th Sep 20237:00 amRNSBarroso Lithium Project Update
31st Jul 202310:10 amRNSTotal Voting Rights
27th Jul 20237:00 amRNSUpdated Corporate Presentation
21st Jul 20234:13 pmRNSInterview with Savannah CEO
21st Jul 20232:30 pmRNSDirector/PDMR Shareholding
20th Jul 20237:00 amRNSInvestor Presentation
18th Jul 20237:00 amRNSPrimaryBid Offer increases Fundraise to £6.5m
14th Jul 20237:00 amRNSResult of £6.1 million Placing & Subscription
13th Jul 20234:39 pmRNSPrimaryBid Offer
13th Jul 20233:53 pmRNSProposed Fundraise
3rd Jul 20237:00 amRNSUpcoming Barroso Lithium Project Milestones
19th Jun 202310:40 amRNSResult of AGM
19th Jun 20237:00 amRNSChairman’s AGM Statement
13th Jun 202311:06 amRNSInterview with Savannah CEO on New Scoping Study

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.